Time Critical Repairs During mining plant and equipment breakdowns, the customers focus is on the turnaround time for repairs and quality of service.

Slides:



Advertisements
Similar presentations
The Proxity database is organized to allow the user to do market research on what is being acquired by the Government- who are the acquisition people involved-
Advertisements

Operations Management Maintenance and Reliability Chapter 17
Birdfield Building Services is an institution that has an experience as commercial building contractor, specializing in construction, property maintenance.
Pinjarra Engineering Reception
Capabilities – What we can do for you. Dawsons Training is a part of The Dawsons Group of Companies which is one of Australias largest privately owned.
Welcome ! Products for: Enclosures • Electronics & Communication •
DriveWorks – Product Configurator
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Confidential & Proprietary to Cooper Compliance Corporation Revised September 8, 2014 AUDiT-READY TM.
Cylinder Service Centre Limited Premier Class Provision of Cylinder Manufacturing and Repair Services.
Complex processing industries --- Iron & Steel industries.
Skyscraper Construction
Benefits of an Environmental Management System Andrew Frisbie Wabash National Corporation.
Customer relationship management.
Customer relationship management.
CourierPRO Welcomes You. CourierPRO Benefits  Using the Latest Technologies CourierPRO ensures  Seamless Integration allowing for  Increased Customer.
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
Chapter 8 Assuring the quality of external participants’ contributions
Global Construction Equipment Market
PRERNA Group Empowering Recruitment Services. Contents Mission & Vision Introduction Services Recruitment Process Technology Portfolio Industry Vertical.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
AgVantage IT Services Systems Management Team Partnered with You and IBM® Agenda Disaster Recovery Service Disaster Recovery Service IT Visors IT Visors.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Providing Safe, Secure Cargo Protection and Transportation Standards American Energy Cargo Container Association
BUILD WITH US. ™ Contractors
A PRODUCT COPYRIGHT © 2014 PATENT PENDING
An Overview of Our Regulatory Proposal
Quint Wellington Redwood ©2002 business value through IT performance Performance Based Service Management (PBSM) “A new approach for quick & measurable.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
Hancock Maintenance Services LTD. Client Benefits NO escalation fees for first 3 Years (Full contracts only) Average 2-10 % annual scheduled maintenance.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Office Management A Look from the Inside-Out Mohammad Najjar, PhD Management Science 1.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Caterpillar Tractor Co. Spring 2008 The Padres. Table of Contents I. History of EME II. Industry III. Central Question IV. Recommendations V. The Future.
1 I n t u i t C o n f i d e n t i a l Construction Estimating Software Jeff Gerardi | President | Solution Introduction.
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Specification section 3.1
“YOUR MINING, INFRASTRUCTURE & ENERGY PARTNER IN AFRICA”
Material Handling & Lifting Resource
Welcome to Address : Sr. No. 227/1, Sahakar Nagar, Dighi Road, Bhosari, Pune Phone Number:
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Lecture 2 Introduction to Earthmoving
Event Management & ITIL V3
1 LIFTINGAND INDUSTRIAL WORKS COMPANY « SOTRIM » OPERATION’S REPORT TO OUR CLIENT BG Tunisia FOR THE LAST JOBS PERFORMED.
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
Today (2/11) Class schedule update & Presentation Forums (10’) Corporate Technology Commercialization- Dr. Thomas Lindner (40’) Developing timelines and.
LINCPlus Overview Complete binding preparation module includes features such as security, titles database, reports and job costing options. Integrated.
“The Right Connection for all your staffing needs” Job Connect Recruitment Pty Ltd “Trading as Job Connect”
1 Lotus Connections Customer Use Cases The following are stories from early customer engagements. They were created to help people understand the many.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
ASPEC December 2015 Incidents –0 incidents, 0 near misses Hours 28/11/15-25/12/15 12% Site, 0.5% Travel, 78% Office.
TPCM Supporting World Class Standards Supporting World Class Mining Standards Driving Efficiencies in the Pilbara.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
TPCM Supporting World Class Standards Supporting World Class Mining Standards Driving Efficiencies in the Pilbara.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
Designed for Functionality, Engineered for Reliability 1.
HIAB TRANSPORT HIRE SERVICES BY DELTA TRANSPORT
The Cylinder Service Centre
Chapter 7: Management How Management Functions
Chapter 7 - Management.
Material Handling & Lifting Resource
Compressed Natural Gas Supply Vehicles
Milk Processing Plant Manufacturers Call Us:
The Basics of Information Systems
The Basics of Information Systems
Manufacturing’s Objectives
Presentation transcript:

Time Critical Repairs During mining plant and equipment breakdowns, the customers focus is on the turnaround time for repairs and quality of service as opposed to cost. Swift has the equipment, technology, software and facilities, capable of producing components faster and of a higher quality than any of its competitors. As a result, Swift has become the supplier of choice for time critical breakdown services and achieves significantly higher margins than that of a typical engineering company.

