Start Up Procedures and Recommendations for Factory Authorized Equipment Start Up.

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

Purpose of a VPA Filling & Metering Pump… Imagine having an employee who constantly measures out a precise dose of liquid whenever it’s needed.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
1 FUNDAMENTAL OF ION EXCHANGE WATER SOFTENING 2 HARD WATER Water containing calcium (Ca+2) and magnesium (Mg+2), the hardness minerals. Water containing.
Perform Control Test. Check for Consistent Liquid Temperatures Entering and Leaving Liquid Temperatures should be close when the water pumps are on but.
Refrigeration Flow Control
SPILL – RESISTANT VACUUM BREAKER ASSEMBLY SVBA TESTIN G.
Water King Inc. Delivering Experience, Quality, and Service Since PRODUCT OVERVIEW.
HVACR312 - Refrigeration Metering Devices.
Filter manifold Holding tank Iron- manganese filter Aeration tank Control unit Pre- filter To storage tanks Backwash overflow SO2 vent Bypass Cutoff valve.
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
Boiler Mountings.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
Proper Pump Installation Practices
Dennis Sabre Fire Appliances
Unit 205: Cold water systems
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
FILTER-AG PLUS ® Automatic backwashing unit to dramatically reduce sediment and colour in rural surface water.
Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams
HYDRAULICS & PNEUMATICS
E2 Motors and Motor Starting
Overview of the 1.
Circuits and Symbols. The flow of electrons through a circuit Electricity A closed circuit allows electricity to flow An open circuit has a break so electricity.
Electro-Pneumatics Module 1
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
HYDRONIC HEATING AQUASTATS
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Hydraulic Symbols. Piping and Tubing Symbols Normal working line Flexible working line Pilot line Drain line Enclosure outline Direction of flow.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Water-Saving Devices For each slide, discuss this question with your partner. What do you think these devices are used for? How does it save water?
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
1 HVAC122 - Gas Gas Valves. 2 Solenoid Gas Valves The solenoid gas valve is the simplest of all valves. This valve has an electrical magnetic coil which.
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
OILGEAR PVV PUMPS PVV 200 Performance Curves.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Welcome Growers Discover the Dosmatic Difference Installing your Dosmatic injector for years of service.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
James McIntyre VRF Training Manager V5 Key Components.
HYDRAULIC OVERSPEED CONTROL
Quick Start Guide for Flex Flow Pump
Pumped Discharge. Brian Makin 14/
E3 HVACR Controls and Devices
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Actuators Topics covered in this presentation:
Compressor Safety Practices
ATM 322 – Pneumatics Module 4
Sequence Valves.
Case sample of a CT option
Tracker cooling loop “check out” draft for discussion
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Staying in Compliance: Spill and Overfill
Actuators & Directional Control Valves
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
PLUMBING PLANS CHAPTER 31
Connect-CELL Sales Training 2018 Introduction Overview How They Work
Fuel Supply System Service
Service /13/2018 Water King Service 101
Troubleshooting 11/14/2018 Water King Service Seminar.
Compressor Safety Practices
EXAMPLE-#1 Connection at Meter Service
Consulting Captains, LLC
R3 Controls, Valves, Accessories & Heat Pumps
Manual D Duct Sizes Room Cooling CFM % Total CFM Heating CFM Kitchen GR Dining Bed Bed 3.
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Detailed Design Review Solar Thermal Water Heater
Presentation transcript:

Start Up Procedures and Recommendations for Factory Authorized Equipment Start Up

Prepare Before You Go! Review all documentation Call the contractor Keep notes Bring contact names and phone numbers

Prepare Before You Go! Has the plumbing been completed? Has the system been pressure tested? Has the resin and gravel been loaded?

Prepare Before You Go! Has the electrical been completed? Are vessels full of water? Does he know of any problems during installation?

Show Up, Meet, and Greet

Things to Check - Piping Review piping with Plumbing Contractor (Let him explain it)  Does it match Piping Diagram? Are the shut off kits correctly installed? Check tubing. Is it run correctly?

Things to Check - Piping Is the manual bypass valve in the correct location? Is drain piping correctly sized? Are the flow meter(s) positioned correctly?

Things to Check – Brine System Is the brine tank correctly installed? Make certain the float is not dragging in the brine tank. Is the water level up to the float in the brine tank? Is the external injector properly installed? (for larger systems)

Things to Check - Electrical Review electrical with electrical contractor (Let him explain it) Double check wiring. Does it match electrical drawings from manuals? Check terminals strips for correct locations and tightness.

Things to Check - Controls Control Valves Electronic Demand Regenerator (EDR) Program at this time Flow Meter Solenoid Valves (ASCO)

Ready to Go . . . .

Getting Started Close Outlet Valves Open Bypass Valve Open Inlet Valves (s l o w l y) Vent each Vessel  Power Up

After Power is Connected Make certain every thing works. On twin system, one unit will go to stand by. ASCO will energized & get warm. Diaphragm Valve will be closed. Check with paper clip. If it goes in more than 1 ¼, valve is open. Warm ASCO, Valve should be closed.

Work with the Unit in Stand By

Manually Start Regeneration from Timer Piston will move to backwash cycle. Check flow to drain. Watch for resin in drain. Water may be discolored. (color throw) Does flow match O & M? Do not leave in this cycle longer than one minute.

Advance Timer to Brine Draw Position Is water level in Brine Tank moving down?

Advance Timer to Fast Rinse Position Check flow to drain. Does flow match O & M? Watch for resin. Water may be discolored. (color throw) Do not leave in this cycle longer than one minute.

Advance timer to Service Position Repeat short cycles until water to drain is clear

Repeat with Other Units Start Up Presentaion Repeat with Other Units until both units have been completely rinsed

Place System Online Ask operator for permission to open outlet valves. Open outlet valves slowly. Close Bypass Valve. Water pressure should stabilize.

Check Operation of EDR II Verify water flow from EDR  Re-program EDR preset to 1 to start a regeneration.  Verify that 3-minute start signal was sent from EDR II to Taskmaster control valve. Re-program EDR II with presets to original calculations.

Final Equipment Check Make certain both outlet valves are open. Check system unit over completely.

Training Explain the process and operations to the operator. Show them how to use the operations manual to their benefit. Answer all questions.

You are the Pro Start Up Presentaion until both units have been completely rinsed

The End