Dependable Database for Integrated Water Resources Management in INDIA

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Andhra Pradesh Gujarat Karnataka Kerala Maharashtra Orissa Tamil Nadu HYDROLOGY PROJECT INCLUDES HYDROLOGY PROJECT INCLUDES Madhya Pradesh Chhattisgarh.
DHV-Delft Consultants, provide technical consultancy for implementing the HYDROLOGY PROJECT The Consultancy team is composed of 30 specialists on long.
Global Terrestrial Networks : The Hydrological Network.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Measuring the effectiveness of government IT systems Current ANAO initiatives to enhance IT Audit integration and support in delivering Audit outcomes.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
GROUNDWATER MONITORING REQUIREMENTS. Comment on the differences between monitoring for surface and groundwater.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Towards participatory approaches to a Multiscale European Soil Information System Nicola Filippi, Panagos Panos, Borut Vrscaj EUROPEAN COMMISSION JOINT.
By Phoebe Oduor.  Countries are required to report on their GHG emissions to UNFCCC every four years (mandatory) and every two years (intermediary) 
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
TEMPUS in Syria The national priorities for Tempus IV third call Dr Rami Ayoubi Coordinator National Tempus Office-Syria 10/8/2015National.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
Census Mapping A Case of Zambia UN Workshop on Census Cartography and Management, Lusaka, 8-12 th October 2007.
U.S. Department of the Interior U.S. Geological Survey Dr. Robert M. Hirsch Associate Director for Water April 16, 2007 USGS: Water Resources Program.
National Hydrology Project Central Ground Water Board WB Mission: 1-15 September
NATIONAL INSTITUTE OF HYDROLOGY ROORKEE Sept. 14, 2015 NEW DELHI.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
UNEP GEMS Programme for Freshwater Quality Monitoring and Assessment THE GEMS/Water PROGRAMME National Water Research Institute (NWRI) at the Canada Centre.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
National and regional activities for environment observations Natalya Shulgina Uzhydromet World Environmental Day Round Table GEO CBC7 Meeting 5 June,
Central Water and Power Research Station Pune
Monitoring water resources, water use, water pollution and compliance IWRM for River Basin Organisations.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 United Nations Economic Commission for Europe 1 ENPI/SEIS Consultation Meeting European Commission, Brussels, 11 November 2010 Current Situation and.
Cooperation with the European Environmental Agency - the Way Forward Svetlana Gjorgjeva, Macedonian NFP/EEA Lisbon, November 2009.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
We know HIS solutions work HIS success can be your success.
DEVELOPMENT OF DISASTER MANAGEMENT INFORMATION SYSTEM (DMIS) FOR VIETNAM Le Minh Ba Information Technology officer Nature Disaster Mitigation Partnership.
PARTNERSHIP OPPORTUNITIES IN THE DEVELOPMENT OF E-SYSTEMS OF LAND GOVERNANCE IN KENYA 1 A Paper Presented at the Land Governance and Poverty Conference.
Theme : Information, monitoring & research NWRS Workshops October - December
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
EM-DAT TAG Meeting New York, October 26, 27 and Dang Quang Minh
National Hydrology Project
8 - 9 MAY, 2014, PRETORIA, SOUTH AFRICA
Objectives and Plan of Action
Wellhead Protection on Tribal Lands
DPM Programme Office Databases to Support Information Sharing, Coordination, Crosscutting Project Development and Progress Monitoring James Douris DPM.
Ministry of Water Resources, River Development and Ganga Rejuvenation
National Hydrology Project
GROUNDWATER DEPARTMENT - KERALA
1st World Bank Mission under the National Hydrology Project
Climate Change Adaptation and Mitigation (CCAM) Program
The National Land Records Modernization Programme (NLRMP)
Introduction to the EEA and the EIONET
“CareerGuide for Schools”
EMIS. EDUCATION MANAGEMENT INFORMATION SYSTEM (EMIS)
West Africa Regional Work Plan Example
CREWS West Africa Regional Work Plan
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
e -Surface Water Information System Data Entry System
Egypt’s Population, Housing & Establishments e-Census, 2017
Assessment Training Session 9: Assessment Analysis
Institutional Framework, Resources and Management
Integrated River Basin Management Tools and methods for IRBM Monitoring, Acquisition and processing of Water Resource Data.
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
ETC/WTR under contract to the EEA Status of Groundwater in Europe
Fabio Crescenzi Territorial Databases and Gis
Status and Plan of Regional WIGOS Center (West Asia) in
International Groundwater Resources Assessment Centre (IGRAC)
Mark Adamson Office of Public Works 27th February, 2019
Gabriel Mannah Kpaka Deputy Director General/Head of Operations
Global Platform for Sustainable Cities - Resource Team (RT) -
Presentation transcript:

