GERAN update on ER-GSM band

Slides:



Advertisements
Similar presentations
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
Advertisements

#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Doc.: IEEE /0530r1 Submission November 2007 Gerald Chouinard, CRCSlide 1 Wireless Microphone Sensing IEEE P Wireless RANs Date:
A new challenge – creating a regulatory environment for implementing geo-location databases for White Space Devices (WSD) Andy Gowans Date (26 th January.
Cellular TDD in TIA Eric Jacks LinkAir Communications TIA TR45 Meeting Ft. Lauderdale, FL March 5, 2003 Notices: The contributor grants.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
Presentation to the Portfolio Committee on Science and Technology By Vodacom (Pty) Ltd 1 August 2007.
SOURCE: Du Yunqi ABSTRACT: This contribution provides some information of Galileo system to clarify some questions based on.
Doc.: IEEE b Submission May 2012 Preliminary Link Budget Analysis for b IEEE P802.22b Wireless RANs Date: Authors:
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation WG FM Correspondence Group on GSM-R ETSI & GERAN update on ER-GSM band.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation ETSI RTEGSM-R #18 ETSI & GERAN update on ER-GSM band introduction 27.
1 OFDMA Module Usage within Seamcat. Summary 2  Using generic or OFDMA model when addressing compatibility/sharing studies?  Pointing out differences.
Compatibility measurements UMTS/LTE/GSM -> GSM-R Thomas Hasenpusch Federal Network Agency, Germany CG-GSM-R(13)033.
Doc.: IEEE /0583r0 Submission May 2005 Simon Black et al, NokiaSlide 1 STA receiver performance indication Notice: This document has been prepared.
1 OFDMA Module Usage within Seamcat. Summary 2  Using generic or OFDMA model when addressing compatibility/sharing studies?  Pointing out differences.
Power control Considerations and framework for MS-MS Communications
Optimisation of Radio Spectrum Usage
1210 MHz of harmonised spectrum (ECC framework)
Coexistence challenges in the UHF band
GRSC Radio Microphone Task Force Report
Comments on LAA EVM Date: Authors: January 2015 Month Year
Spectrum demand estimation
GSM/Mobile Network in Accident Relief Trains, Railway Factories,
Private GSM/Mobile Network
Mobile Broadcast and Spectrum Issues (DVB-T) Workshop April 2003
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Power control Considerations and framework for MS-MS Communications
Basic examples of setting simulations: A REAL CASE
Studies on 5 GHz extension bands for WAS/RLANs
Month Year doc.: IEEE yy/xxxxr0 November 2017
Evaluation Model for LTE-Advanced
Basic examples of setting simulations: A REAL CASE
Proposal for ETSI BRAN to restrict blocking energy
Overview of IEEE Date: Authors: September 2014
Proposed response to 3GPP ED request
Radio spectrum for future railway applications
eCall: Creating momentum towards the networked car
February 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PHY considerations for low power body.
WRAN Propagation Study
Liaison statement and Request for Specification and Implementation of Harmonised Pan-European Emission Limits relevant for the GSM-R Operating Range.
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
Aggregated Interference from CPEs
EU-US-JP ITS Steering Group Annual Meeting 2018
MHz FCC Action Date: Authors: March 2005
Submission Title: Link Budget for m
Submission Title: Status Report of European UWB Regulatory Activities
eCall: Creating momentum towards the networked car
Wireless Microphone Sensing
WRAN Propagation Study
Submission Title: European UWB Regulations Date Submitted: 14 May 2003
Discussion Topics Date: Authors: March 2011 Month Year
Random Access Mechanism for WRAN System with Adaptive Antennas
Comments on LAA EVM Date: Authors: January 2015 Month Year
PHY Mask Issues Date: Authors: November 2006 November 2006
MA’s Response to Selected Comments
Tutorial Introduction Section
CX-CBP in 3.65GHz – Simulation results
Beamforming Weight Adaptation for Dynamic Channel Switching
CX-CBP in 3.65GHz – Simulation results
November 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [UWB Coexistence Issues] Date Submitted:
Liaison Report to Date: Authors:
May 19 March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: European Regularity Considerations.
Comments on LAA EVM Date: Authors: January 2015 Month Year
MHz FCC Action Date: Authors: May 2006 May 2006
July, 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Propagation notes to P SG3a from IEEE.
Notes on TGu liaison November 2005 Date: Authors:
3gpp-liaison-report-may-2005
Presentation transcript:

