East Asia Hydrographic Commission (EAHC) Three Year Work Plan

Slides:



Advertisements
Similar presentations
IHO Work Programme 2 – “Hydrographic Services and Standards”
Advertisements

13 th Capacity Building Sub-Committee Capacity Building Development - Customized Capacity Building Programmes - East Asia Hydrographic Commission(EAHC)
VIEW OF CAPACITY BUILDING FROM RECIPIENT COUNTRY - BANGLADESH BANGLADESH NAVY HYDROGRPAHIC DEPARTMENT Monaco 08 Oct 2014.
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
IRCC June 2015 (Mexico City, Mexico) Report of the Capacity Buildung Sub-Committee Thomas Dehling CBSC Chair.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) ANNUAL REPORT 2014.
MACHC CAPACITY BUILDING COMMITTEE MEETING Presented by UKHO.
CBSC-14 IHB Report Mustafa IPTES Director, IHO. Ratification of Protocol of Amendments on IHO Convention *47 of 48 approvals received. * Next IHC will.
1. SCOPE EAHC Member States EAHC Meetings & Working Group EAHC Capacity Building Activities EAHC Products Action for IRCC 2.
Regional project for Capacity Building
14th CBSC Conference 5.1C - EAtHC Report
National Report – Republic of Korea
MACHC Capacity Building Update
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Capacity Building Sub Committee Meeting Report for MACHC
Report of the Capacity Buildung Sub-Committee
EAHC Technical Visit to Timor-Leste 6 December 2016
Report by the IHO Secretariat
Captain Lamberto Orlando LAMBERTI Vice Chair CBSC
REPORT BY THE HYDROGRAPHIC AND GEODETIC SERVICE
Report of the FIG/IHO/ICA IBSC to the IHO IRCC10
Presentation by Dr Parry Oei, Chair (CHC)
The Training in Hydrographic Survey for Disaster Management and Relief will be held in Jakarta from 11 to 15 September Venue : Mercure Hotel.
Korea Hydrography and Research Association
7th EAHC TRDC-BOD MEETING
By EAHC COORDINATOR Peter You
1st Emergency Response Workshop Singapore, 18th October 2016
South West Pacific Hydrographic Commission (SWPHC)
Proposed IHO Work Programme for 2018
Update on the IHO CBSC 15 Peter YOU EAHC CB Coordinator
b. Training For Trainers (Hydrography)
Report on IRCC9 Key Issues Relating to EAHC
ESTABLISHMENT OF EAHC MSDI WG
GUSTAVO ADOLFO GUTIÉRREZ LEONES
IRCC work is guided by the IHO Work Programme 3
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
CBSC-16 Towards a new implementation of the CB strategy in the EAtHC region and a strengthened involvement of the IHO GOA, India, 30 May – 1 June 2018.
South West Pacific Hydrographic Commission (SWPHC)
Inter-Regional Coordination Committee
Jung Hyun Kim Republic of Korea EAHC Capacity Building Coordinator
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
South West Atlantic Hydrographic Commission (SWAtHC) Report
Hak Yoel (Peter) YOU Republic of Korea
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
BRUNEI MEMBERSHIP STATUS
Report from TRDC BOD6 Meeting
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
International Hydrographic Organization
RSAHC REPORT TO IRCC8 30 MAY 2016
International Hydrographic Organization (IHO)
Training, Research and Development Centre BOARD OF DIRECTORS
Report on 9th TRDC-BOD Meeting
IRCC work is guided by the IHO Work Programme 3
EAHC-MSDIWG1 Report Presented by Mr.Jun-Shik Lee IHO MSDIWG10
EAHC-MSDIWG1 Report EAHC SC6 BALI, INDONESIA February 2019
What is Capacity Building?
EAtHC Awareness Seminar
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
Report of the FIG/IHO/ICA IBSC to the IHO IRCC10
10: Capacity Building 10.1 Report in the IHO CBSC Meeting & Actions
Hong Kong SAR Government, China
EAHC Report IRCC C Japan EAHC Chair
NATHALIA MARÍA OTALORA MURILLO
Peter YOU EAHC CB Coordinator
Peter YOU EAHC CB Coordinator
South West Atlantic Hydrographic Commission (SWAtHC) Report
Report of the FIG/IHO/ICA IBSC to the IHO IRCC11
Report and Proposal from IRCC
Aim of presentation CBSC was tasked to propose to the Council via IRCC to provide information on the minimum resources needed to support a sustainable.
Report and Proposal from IRCC
Presentation transcript:

East Asia Hydrographic Commission (EAHC) Three Year Work Plan Jung Hyun Kim Republic of Korea EAHC Capacity Building Coordinator CBSC14 Abu Dhabi, UAE 24-26 May 2016

Table of Contents I II III IV Action Required of CBSC Introduction Five Year CB Work Plan (2014-18) III Three Year CB Work Plan (2018-20) IV Action Required of CBSC

