Durability Task Force Update

Slides:



Advertisements
Similar presentations
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Advertisements

Informal Group on Gaseous Fuelled Vehicles (GFV) Report 68th GRPE January 2014 GFV report 68th GRPE André Rijnders 1 Informal document No. GRPE (68th.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
1 WLTP Open Issue Phase 1B Issue: Number of testsOIL#27. Starting note for IWG Meeting#7 Geneva, WLTP rev1e.
Informal document GRPE st GRPE, 8-12 June 2015,
Informal Group on Gaseous Fuelled Vehicles (GFV) Report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item 8 (a))
1 Bernardo MARTÍNEZ Automotive Industry Unit Transposition of EURO VI requirements into UN/ECE R49 GRPE January 2012 Submitted.
Geneva, June 2011 Effect of ambient temperature (15 °C÷28 °C) on CO2 emissions from LDV over NEDC
Draft progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by chair of IWG AECS Informal document GRSG-106-ХХ 106.
Transposition of EURO VI requirements into UN/ECE R49 Status report GRPE 9-June 2011 Submitted by the expert of European Commission 1 Informal document.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 72 nd GRPE th January 2016 Geneva Chair: Adolfo.
Informal document No. GRPE (72nd GRPE, January 2016,
WLTP Phase 2 Durability Task Force Update
Document No. WLTP-17-14e (WLTP IWG #17 – Geneva January 2017 )
WLTP IWG ISC Taskforce: Starting note
WLTP Informal Working Group
Informal Group on Gaseous Fuelled Vehicles (GFV)
WLTP Phase 2 Durability Task Force Update
1st Informal Group on WLTP Palais des Nations, Geneva
UNECE IWG on EPPR for L-category vehicles State of play
MCWG, Brussels Thomas Vercammen Petter ÅSMAN
WLTP Informal Working Group
Note by the secretariat
WLTP Informal Working Group
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
Informal document GRPE-75-18
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-77-21
Informal document GRPE-74-20
Transmitted by the IWVTA Informal Group
WLTP Phase 2 Durability Task Force Update
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
ASEP IWG Report to GRB 65th
Submitted by the experts of OICA
WLTP Informal Working Group
Informal document GRPE-78-14
IWVTA-GRPE Ambassador
Informal document GRPE Rev.1
ASEP, from 2005 to 2019 Background informations and future works
WLTP Informal Working Group
Revision of the Work Plan
Commission position on the introduction of CoP provisions for WLTP
Commission position on Japan’s proposal on class 0
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-78-23
WLTP-24-03e_UNR WLTP IWG 24th Session 18th -20th September 2018, Tokyo, Japan Update from WLTP Transposition Task Force September.
1. Summary # items RESULTS status remarks EV_1 HEV system power
WLTP Phase 2 Presentation and discussion of the Term of Reference for the Durability Task Force Paris, April th WLTP IWG meeting DG GROW.C4.
Japan contributions on Transposition TF
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Status report of TF-CS/OTA
Why a „test phase“? Overview
Informal document GRE Rev.1
WLTP Informal Working Group
Status report 4WD dynamometer taskforce
Request to GRPE for Approval of Prolongation of Mandate and
Informal document GRPE-79-19
Status Report Cop Taskforce
Informal document GRPE-79-08e
Note by the secretariat
Inputs Regard to “Test Phase” to TFCS
Adolfo Perujo (IWG chairman)
Transmitted by the expert from the European Commission
Status report of OBD Task Force
WLTP-27-02e Informal document GRPE-79-xxe
DETA Database for the Exchange of Type Approvals
UNECE WLTP COP task-Force Revision on testing Frequency
Draft UN Regulation on Cyber Security
Informal document GRBP-70-23
Presentation transcript:

Durability Task Force Update Geneva, 8 January 2019 25th WLTP IWG meeting European Commission - JRC.C4

Index Background The European post-Euro 6/VI project Durability in the UN R WLTP

Background As a result of the work carried out by the Durability TF, including the contribution of JRC and LAT for the experimental part and the literature study, the Commission came forward with a proposal for the revised WLTP Durability procedure. This proposal was presented at the DTF telco of 13 September 2018, but was not agreed. At the 24th WLTP IWG meeting of September 2018, the chair of the DTF informed the IWG that there was no room to reach a consensus on the WLTP Durability procedure in time for the Transposition informal document, which was then scheduled to be ready by end of 2018.

The European post-Euro 6/VI project In the meantime the European Commission has started the post-Euro 6/VI project, which will provide the strategy to address vehicle emissions in Europe for the next decade. Several elements of this project overlap with the WLTP Phase 2 and the Durability procedure is one of these elements. Due to the impossibility to reach a consensus at UNECE level on the WLTP Durability procedure, the Commission is of the opinion that it cannot remain as part of WLTP Phase 2. However, a solution for the Transposition project (i.e. UN RWLTP and UN R 83 08) should be found.

Durability in the UN R WLTP Deterioration factors are essential elements of the emission type approval procedure, because vehicles must show compliance with emission limits taking in account the deterioration of the after-treatment systems with mileage. For UN R WLTP it is proposed the following: For Level 1a, adopt the Durability procedure in Regulation (EU) 2017/1151 For Level 1b, adopt the Durability procedure proposed by Japan For Level 2, the Durability TF will combine the above. The timeline for this shall be aligned to the Transposition project.

QUESTIONS?