GERAN update on ER-GSM band 11. 04. 2013 UIC RF WS GERAN update on ER-GSM band 11. 04. 2013 05.05.2019

Introduction Standardisation work progressing to include ER-GSM band into relevant Standards ETSI TC RT activities closed 3GPP GERAN activities ongoing... ...ETSI MSG activities pending 873 918 876 921 880 925 890 935 P-GSM E-GSM R-GSM ER-GSM 915 960 UL DL 05.05.2019 05.05.2019

Frequency ecosystem in the Standards 3GPP 1st step ETSI TC RT GSM railway TSG GERAN GSM GPRS EDGE EN defining R-GSM band 301 515 Change Request needed to refer to ER-GSM band New version of TS mentioning ER-GSM band TS 45.001 TS 45.005 (RF parameters) TS 51.010 TS 51.021 (conformance testing) MSG European Harmonized Standards EN defining R-GSM band 301 502 301 511 TSG CT CN Function (VGCS, billing) TS 24.008 (signalling capabilities) Harmonized Standard = applicable at EU level 2 phases approach: need to update 3GPP TS first 05.05.2019

3GPP GERAN activities 1/2 During 3GPP GERAN # 57 a Liaison Statement from 3GPP RAN4 was received Reminder: RAN4 is responsible for UTRA/E-UTRA specifications (UMTS and LTE experts) The LS answers the GERAN question on UMTS and LTE BS sensitivity and blocking performances not explicitly defined in RAN4 specifications  RAN4 recommends to set mitigation techniques (e.g. power reduction), so that Minimum Coupling Loss of 104/106 dB is ensured between ER-GSM BTS emission and UTRA/E-UTRA reception Based on this answer NSN proposed a further proceeding No question about RAN4 assumptions, but a segmentation approach of the ER-GSM band into different sub- bands, with power levels for each sub-band left to be defined in the co-existence study  Mechanism allowing to minimize the power reduction required by RAN4 (see slide 6) Kapsch CarrierCom disagreed with the conclusions from RAN4 Assumptions on sensitivity of UTRA/E-UTRA equipments seem to be under evaluated, estimated blocking requirements at 918 MHz very conservative  Critics rejected as RAN4 recommendations on their specifications prevail Limitations of the emissions of ER-GSM equipments should be subject to regulatory rules and not 3GPP specifications  Public operators and Industry firmly in favour of a mandatory requirement in TS 45.005 05.05.2019

3GPP GERAN activities 2/2 Kapsch CarrierCom presented 4 contributions Update of the co-existence analysis  further parameters refined to take into consideration inputs from Public Industry and RAN4 Set of Change Requests to include ER-GSM in GERAN specifications TS 45.001, 45.005 and 24.008 (see slide 3) TR 45.050 "RF scenarios"  Proposal to have no mandatory requirement in the main specifications and informative part in the TR Proposal was discarded by Public operators and Industry and they would prefer to have a direct reference to the obligation of non-impact of ER-GSM equipments in the main specifications Offline discussion was held where Kapsch CarrierCom proposed a way forward See next slides for details Generally Public operators and Industry ok with it Way forward not officially communicated, waiting for Railway Operators opinion 05.05.2019

Simulation of impact: NSN proposal In their Proposed Further Proceeding NSN Retained ER-GSM BTS power level of 6/8 dB for coexistence with UTRA/E-UTRA from RAN4 assumptions Highlighted that power level at 921.2 MHz can be up to 48-50 dBm without restriction Proposed segmentation of ER-GSM band to allow for different carrier output power levels depending on the frequency offset to the GSM 900 UL band Assuming the 40 dB are equally distributed on 3 segments of 1MHz each power limits would be Power limit C (918-919 MHz) = 6/8 dBm  coverage distance divided by 8 Power limit B (919-920 MHz) = 19/21 dBm coverage distance divided by 4-5 Power limit A (920-921 MHz) = 32/34 dBm  coverage distance divided by 2-3 05.05.2019

