Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped 12.40 (after ~14h of collisions) Some issues during refill.

Slides:



Advertisements
Similar presentations
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
LHC Status Fri Morning 3-June
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Luminosity lifetime – fill 2932
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday 14th March Second fill with pilot + 3 nominal bunches
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Barbara Holzer, Jorg Wenninger
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary week 30 Week 30 R. Bailey & J. Wenninger
Wednesday 31 October: Morning
LHC commissioning Week 38
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Friday 14th December - morning
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
(on behalf of the LHC team)
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Monday 3rd September - morning
Friday 25 bunch fill dumped just before (BLM in 5)
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
07/08/2010 Fill #1264 dump at 02:14:38.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Summary Tuesday h23: Machine closed. Precycle started.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Thursday 20th July - morning
Monday 27th August & night
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
31/3/2010 Difficult day… but at the end stable beams.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Daniel, Gianluca and Belen (for the Collimator team)
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped 12.40 (after ~14h of collisions) Some issues during refill (chromaticity pushed low) Injection multi bunch not 100% OK (many IQC latches) Ramp ~ 17.00 Tune and orbit feedbacks switched off in ramp Arrived at 3.5 TeV and corrected, but lost when restart feedbacks Next ramp ~ 20.00 Lost at start of ramp due to BPM excursion at point 6 Orbit looked OK 4/26/2019 LHC status

Sunday Next ramp ~ 01.00 OK Stable beams ~ 04.00 Beams dumped ~05.00 Difficulties to get orbit under control at 3.5 TeV – Jorg Stable beams ~ 04.00 Low lifetime beam 2 Lower lumis Beams dumped ~05.00 RQD tripped Cooling in S56 Access needed Problem found ~08.00 2 hours to fix 4/26/2019 LHC status

Interventions needed Magnetic probes in the machine for the studies related to the hump - access would be required in point 5 (GA, LW) 2 hours in the shadow CV need to replace a motorisation of the water valve of the sector. Time estimate ~3h 4/26/2019 LHC status