REPAIR OF FLOATING CONCRETE PANTOONS AND CATHODIC PROTECTION OF MOORINGS, BODRUM (KARADA) MARINA TURKEY
EKONS SCOPE OF THE PROJECT REPAIR AND PROTECTION OF 42 FLOATING CONCRETE PANTOONS REPLACEMENT OF ALL MOORING AND BUOY CHAINS REPLACEMENT OF SERVICE BOXES AND FENDERS CATHODIC PROTECTION OF ALL MOORING CHAINS SURVEY REVEALED THAT PREMATURE FAILURE OCCURED DUE TO INEFFECTIVE CONCRETE COVER AND CORROSION OF STEEL REINFORCEMENT
REPAIR METHODOLOGY DAMAGED CONCRETE WAS COMPLETELY REMOVED, MESH REINFORCEMENT REPLACED READY MIX TWO COMPONENT LATEX MODUFIED FIBER REINFORCED FLEXIBLE CONCRETE WAS THEN UTILIZED AS REPLACEMENT CONCRETE. REINFORCEMENT PROTECTED BY POLYMER RICH SLURRY REPAIRED PANTOONS SEALED OFF WITH AN IMPREGNATING AGENT DECKS WERE TREATED WITH WATER PERMEABLE EPOXY COATING WITH ROUGH FINISH
GENERAL VIEW PRIOR TOREPAIRS GENERAL VIEW PRIOR TO REPAIRS
CONDITION OF MOORING LINKS PRIOR TO REPAIRS
CORROSION DAMAGE ON INCLINED SURFACE OF PANTOONS
CORROSION DAMAGE OF PANTOONS
FAILURE OF PREVIOUS REPAIRS CARRIED OUT BY THE OTHERS
TELESCOPIC WORKING TENT OPEN POSITION
HANDLING OF PANTOONS
VIBRATING HAND HELD TROWEL IN PLACEMENT OF FLEXIBLE REPLACEMENT CONCRETE SURFACE FINISH OF THE PANTOONS
REPAIRED PANTOON READY TO BE INSTALLED IN POSITION
SERVICE DUCTING REPAIRED DECK WOOD FENDER
REPLACED RING & CONNECTOR
REPLACED CHAINS (IMMERSED PARTS CATHODICALLY PROTECTED (NOT SHOWN HERE) )
REPAIRED, PROTECTED, PLACED IN POSITION PANTOONS