West Connect Region Changes

Slides:



Advertisements
Similar presentations
The Western Electricity Coordinating Council Doug Tucker Associate Engineer September 22, TRD/TADS Webinar.
Advertisements

Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
WECC Glossary of Terms Reliability Policy Issues Committee April 28, 2010 Steve Rueckert Director of Standards.
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
Completed projects totaling 43,409 MW New Electric Generating Plants in Texas Since 1995 (excluding.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
3.4 – Linear Programming. Ex. 1 Graph the system of inequalities. Name the coordinates of the vertices of the feasible region. Find the max & min values.
ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
GC0096 Electricity Storage Grid Code Requirements
Modeling DER in Transmission Planning CAISO Experience
Western Electricity Coordinating Council
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Studies Work Group Update
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
Steve Rueckert – Director of Standards
WECC Regional Standards Update
2017 Study Program Discussion
Western Electricity Coordinating Council
WECC-0118 Removal of Interchange Authority
Unscheduled Flow Administrative Subcommittee MIC/OC Report
What is an Operation and Misoperation
Chris Albrecht Legal Counsel
Planning Tools Overview
DS-PDWG Approval Items
Western Electricity Coordinating Council
Misoperations in the West: Lay of the Land
3.4 – Linear Programming.
Western Electricity Coordinating Council
ADS and WPR Seed Case Background
Western Electricity Coordinating Council
WECC Performance Analysis
ERS Forward Looking Measures 1, 2 & 4
PCM (Production Cost Model) Data Work Group Webinar
ADSTF Update: Resource Mapping and Proposed Solution
West Connect Region Changes
Western Electricity Coordinating Council
2018 State of the Interconnection Overview
Maggie Peacock, Analyst
System Review Work Group
Tyler Butikofer Associate Engineer II
2019 Draft Budget Overview Jillian Lessner – Chief Financial Officer
What is an Operation and Misoperation
Planning Tools Overview
Reliability Assurance Initiative (RAI) 101
Randy Spacek AvistaCorp, RWG chair
Scenario Development Subcommittee January 4, 2018
Misoperations in the West: Lay of the Land
ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates
ADSTF Update: Resource Mapping and Proposed Solution
2019 Draft Budget Overview Jillian Lessner – Chief Financial Officer
Heather Rasmussen Communications Specialist
Western Electricity Coordinating Council
PCM (Production Cost Model) Data Work Group Webinar
ADS and WPR Seed Case Background
ADS Update: Resource Reconciliation
Maggie Peacock, Analyst
2018 WECC Loads and Resources Data Request Part 1
Western Electricity Coordinating Council
Jonathan Young SDWG Chair
MAC Report Gas-Electric Interface Study
Student Demographics Student State Required Fields.
Western Electricity Coordinating Council
Tyler Butikofer Associate Engineer II
Chris Albrecht Legal Counsel
ERS Forward Looking Measures 1, 2 & 4
PDWG Validation of the 2028 ADS PCM V1.0
Managing Data Corrections Between SDWG & PDWG
Data Subcommittee Production Cost Model Data Work Group (PDWG) Update
Tyler Butikofer Tom Carr
Presentation transcript:

West Connect Region Changes Bhavana Katyal WECC Western Electricity Coordinating Council

Western Electricity Coordinating Council West Connect Changes Error Corrections: Generators – Commission, Retirement dates, Min & Max Caps, Plant Code, Generator ID, Dev Status, Name, Subtype, Entities involved   Gen-Bus Distribution –  Ratio changes, deletion of 3 entries, Entities Involved, partial ownership changes Gen – to SSLoad : partial ownership changes.   Interface by branch Def: partial ownership changes. Interface by branch Ratings: partial ownership changes. (P23, P47, P48) Wheeling rate: rate change for SW_EPE, SW_TH_PV Western Electricity Coordinating Council

Western Electricity Coordinating Council West Connect Changes Topology Changes – Deletion of 1 DG-BTM on Bus# 11089 in EPE area Branch Deletion: Austin-Marlow Ckt 2 Western Electricity Coordinating Council