11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
RF Waveguide & Structures Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
X-band Based FEL proposal
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Sara Thorin, MAX IV Laboratory
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
NC Accelerator Structures
Chris Adolphsen Sergei Nagaitsev
Brief Review of Microwave Dielectric Accelerators
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Klystron based. Updates 2017.
Injector Performance Requirements Conventional Facilities Update
Klystron Power Supplies for ILC
LCLS Injector: Introduction D. H
CEPC RF Power Sources System
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Commissioning Parameters
Electron Source Configuration
CEPC Injector Damping Ring
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
LCLS Drive Laser Timing Stability Measurements
ATF project meeting, Feb KEK, Junji Urakawa Contents :
LCLS RF Stability Requirements
Linac/BC1 Commissioning P
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Tracking Studies CSR micro-bunching in compressors
Linac Physics, Diagnostics, and Commissioning Strategy P
Maximum Credible Beam Event Paul Emma et al
Undulator Cavity BPM System Status
Operational Experience with LCLS RF systems
LCLS Injector System Overview D. H
Linearization of Bunch Compression (2nd order )
LCLS Commissioning Parameters
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Injector/Linac Design Status C. E
Breakout Session SC3 – Undulator
SNS-PPU upgrades the existing accelerator structure
Injector/Linac RF Status
Presentation transcript:

LCLS Linac Long Lead Procurements Peter McIntosh and Carl Rago Lehman Review August 10-12, 2004

Linac LLP Outline LINAC Long Lead Procurements BC1 and BC2 Dipole Magnets Requirements LLP X-Band RF System Challenges Budget and Resources Conclusions and Summary

LINAC Long Lead Procurements (LLP) BC1 and BC2 magnets  commercial build to specification X-band system  in-house build to print

Typical Chicane Layout collimator BPM quadrupole dipole screen BX1 dipole magnets (4) required for BC1 BX2 dipole magnets (4) required for BC2

Magnet Specifications ESD sample for individual chicane dipole

BX1 Preliminary SLAC Design Mechanical envelope for build to specification

Linac Magnet LLP LCLS LINAC bend magnet specifications (ESD 1.03-101) complete and under change control Design proposal with preliminary magnetic analysis complete ES&H safety covers - latest SLAC standard incorporated Costs and schedules are baselined: Basis of Estimate verified by Thomas Jefferson Laboratory (TJLab)

BX1 and BX2 Procurement Plan Primary procurement method: Commercial Build to specification  low technical risk Vendors identified Statement of work in process with SLAC purchasing Alternative procurement method: MOU Build to specification by TJLab Work plan consistent with TJLab process

X-Band RF System Layout Klystron Gallery Klystron Window Waveguide XL-4 Klystron Accelerating structure Beam Tunnel

The X-Band RF System A 60cm long (NLC type) X-band structure will be used to linearize the energy-time correlation (or gradient) across each bunch from L0 and L1 Operates on the negative RF crest to decelerate the beam, reducing the non-linear components of the correlation  more efficient compression in BC1 and BC2 Non-linear correlation components  CSR instabilities in the chicanes. Beam energy is reduced by 18 MeV, from 268 to 250 MeV X-band structure accelerating gradient is ~32 MeV/m Bunch length compressed from 830 to 190 m c.f. 400 m without the X-band station LCLS X-Band RF Requirements (PRD 1.03-009) complete and under change control

NLCTA Comparison with LCLS Requirements Parameter LCLSTarget Achieved NLCTA Units Structure Length 60 cm Structure Voltage 19 30 MV Phase -160 - deg Klystron Power 21 50 MW Repetition Rate 120 Hz Pulse length 0.1 1.6 ms LCLS requirements easily achieved using technology developed and achieved on NLCTA: LCLS klystron power ~60% less than NLCTA LCLS structure voltage ~40% less than NLCTA

X-Band RF System Challenges RF stability and reliability issues need to be addressed for LCLS No reason to believe the XL-4 klystron phase and amplitude sensitivity to modulator stability will be much greater than that of a SLAC S-band klystron LLRF development needed to ensure the X-Band system meets LCLS stability requirements NLCTA has not run at 120 Hz repetition rate: The reliability of the klystrons at 120 Hz needs to be evaluated Good reliability expected if tube is run at a lower average power of ~30 MW  LCLS requires 21 MW Spare klystron required to reduce downtime in case of failure and minimize any operational risk

X-Band RF System LLP X-band Klystron (WBS 1.03.06.05.01): In-house manufacture to existing design, identical to 13 units already built for NLCTA 2 klystrons required (including spare) @ 1 year/tube manufacture timeframe Modulator and Pulse Transformer (WBS 1.03.06.05.02): Modified SLAC S-band modulator with redesigned klystron tank RF Distribution (WBS 1.03.06.05.03): To be designed and manufactured in-house, have extensive experience manufacturing wide variety of NLCTA X-band components X-Band Structure (WBS 1.03.06.06): Existing NLCTA (FXB-003) device (no cost burden to LCLS), achieved 65 MV/m at 63 MW input power  LCLS requires 32 MV/m at 21 MW Support and removal structure to be designed and manufactured in-house LLRF System (WBS 1.03.06.04): Adopt LLRF system developed for NLCTA and integrate with existing S-band RF system controls In-house fabrication considered most effective method of procurement for X-band RF system components – justifications identified in APP Resources from various SLAC departments needed to complete X-band RF system to budget and schedule - included in the WBS

X-Band Budget and Resource Schedule $1.2 M required in FY05: procurement of klystron and waveguide systems design/development of LLRF system and various mechanical supports

Conclusions and Summary BC1 and BC2 dipole magnets: Minimal technical risk for BC1 and BC2 dipole magnets LLP option initiated on a build to spec from commercial vendor Alternative TJLab MOU option identified if needed Physics specifications complete Statement of work and APP under review for procurement X-Band RF System: Adopting the X-Band high power RF technology developed for NLC minimizes technical and budgetary risk for LCLS SLAC has extensive in-house manufacturing experience for X-band klystron and waveguide systems APP development in progress X-band klystron and RF distribution ready for procurement Oct 1st LLRF system design commences Oct 1st