Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC Status Fri Morning 3-June
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 14th March Second fill with pilot + 3 nominal bunches
Monday fill with 1092 bunches (6 h stable beams)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Weekend: Sat 11th – Mon 13th Reasonably smooth running Saturday:
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Monday – recovery from MKI flashover
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Tuesday 22 November 2011.
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Scrubbing progress - 08/12/2012
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Tue/Wed 12/ :00 Probe beam back again
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Tuesday 20 September 2011.
Thursday
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Tuesday
Presentation transcript:

Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access Piquet EL has changed the three fuses on electrical distribution. Piquet EPC has not found any fault on their power supplies. 9 minutes of stable beams…. 11:35 Injecting again, fill #1855, 1092 + 12 non colliding bunches 13:09 Prepare ramp 13:15 Beam lost before ramping, UFO near MKI Point 2 15:56 Stable beams, lumi’s around 1.1e33 Alice using automatic lumi levelling (same as LHCb) 22:30 Adjust for RF test, switching off one cavity per beam 23:41 Stable beams back 07:28 Beam dump due to bad current reading on RTQX2.R1 This is a known problem, FGC issue– already happened Friday morning inner triplet IP5 Try to fix this morning… Fill did 42 pb-1 in 15h30min, minus one hour without stable beams 08:00 MKI magnet at 54 degrees (interlock @ 55) – SoftStart to check kick 07/06/2011 LHC 8:30 meeting

Point 2 UFO near MKI Brennan G. BLMs on MKID and MKIC were the first to go above threshold - These thresholds are factor ~5 lower than adjacent elements. - Beams dumped while losses still rising. Fit to the data gives an expected peak of about 11 Gy/s, which is a factor 3 above the loss recorded. - Gaussian fit to the data gives an RMS of about 780 us. Beam size at MKID (assuming 2.2 um) is about 0.37 mm, which gives a speed of 0.47 m/s for a hypothetical transiting dust particle. - Losses seem to start at the MKID monitor - at the upstream Q5 there are losses but these are a factor 200 lower - Except for MKIs and TCTH, the losses everywhere were a factor 5 -10 below dump threshold Brennan G. 07/06/2011 LHC 8:30 meeting

RF test: Switching off one cavity Switching off cavity B1, followed by B2. Study reflected power and debunching After ramp: B1 @ 1.2 ns, B2 @ 1.1 ns For the RF transients, there is barely any difference compared to the measurement done with 912 bunches on May 28th at the beginning of the fill (0.9 MV and 115 kW). At the time we had almost the same total intensity (1.1E14). The B1 abort gap increase was double that of B2, and this may be related to the lack of B2 longitudinal blow up during the ramp Philippe B. 07/06/2011 LHC 8:30 meeting

Injection Ramp Injection Ramp Too low bunch length => direct impact on image current heat loads! Injection Bunch L B1 1.1 ns ARCs 34 & 56 mostly penalised Ramp Injection Longer bunch length => lower heat loads 1.2 ns Very homogeneous behaviour of all arcs Ramp Serge C.

Plan Chromaticity measurements at injection after this long fill to get data for FIDEL (1.5 hours) Also non-linear chromaticity for Wolfgang Try to fix FGC in the same time Physics 1092 x 1092 bunches Some fills with additional 12 non-colliding bunches Outstanding End of fill: TCL adjustment Test ramp with new RF blow-up control (12 bunches) 07/06/2011 LHC 8:30 meeting