Why Swift Swift has: The necessary equipment to profile cut and bend components in house and does not rely on subcontractors or steel merchants A purpose built facility with 120t lifting capacity, capable of manufacturing, refurbishing and repairing the largest mining equipment Custom designed software integrated with leading technology, facilitating a more efficient and higher quality service Parts library consisting of thousands of customer parts, enabling the customer to have replacement parts cut out within minutes

Why Swift Swift has: Stock items register including detailed drawings of equipment located on Customers sites Laser cutting, which eliminates time consuming sub processes, such as marking out and drilling A stable skilled labour force of 130 employees Substantial steel plate stocks, in excess of 300 tonnes, varying in grade and thickness Proven ability to consistently deliver in challenging situations

Case Studies a) Hitachi – Time critical repairs to Excavators b) BHP Billiton (Port of Haypoint) - Time critical repairs to Telescopic Chute

a) Hitachi – Time critical repairs to Excavators Swift is an approved and preferred supplier to Hitachi for breakdown maintenance and repairs to their fleet of excavators. Hitachi have sold these excavators to major earthmoving contractors such as Roche Mining, Leighton Contractors and Thiess. Swift secured this work initially after Thiess requested that Swift carry out repairs to the EX 5500 during a breakdown situation. Swift were able to provide a very quick turnaround time on all repairs, which were of an excellent quality. Hitachi now send all repairs to Swift on a cost plus basis knowing they are better positioned to make the highest quality repairs, in the shortest possible time.

Swift received excellent feedback after the repairs to the excavator were completed. Paul Thompson from ETRS carried out Non Destructive Testing for Hitachi on the repairs and communicated that Swift had done an excellent job. The following correspondence was via All welded repairs were of excellent quality and the assistance from Swift staff was outstanding. Could you please pass on our thanks to Swift management Paul Thompson Senior NDT Consultant ETRS - Mackay

Again on behalf of HCA and ETRS, thanks to your team for their support and commitment Jason Cantoni CORPORATE SUPPORT GROUP HITACHI CONSTRUCTION MACHINERY AUSTRALIA

Who does Hitachi call for Time Critical repairs?

This Hitachi 5500 excavator was left within the blast zone at Coppabella mine. The cost to Leighton Contractors of having this 9 million dollar machine not operating was substantial. Hitachi immediately gave the time critical job of repairing this machine to Swift.

Swift responded by breaking the components up into suitable jobs which best suited their facilities. A team of people were assigned to major components and worked around the clock until the job was completed.

Key Points Swift had the man power and systems in place, which allowed them to respond immediately to this time critical job. A significant amount of working in confined space was required to complete the work. Confined space is a specialized area and Swift had the necessary skills and procedures in place to safely complete the work. Swift had the required plate stock to begin cutting and bending the replacement components without delay. The large mainframe was able to be lifted into Swifts purpose built heavy equipment facility, without hiring in mobile cranes Time savings were made on many of the lighter components such as cowlings, by utilizing laser cutting.

Swift have captured this market and are now the preferred supplier to all major players including Hitachi, Liebherr and Terex for time critical repairs. Ongoing repairs of excavators involve repairs of cracking and replacement of highly stressed components on the machine.

b) BHP Billiton (Port of Haypoint) – Time critical repairs to Telescopic Chute Swift are the preferred supplier at Haypoint for any breakdown maintenance and repairs. Swift have a strong history at the port for on- time and successfully completed projects, during shutdown and breakdown situations.

On the 20th of January 2006 the telescopic chute on ship loader #, collided with a coal ship, snapping it off. The telescopic chute was bent in the process rendering it un-repairable. The port was already suffering from ……

With the port unable to load ships ….. With cost to the port mounting at a reported, Swift was given the job of constructing a replacement.

Swift had previously constructed the telescopic chute and therefore was able to quickly retrieve part shapes from their parts database. Parts were then automatically nested into stock plates and cutting commenced with out delay. Parts were rolled into shape and the telescopic chute was constructed in unprecedented time.

Key Points Swift had the required plate stock to begin cutting and rolling the replacement components without delay. Swift did not need to rely on any steel merchants or subcontractors to complete the repairs Significant time savings were achieved by laser cutting all flanges on the telescopic chute No redrafting was required as Swift had the parts preprogrammed in their database