Dependable Database for Integrated Water Resources Management in INDIA Building A Dependable Database for Integrated Water Resources Management in INDIA HIS

Consultancy Set-up DHV-Delft Consultants, provide technical consultancy for implementing the HYDROLOGY PROJECT The Consultancy team is composed of 30 specialists on long term basis and numerous short term specialists drawn from: Hydrology Geo-hydrology Meteorology Water Quality Institutional Development Equipment Specialist Management Specialist Data processing expert Communications Software Design & Development H R D & Training M I S

Overview of the presentation Introduction to Hydrology Project-HP Need for HIS What is HIS Objectives of HIS Participating agencies in the programme Implementation methodology New technology introduced Benefits from HIS Scope for replication in other geographical areas Presentation Team J.G. Grijsen-Team Leader K.A.S.Mani-Hydrogeologist

Hydrology Project-India Hydrology Project (HP) is a World Bank funded project with technical assistance from the Government of The Netherlands Implementation cost: US $122 million Technical Consultancy: US $15 million HP aims at the establishment of a Hydrological Information System (HIS) spread over nine states covering 1.7 m sq. kms.

Need for HIS Efficient water resources management calls for hydrological data which is: reliable authentic validated easily accessible regularly updated

What is HIS HIS includes the different activities related to data collection processing storage dissemination of meteorological, hydrological & geo-hydrological components of the hydrologic cycle

HIS - What does it do HIS enables regular update of the different components of the hydrologic cycle at the national, state and regional level Makes available the organised data as information to the Hydrological Data User Group (HDUG) which includes policy formulators, planners, developers and the user community. HIS provides critical input for major policy formulation, enhancing development options, improving technical solutions and sustainability of water resources.

Objectives of HIS Collect reliable and spatially intensive data on SW/GW quantity and quality Standardise procedures for various activities across all SW/GW agencies Establish dedicated hydrological data processing software Organise data in well-defined databases Provide analytical and GIS tools for detailed interpretation Transform data as useful information for user friendly internet based dissemination Sustain the HIS through institutional strengthening & human resources development

HIS - Developmental process Emerging technologies in the field of software development, data base management, internet , communications, GIS & GPS are being used in the development of HIS At the heart of HIS is its monitoring network Monitoring networks have been integrated between the agencies Contamination and pollution of groundwater prioritised for systematic monitoring, analysis and interpretation Human Resource Development and Institutional Development essential for sustaining the system

HP- Infrastructure profile 25 Participating Agencies Initiated in Sept 1995 and to be completed by March 2003 Significant numbers 7900 dedicated piezometers 7000 digital water level recorders 920 river gauging stations 1800 rainfall stations 150 full climatic stations 80 water quality laboratories 1500 computer systems with dedicated software 1600 offices and site buildings 580 vehicles 31 data storage centres 390 data entry and processing centres 9000 staff trained in different subjects

Overall structure of HIS USERS CWC IMD STATE CGWB DATA STORAGE/ NDSC/ NDSC/ NDSC SDSC DISSEMINATION RDSC RDSC HYDROLOGICAL RDPC SDPC SWDPC SGWDPC RDPC VALIDATION SECONDARY DDPC DDPC rDPC DDPC VALIDATION DATA ENTRY/ PRIMARY VALIDATION SDDPC SDDPC dDPC UDPC FIELD FIELD FIELD FIELD FIELD OBSERVATIONS DATA FLOW INTER-AGENCY DATA VALIDATION DATA EXCHANGE

Meteorological network 1800 rainfall stations 150 full climatic stations

River gauging stations 265 new stations 650 stations upgraded Current meters for velocity measurement Digital Water Level Recorders for water level measurement ADCPs for select gauging sites

Groundwater network Integrated network made up of 7500 piezometers over 20,000 open wells 7000 DWLR’s Network of different agencies integrated Network optimised for better spatial & vertical coverage