EAHC Steering Committee I . Introduction Tasked the Training, Research and Development Center (TRDC) Board of Directors (BOD) to plan, implement and monitor CB programmes. EAHC EAHC Steering Committee TRDC BOD Charting and Hydrography Committee MSDI WG Secretariat

I . Introduction Approved the five-year Capacity Building Work Plan (shown on the next slide) proposed by the TRDC BOD during the 2nd TRDC BOD meeting in 2014. Due to the limited CB fund, only a small number of programmes were funded by the CBSC/IHO. → A number of the proposed programmes not implemented

II . Five Year CB Work Plan (2014-18) Training 2014 2015 2016 2017 2018 Programme Basic Basic (Carto) (a. Indonesia b. Malaysia c. Singapore d. ROK) - Basic (Carto) (a. Indonesia b. ROK c. Malaysia d. Philippines e. Singapore f. China) - MS & SC4) (Indonesia) - Basic (C & H) - MS & SC Basic (C & H) Intermediate CAT B M2 (Carto) CAT B (Carto) Advanced - MBA1) - TWL2)   - TFT3) Foundation Course - IHO MSI5)  - MSDI  - TFT Basic (H)   - MIO - TWL   - TFT Basic (H)  - SDB6) - MIO7) - TFT Basic (C&H)  - SDB  - MSDI   - TFT Basic (C&H) Special S-100 Seminar - S-100 Seminar  - Hydro. Survey for disaster relief Seminar  - Tsunami Inundation Mapping Workshop   - S-100 Seminar   - Hydro. Survey for disaster relief Seminar  - Cartographic Production Database System Workshop  - Multi-beam Survey and Seabed Classification - Hydrographic Database System Workshop  - Enhanced Delivery Method of Hydrographic Data Seminar S-101 Seminar Staff Exchange Singapore, Hong Kong Technical Visits -Vietnam  - Brunei Darussalam Cambodia Timor Leste MBA1): Technical aspects of maritime boundaries, baselines and extended continental shelf Highlighted: Funded Highlighted: Funded and to be conducted in 2016 TWL2): Tides and water level for hydrographic survey TFT3): Training for Trainers MS & SC4): Multi-beam Survey & Seabed Classification MSI5): Maritime Safety Information MIO6): Marine Information Overlay SDB7): Satellite Derived Bathymetric Charting

EAHC Regional Countries Capacity Phase Stage Country/Territory NHC/NHCC Phase1 Phase2 Phase3 Last TV 1 Brunei Darussalam 2014 2 Cambodia 2016 3 China -1 4 Democratic People’s Rep. of Korea 5 Indonesia 6 Japan 7 Malaysia 8 Philippines 9 Republic of Korea 10 Singapore 11 Thailand 2004 12 Timor-Leste 13 Viet Nam Phase 1 - collection and circulation of nautical information, necessary to maintain existing charts and publications up to date Phase 2 - creation of a surveying capability to conduct coastal and offshore projects Phase 3 - produce paper charts, ENC and publications independently. Key to required training -1 - No information available 0 - The country is unaware of its national obligations / The country established a NHC/NHCC 1 - The country is aware of its national obligations but does not have the means to do it / The country is in the process to establish a NHC/NHCC 2 - The country has the ability to fulfil national obligations / The country is in the process to establish a NHC/NHCC 3 - The country fulfils its national obligations in a sustainable manner 4 - The country fulfils its national obligations through a third party

III . Three Year CB Work Plan (2018-20) Training 2018 2019 2020 Programme Basic Basic (Carto & Hydro) Intermediate Cat B Cartography (Phase 1) (Phase 2) (Phase 3) Advanced - TFT Basic Hydro - MSDI - TFT Basic (Carto & Hydro)   - MIO - TWL - SDB Special - Cartographic Production Database System Workshop - S-101 Seminar - Hydrographic Database System Workshop - Enhanced Delivery Method of Hydrographic Data Seminar

III . Three Year CB Work Plan (2018-20) Training for Trainers (TFT) courses are highly valued since they nurture trainers to train others in their mother tongues. → More effective outcome as most MSs are non-English speaking countries → Higher priority in the EAHC CB Work Plan ▲ MSs conducted basic trainings in their home countries (2014)

III . Three Year CB Work Plan (2018-20) 1st TFT Carto Workshop: Nov. 2013 2nd TFT Carto Workshop: Nov. 2014 both in the ROK The ROK will host the 1st TFT Hydro Basic in Oct. 2016 (Phase 2 in 2017) The EAHC monitors its capacity building activities and sets up plans at TRDC BOD meetings every year. ▲ 1st TFT Carto Workshop Busan, ROK, November 2013 ▲ 2nd TFT Carto Workshop Busan, ROK, November 2014

IV . Action Required of CBSC The CBSC is invited to take note of this report.

Thank you