STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Technical and engineering provision of operating 100 MeV linac LUE-40 and beam testing of dielectric materials Arrangement of installation at electron.
Different mechanisms and scenarios for the local RF
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
30 GHz waveguide line modification towards 12 GHz.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Anders Sunesson RF Group ESS Accelerator Division
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
GHz High Gradient Testing of a T18 TW StructureUsing a Fast Response Protection and Power Recirculating System GHz High Gradient Testing.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
The status of RF components G. Riddone, M. Filippova RF development meeting on
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
Areal RF Station A. Vardanyan
Status of BESSY II and bERLinPro
S1G Experiment Schedule Plan
RF cell Anders Sunesson RF group leader
Awake Electrons Gun Introduction. - How works an electrons gun
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
An X-band system for phase space linearisation on CLARA
Status of the CLIC main beam injectors
on behalf of the RF group
X-band Technologies IFIC, Valencia Test Infrastructure
The situation is far better than I had thought.
SPARC RF gun status by P. Musumeci Review committee
12 GHz High Power RF components requirements for CEA activities
Shuji Matsumoto Accelerator Lab., KEK
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
DC Injector and Space Charge Simulation Status
Installation status and planning
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
Status of the cryogenic system for B180
WP Coordinaten XFEL RF Operation
BEPCII RF POWER SOURCE AND INPUT COUPLER
Accelerator Layout and Parameters
LLRF and Beam-based Longitudinal Feedback Readiness
SuperB project. Injection scheme design status
CEPC RF Power Sources System
IHEP Cryomodule Status
Advanced Research Electron Accelerator Laboratory
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
J. Seeman Assistant Director for PPA/LCLS
Compact linear accelerator FLUTE: status update
Injector / Linac Installation Current Status
ESS Bilbao RF Systems Overview Pedro J. González
Status of the ESS High Power RF Systems
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R. BONI, on behalf of the SPARC team SPARC review – nov. 16, 2005

Rectangular Waveguides & Accessories KLYSTRONS RF STATIONS PULSED MODULATORS Rectangular Waveguides & Accessories Waveguide Variable Attenuators WAVEGUIDE SYSTEM Waveguide Phase-Shifters Energy Compressor (SLED) ACCELERATING STRUCTURES SPARC review – nov. 16, 2005

SPARC RF LAYOUT SPARC review – nov. 16, 2005

KLYSTRONS Comments: ● the klystrons have been reconditioned after long inactivity. ● X-rays shielding has been improved. SPARC review – nov. 16, 2005

MODULATORS SUCCESSFULLY POWER TESTED on REAL LOAD SPARC review – nov. 16, 2005

TEST PARAMETERS VAT = 310 kV IK = 320 A V p.p.s. = 8 I Oct. 19, 2005 μperv = (I/V3/2) ~ 1.85 VAT = 310 kV IK = 320 A p.p.s. = 8 V I

WAVEGUIDE SYSTEM 90 % OF GUIDES AND OTHER RF DEVICES INSTALLED SPARC review – nov. 16, 2005

ACCELERATING SECTIONS Low Power & Vacuum tests have been carried out in the Mitsubishi factory (July, 2005) Σθi2 < 0.8 deg Σθi < ± 0.2 deg MEASUREMENT OF THE PHASE ADVANCE PER CELL Σθi2 < 1.6 deg Σθi < ± 0.13 deg Σθi < ± 2 deg Σθi2 < 3 deg @ 45°C SPARC review – nov. 16, 2005

MHI Technical documentation STRAIGHTNESS DISTORSION He leak test SPARC review – nov. 16, 2005

PROTECTIVE BAG BAKE-OUT and VACUUM TEST ACC. SECTIONS He LEAK TEST July 2005 BAKE-OUT and VACUUM TEST July 2005 ACC. SECTIONS in the SPARC HALL PROTECTIVE BAG SPARC review – nov. 16, 2005

Power test of the kly-1 line DUMMY LOAD SPARC review – nov. 16, 2005

DUMMY LOAD 20 dB ATTENUATOR SPARC review – nov. 16, 2005

JUST WAITING FOR THE PERMISSION OF THE CONCLUSIONS RF POWER SYSTEM FULLY DELIVERED AND MOSTLY ASSEMBLED READY TO POWER TEST THE WAVEGUIDE LINE N.1: Waveguide is in VACUUM Circulator is FILLED with pressurized SF6 Modulator is TESTED Electronics & Remote Controls are READY RF Cables are CALIBRATED JUST WAITING FOR THE PERMISSION OF THE ENVIRONMENT PROTECTION NATIONAL AGENCY (A.N.P.A.) SPARC review – nov. 16, 2005