Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Armand Racine Consultant Chemicals Branch
Michael Egan Head of Corporate Affairs National Roads Authority Development and Implementation of the National Roads Programme in Ireland
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
The Implementation Structure DG AGRI, October 2005
ENEA, 12. September 2005 WWF Handbook and Score-card Presentation by Stefanie Lang,
Report to TACIR on Underground Utility Damage Prevention in Tennessee
The Committee and Research – Where are we and where might we be going?
Title I, Part A and Section 31a At Risk 101
Project Appraisal Module 5 Session 6.
During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Bridge Owners Forum Code of Practice for Bridge Management Research Opportunities Graham Cole s.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
2008 COMPREHENSIVE PLAN Town of Sullivans Island, South Carolina Draft Plan recommended by Planning Commission to Town Council on December 10, 2008 January.
Integrated Approach to Area Master Planning in Jubail Industrial City
LESNER BRIDGE REPLACEMENT PROJECT
Pavement, Geotechnical and Structures Group Safety Standards and Research Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners.
Stakeholders and the Public
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
1 Functional Strategy – IS & IT Geoff Leese November 2006, revised July 2007, September 2008, August 2009.
Strategic Financial Management 9 February 2012
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
PAS Recent achievements and new proposals Beijing, October/2008 PERFORMANCE AUDIT SUBCOMITTEE.
1 K. C. Lo / L. M. Chow Power Systems Business Group CLP Power Knowledge Management in CLP Power Oct 2004.
IT’S IN THE EYE OF THE INSPECTOR Overview of visual inspection methods in four countries and lessons learned ISFD4, Toronto 6 May 2008 Jaap Flikweert.
Development update for BOF meeting – 14 June 2005.
Louisiana Safe Routes To School Program
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Cambridge –16 Jan
TRP Chapter Chapter 1.3 Developing a hazardous waste policy and strategy.
Road Network Contingency Planning. FTA introduction – The Resilience Review The recommendations and importance to the strategic road network The Highways.
CONDITION APPRAISAL AND REMEDIAL TREATMENT CIRIA Research Project RP692 MASONRY AND BRICK ARCH BRIDGES:
FM Guidance for Design Teams MEFMA Focus Group. Team Members Neil Blakey FM Consultant, Mace Macro Stuart Clayton Project Manager, Serco Middle East Ryan.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Author: Lornet LD team Reuse freely – Just quote Cognitive Science Education Science Software Engineering The basis.
1 Ministry of Transport, Public Works and Water Management.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
ConstructionSkills Amanda Sergeant - Regional Strategy Adviser, East Midlands.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
6 th International Workshop on Micropiles Tokyo, Japan, August 24-27, 2004 Development of ADSC-FHWA Micropile Teaching Module into NHI Course Dr. Donald.
Department of Civil Engineering,
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
1 International Workshop on Micropiles May , 2002 Venice, Italy Full Scale Field Tests on Single Micropiles and Groups/Networks of Titan Micropiles.
Development update for BOF 17. Slide 2 CIRIA Arch Manual final draft circulated to SG for comment internal CIRIA review completed returned to research.
Dr. Bhavani Thuraisingham Information Security and Risk Management June 5, 2015 Lecture #5 Summary of Chapter 3.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
UKRLG Codes of Practice Review LoTAG Conference London 11 May 2015 John Paterson 1.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
planning aid for scotland unique national charity helping people engage with planning impartial & independent not part of Scottish Government or any Local.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
The Scottish Ferries Review Consultation Document Gourock 23 August 2010 Judith Ainsley.
US Army Corps of Engineers BUILDING STRONG ® FIMS Annual Comprehensive Training Bridge File Content and Management May 2016.
Development of ADSC-FHWA Micropile Teaching Module into NHI Course Dr
Sustainable Development of Waterways in Wales
Historical problems Tasks being done; just not coordinated and effective. No clear line of sight to client (Highways England) objectives. No defined asset.
INTRODUCTION TO THE BRIDGE INSPECTION AND MAINTENANCE SYSTEM (BIM)
The Technical Opportunities and Economic Implications of Permafrost Decay on Public Infrastructure in the Northwest Territories Ed Hoeve, P. Eng., TetraTech.
Life Cycle Costing.
Presentation transcript:

Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008

Definition in our context A stone wall, built without mortar, to retain soil or weak rock specifically for use on the infrastructure and may have been strengthened after construction (modifications)

National and Local Highway Authorities – responsible for some 400,000km of roads Network Rail – responsible for some 16,000km routes British Waterways – responsible for some 3540km of canals British Rail Properties Board (residuary) Ltd. Owners of Drystone Retaining Walls

Background and project team proposed by bridge owners forum started Dec 2005 Final Draft Stage managed by CIRIA funded by – CSS, DoT, Net. Rail, DRDNI Steering Group – wide input CIRIA – Philip Charles – Chris Chiverell contractors – Dr Myles OReilly – Consultant – Dr John Perry – Mott MacDonald

The challenge drystone retaining walls are vital elements of the UKs highway, rail and canal networks almost all of these structures were built in the late 18 th, 19 th and early 20 th centuries over the intervening years many of these drystone retaining walls have been repaired most often by pointing estimates put the replacement value of the surviving structures at about £6 ± 1 billion at 2000 prices by their nature there are special difficulties with the condition appraisal and preservation of such aged infrastructure thus, the most economic and sustainable approach is to provide practical guidance to enable the residual value of this infrastructure to be maximised

Title of report Drystone Retaining Walls and their modifications: condition appraisal and remedial treatment

Purpose of the report to present best practice to facilitate knowledge sharing to provide an enabling document to have national application to recommend an auditable conservation strategy for best value for money

Contents Chapter 1. Introduction and background 2. Management of drystone retaining walls 3. Understanding the stability of drystone retaining walls 4. The inspection and qualitative assessment of drystone walls 5. Maintenance, repair and renewal 6. Repairing drystone retaining walls 7. Replacing drystone retaining walls

Contents (cont.) Chapter 8. Research and development 9. Summary and recommendation 10. References Appendices 1. Literature review 2. Extracts from Highways Agency documents 3. Examples on inspection reporting 4. Stability of existing masonry retaining walls and their strengthening 5. Stability of existing masonry retaining walls and their strengthening 6. Case histories

Main user groups Clients (asset owners and operators) engineers (consultants and contractors) managers and administrators of maintenance and repair

water presence behind retaining wall properties of retained material geometry of wall stability of foundation change of circumstances Stability of Drystone Retaining Walls

Failures

Main causes of failure changed circumstances – new construction – repair works – utilities – increased dead and live loading ineffective drainage

visual based inspection/assessment assessment based on results of visual assessment need for engineering judgement regular inspection essential information collation for improvement of inspection and assessment methods Inspection and qualitative assessment

Maintenance Repairing drystone retaining walls pointing grouting soil nailing thickening embankment rebuilding

Maintenance (cont.) Replacing drystone retaining walls mass concrete reinforced concrete other solutions – ground anchors – precast units – reinforced and anchored soil – recycled masonry

Recommendations Strategic level reactive approach inconsistent with achieving a sustainable transport network need to implement effective management procedures need to provide sufficient resources of both people and money on regular basis

Recommendations (cont.) Operational level need to develop expertise and understanding of drystone retaining wall behaviour need for complete inventory need for preplanned management policy need for well trained inspectors and supervisors need to encourage co-operative working need to recognise aesthetic and environmental value need to encourage research and development and analyse accumulated data