Offline session: proposed way forward Participants and goal Kapsch CarrierCom, NSN, Ericsson, Telecom Italia, Vodafone Attempt to find a compromise solution based on all comments expressed during the official ER-GSM session Main result: it is proposed to add the following paragraph in TS 45.005 05.05.2019

Analysis of the proposed way forward 1/2 Preliminary remarks The proposed way forward is a drastic change from RAN4 and NSN proposals: No limitation of emission power at ER-GSM BTS side Instead it considers emission levels received at victim system In practice the proposed way forward is not directly binding ER-GSM emission, but will require analysis from a regulatory body to assess if victim system is indeed receiving exceeding levels Would a regulator require ER-GSM BTS to minimize the levels at victim side this could be done either by power reduction or engineering modification (antenna gain, tilt, ...) Explanations about figures in the proposed way forward Reappraisal of RAN4 inputs would lead to considerable delays with jeopardized success Values of -40.4, -58.7 and -60.7 dBm and slope of 13 dB/MHz are taken from Kapsch CarrierCom co-existence study on ER-GSM introduction (including RAN4 inputs) 05.05.2019

Analysis of the proposed way forward 2/2 Graphic representation of the proposed way forward 05.05.2019

Simulation of impact Goal and Working assumptions The following analysis derives the worst case scenarios (e.g. 104/106 dB of MCL as assumed by RAN4) to simulate the distance at which a ER-GSM BTS should be placed from a victim system to ensure safe operation of UTRA/E-UTRA equipments  Kapsch CarrierCom is of the opinion that MCL is over estimated and that real cases interferences are likely to be lower than in the simulations The following working assumptions are taken ER-GSM BTS: output RF power = 45 dBm, antenna gain = 17 dB, no tilt, coupling losses = 5dB Victim system: antenna gain = 13 dB, cable losses = 3 dB, tilt effect = 4 dB 3 aiming configuration considered: 0 dB (ER-GSM antenna pointing directly to UMTS site), -3 dB (30° from UMTS site direction), -10 dB (60° from UMTS site direction) Propagation models: Free space model (only valid for distance < 5 km), Hata Urban & Sub-Urban (valid for distance > 1 km) 05.05.2019

Simulation of impact: victim considered = MCBTS 05.05.2019

Simulation of impact: victim considered = UTRA 05.05.2019

Simulation of impact: victim considered = E-UTRA 05.05.2019

Conclusions Pros of the way forward Cons of the way forward Balance power at 3GPP GERAN level not in favour of the railways Inductive limitation (received signals at victim system): implication of regulatory bodies Different methods to implement mitigation if required Limited impact on deployment scenarios provided RAN4 assumptions are unrealistic Fastest way to finalize ER-GSM band introduction in 3GPP GERAN specifications Cons of the way forward Some channels will not be available in dense urban areas Could jeopardize deployment scenarios of ER-GSM sites even years after  unless a precedence rule is established stating that the way forward is not applicable to UMTS/LTE sites activated after ER-GSM BTS deployment 05.05.2019

Next steps RTEGSM-R #14 meeting on 23-24 April in Munich Drafting of Change Requests / Liaison Statement towards 3GPP GERAN 3GPP GERAN #58 meeting on 13-17 May in Xiamen Continued discussion on impact from ER-GSM band introduction onto existing systems Approval of Change Requests? 05.05.2019

Thank you for your attention. Thomas Chatelet Railways Regulatory Affairs Railways Customer Solutions Management Kapsch CarrierCom France SAS SITE DE IMMONTIGNY | 1 RUE JEAN PIERRE TIMBAUD | CS 80737 | 78066 SAINT QUENTIN EN YVELINES CEDEX Phone +33 (0)1 30 23 71 43 | Mobile +33 (0)6 64 04 78 81 E-mail thomas.chatelet@kapsch.net | www.kapsch.net Please Note: The content of this presentation is the intellectual property of Kapsch AG and all rights are reserved with respect to the copying, reproduction, alteration, utilization, disclosure or transfer of such content to third parties. The foregoing is strictly prohibited without the prior written authorization of Kapsch TrafficCom AG. Product and company names may be registered brand names or protected trademarks of third parties and are only used herein for the sake of clarification and to the advantage of the respective legal owner without the intention of infringing proprietary rights. 05.05.2019

www.kapsch.net 05.05.2019