ASEP Allocation Graphs

Slides:



Advertisements
Similar presentations
CST Warm-Up: 10/22/13.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
with Ms. Barton $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
Entry Capacity Buy Backs Feeder 7 Shutdown July 2006 National Grid NTS Dave Adlam 3 August 2006.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
World Forum on Energy Regulation IV Athens, Greece October , 2009 Regulating EU Gas Supply Security in a Global Gas Market P Jacques de Jong Clingendael.
1 CALCULUS Even more graphing problems
National Grid: Gas Transmission System Operator
ACT Class Opener: om/coord_1213_f016.htm om/coord_1213_f016.htm
Barton St Peter’s Advent Calendar.
A study into the benefits which storage facilities may provide to the UK gas transmission system Nick Wye Presentation to NTS Charging Methodology Forum.
Gas Customer Forum Transmission Update Chris Logue 9 th July 2007.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Entry Capacity Substitution Workshop 5 – 5 th December 2008 Review and Options for Development.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Entry Capacity Substitution Workshop 8 – 7 th April 2009.
Достопримечательности Лондона. WELCOME TO LONDON.
Lessons from developments in the past ten years – GB experience Alison Kay – National Grid, Transmission Commercial Director.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
A GAS FLOW MODEL FOR THE NTS NETWORK MELVIN BROWN CLAUDIA CENTAZZO JOGT Meeting, London, 5 June 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
September 2008 QSEC auction - Allocations Transmission Workstream
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Review Group 221: 23 January Analysis of the impacts of the proposal on Users.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
MIPI European Transparency Project (ETP) 10 th September 2010.
Trades and Transfers Workshop, 6 th November 2007.
Flow Flexibility Business Rules Ritchard Hewitt. Items to resolve today  Nodal or Zonal release.  If zonal  Preferred Number of zones.  Extent of.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Notes Over 2.1 Graph the numbers on a number line. Then write two inequalities that compare the two numbers and and 9 l l l.
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
Crude Oil Storage Storage tanks containing crude oil and H2S are monitored by Model S4000T Intelligent Sensors. The sensors are dedicated to monitoring.
Here is the graph of a function
Section 5.4 Limits, Continuity, and Rational Functions
SEP OCT NOV 6th Sep 1st Oct 1st Nov System Code is deployed
مدیریت استراتژيک منابع انسانی
High Schools offering French
DRSEC Update August 4th 2009.
European Transparency Requirements
Offshore Interview Series (Going deep into the rabbit hole)
Section 7.1 – Rational Expressions
Use this key to help you identify human and physical features on your maps.
Action from Workshop 3 – SUB010
A graphing calculator is required for some problems or parts of problems 2000.
Graph 2x + 4y = 16 by finding the x and y intercepts.
Total Distance Traveled
Honors Algebra II with Trigonometry Mrs. Stacey
Ռազմավարական կառավարում
Review of Trade and Transfer Winter 09/10
Baseline Re-consultation
Section P.5 – Rational Expressions
Quadratic Graphs.
MOD 501 Update.
Section 5.4 Limits, Continuity, and Rational Functions
Line Graphs.
Presentation transcript:

ASEP Allocation Graphs

Avonmouth Allocations

Bacton Allocation

Barrow Allocation

Barton Stacey Allocation

Burton Point Allocation

Caythorpe Allocation

Cheshire Allocation

Dynevor Arms Allocation

Easington Allocation

Fleetwood Allocation

Garton Allocation

Glenmavis Allocation

Hatfield Moor (Onshore) Allocation

Hatfield Moor (Storage) Allocation

Hole House Farm Allocation

Hornsea Allocation

Isle of Grain Allocation

Milford Haven Allocation

Partington Allocation

St Fergus Allocation

Teeside Allocation

Theddlethorpe Allocation

Wytch Farm Allocation