Groundwater Level monitoring Authentic ground water level collection using dedicated Piezometers Piezometers tap a single selected aquifer Piezometer facilitates collection of uncontaminated water samples Digital Water Level Recorders for continuous monitoring at specified frequencies

Piezometer nests Water level and water quality in multiaquifer system monitored through piezometer nests Piezometers constructed to varying depths tapping different aquifers Individual aquifers isolated through proper sealing Water level monitoring of different zones for understanding the regional aquifer system Water quality sampling of different aquifers for identifying the source of contaminants

High frequency water level monitoring

Dedicated water quality network Monitoring network: - baseline - trend - surveillance Use of high precision equipments & portable field kits for analysis Groundwater sampling using dedicated sampling pumps Analysis for chemical, bacteriological, trace elements, heavy metals, pesticides Water quality data interpreted using analytical software, GIS tools

Hydro-geochemical characterisation

GIS data-sets created under Hydrology Project Administrative boundary Drainage boundary Settlements & Communications Contours and spot heights Geology Geomorphology Land use/cover

Data Processing Centres 390 Data Processing Centres (DPC) Development of user friendly data entry softwares- SWDES/GWDES data entry validation, basic analysis reporting

GW-Data Processing and Analysis

DATA VALIDATION

DATA TRANSPORT FROM DISTRICT TO STATE DATA STORAGE CENTER

WATER QUALITY SAMPLE COLLECTION,ANALYSIS AND APSGWD District Manager 1 week Data entered in GWDES validated Quality data transfer to RDPC Lab Manager Send data to District office Analytical quality data from lab District officer 2 days For general parameters Submission of samples to the Laboratory Field officer In-situ Simultaneously during monitoring WQ sampling from OB wells Component Task Time Responsibility WATER QUALITY SAMPLE COLLECTION,ANALYSIS AND TRANSPORT

Data Transport from Field station to District Headquarter Distance: No.of Stations: Route-1…………200km OB wells ……63 Route-2…………254km Piezometers…48 Route-3…………270km AWLRs……..42

FLOW CHART OF DATA TYPES APSGWD FLOW CHART OF DATA TYPES Data in Gbytes State Data Processing Report generation Center Text, mdb , mdd ,excel & map object files Regional Data +1 week Processing Center Processing, validating & report generation Text, mdb , mdd ,excel & map object files +1 week Data in Mbytes District Data Preliminary validation, data entry Center Binary Files,Text files, manual records 1 week Field Observation Record measurements - location, time series Station Data in Kbytes

HIS - Inter Agency Data Exchange Regular exchange of data between the different agencies for validations Generic data exchange standards for data mobility

Data Storage Centre 31 Data Storage Centres (DSC) One stop shop for data dissemination Meta Data Catalogue on the web site and CD Data on SW/GW (quantity and quality) Current and historical, raw & interpreted

HIS- Deliverables Processed Data Maps Year Books Event reports Customised reports

HIS Sustainability Extensive training programme Network design Observation procedures Data entry & processing GIS and database management systems WQ sampling and analysis Procurement / installation / testing of equipments Training and communication skills Standardised training modules Concept of ToTs (Training of Trainers) Deployment of dedicated staff Provision of fund for annual O & M Updation of technology

Gains from HIS Integrated Monitoring network Dedicated software Data centres and inter-agency data exchange Standard procedures for data collection, analysis and storage Trained staff, training modules Reference manuals for HIS operation Computerised historical data Transition from “technology shy” to “technology friendly” environment Improved data dissemination Other institutional gains Water Quality Assessment Authority (WQAA) Introduce concept of IWRM

Replicability of HIS HIS as an integrated process for managing the water resources system is relevant to countries facing floods, droughts and water quality issues HIS as implemented in India can be replicated elsewhere with local customisation Experiences gained in India would help in avoiding the teething troubles and reduce the implementation time

THANK YOU

E-Mail : hydrologyproject@vsnl.com Website: www.hydrologyproject.com Contact Address You can send mail for any additional information to HYDROLOGY PROJECT DHV Consultants CSMRS Building, 4th Floor Olof Palme Marg, Hauz Khas New Delhi - 110016 Phone No. +90-11- 6861681-84 Fax No. +90-11-6861685 E-Mail : hydrologyproject@vsnl.com Website: www.hydrologyproject.com