Post-earthquake Building Usability Assessment:

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
Barhale Procedure for Site Establishment
Actions and Retrofit of Post Earthquake-Damaged Bridges
Performance of buildings in the February 2011 Christchurch Earthquake Associate Prof Rajesh Dhakal University of Canterbury Christchurch, NZ Sixth International.
“Fires in improperly secured vacant or abandoned buildings are a constant threat to firefighters, citizens and private property alike. We believe that.
Earthquake Mitigation I: Techniques for Reducing Earthquake Hazard “Earthquake Hazards and Risk Mitigation in Western Washington and Oregon” Keoni Wong,
1. 2 World seismic activity British Geological Survey 2.
Light Search & Rescue Operations. Cell Phones, Pagers, etc. Please turn to OFF, VIBRATE, or SILENT.
1 The purpose is to prevent falls and reduce the consequences if a fall occurs when Working At Height. Use fall protection equipment when working outside.
Unit 5: Light Search and Rescue Operations
ATC-20 (CONDENSED)  Post Earthquake Safety Evaluation of Buildings  Condensed Guide for Emergency Service Workers (LAUSD Employees)  Aid for evaluations.
Slovenian National Building and Civil Engineering Institute
During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
Design of Buildings in Coastal Regions Post Storm Safety Evaluation Post Storm Safety Evaluation ATC-45 Based Assessments ATC-45 Based Assessments William.
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Rapid Response Network External Agencies Workshop 26 th January 2011 Middleton Railway Paul Armitage Tony Firth.
WELLINGTON COUNTY CONFINED SPACE. Learning Outcomes The participant will:  Assess hazards associated with Confined Space Entry  Identify a Confined.
Service Delivery 2 Collapsed Structures. Aim To provide information that will assist students to deal with incidents involving collapsed structures safely.
13 Search and Rescue. 2 Objectives (1 of 2) Define search and rescue. Describe the importance of scene size- up in search and rescue. Describe search.
Structural Damage Categories ► LIGHT  Safe to enter and remain ► MODERATE  Hazardous to enter  Enter only to save lives ► HEAVY  Unsafe for CERT trained.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Leaders Meeting Monday 8 th May Contents AimsVideo Duty of Care Leader Responsibilities –Risk Assessment –Environmental Issues and Equipment –Emergency.
Security Policies and Procedures. cs490ns-cotter2 Objectives Define the security policy cycle Explain risk identification Design a security policy –Define.
Chapter 20 A Safe and Healthy Environment. Lecture Overview Employee Safety Principles of Safety Program Implementation of Safety Program Health Work.
Light Search and Rescue Operations CERT Basic Training Unit 5.
Search and Rescue.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
Search and Rescue Operations USC C ERT. Search and Rescue  In a disaster, CERT teams assist with light search & rescue  A team may be assigned to search.
OHSAS Occupational health and safety management system.
13 Search and Rescue.
Size-up and Damage Assessment Key Points in the morning session: ◘Use Size-up and Damage Assessment for CORE Team safety ◘Seven steps of Size-up ◘How to.
Global Marketing © Chevron 2009 Rev. 1 Electrical Safety Awareness Plus.
Özgür BOZDAĞ Mutlu SEÇER Dokuz Eylül University Katip Çelebi University Izmir, Turkey SEISMIC RETROFITTING OF AN EXISTING INDUSTRIAL STRUCTURE FOR CONVERTING.

Review of Indian Seismic Codes
Incident Reporting And Investigation Program
People and Culture Office Safety, Health and Wellbeing
SAFETY OF ELEVATORS AND ESCALATORS IN BUILDINGS
Light Search and Rescue Operations
Maintaining Safety Standards
Seismic Waves Large strain energy released during an earthquake
Earthquake Preparedness
Maintaining Safety Standards
by Dr. Syed Mohamed Ibrahim M.Tech., Ph.D.,
BRIDGES MOST IMPORTANT GEOTECHNICAL EFFECT- LIQUEFACTION
“Prepare, Prevent, Respond”
OH&S Management System
Risk management - HIRAC awareness presentation
Radio Equipment Chapter 4 RADIO EQUIPMENT
Emergency Evacuations: Multi-Level Apartments
SAFE WORK INSTRUCTIONS
Post-earthquake Building Usability Assessment
Introduction In the first lesson we demonstrated the following:-
MPO School Transportation Working Group
Click anywhere to get started…
Incident Reporting And Investigation Program
Earthquake resistant buildings
People and Culture Office Safety, Health and Wellbeing
Injury and Illness Prevention Program (IIPP)
Crisis Planning & Strategy: Using Earthquakes as a Case Study
Disaster Preparedness
INDIVIDUAL AND COLLECTIVE RESPONSES TO VOLCANIC AND EARHQUAKE HAZARDS
Masonry Bearing Walls.
Non-Structural Safety
Light Search and Rescue Operations
Post Seismic Bridge Inspection
Presentation transcript:

Post-earthquake Building Usability Assessment: Level 1: Rapid Evaluation Jitendra Bothara

Levels of Evaluation Rapid Evaluation Level 1: Rapid Evaluation Content Levels of Evaluation Level 1: Rapid Evaluation Level 2: Detailed evaluation Level 3: Detailed Engineering Rapid Evaluation Objective of Evaluation Goals Building categorisation Steps

Triaging of buildings – identify which buildings are usable, Level 1: Rapid Evaluation Triaging of buildings – identify which buildings are usable, A safety evaluation of current state of buildings with anticipation of aftershocks sequence, to identify whether the building is safe for entry or occupancy. It is not future proofing of buildings. It should not consider issues of code compliance.

completed immediately after an earthquake Level 1: Rapid Evaluation Qualitative completed immediately after an earthquake establishing quantum of damage external only less than 10-20 minutes categorising buildings into Inspected/ Limited Entry/ Unsafe, recommending barriers and/or no-go zones. 

Identify which buildings are usable. Objective Identify which buildings are usable. minimising displacement of people. Send people back to their home, if that is safe to do – normalcy in life assessing the need for temporary works such as shoring, temporary securing/ removal of unstable elements and making safe saving property from unnecessary demolition conserving heritage fabric

Safe use of streets adjacent to damaged buildings Objective……… Safe use of streets adjacent to damaged buildings safe occupation of buildings for: continued use, especially emergency facilities minimising economic impact for the owners and community minimising impact on commercial activities The goal is to minimise risk, but not to imposing unwarranted hardship on owners and occupants of damaged buildings

RED: Does not mean the building has to be demolished Interpretation GREEN – Does not mean safe, it only means the building is occupiable in given condition, YELLOW: RED: Does not mean the building has to be demolished The goal is to understanding the implications of the damages

Damage Categorisation Damage Intensity Risk Profile Posting Usability Category Details Light Low Inspected (Green) Occupiable Moderate Restricted, Limited entry at owner’s risk (Yellow) Use restricted to parts of building only Prohibit entry into certain rooms/ areas or whole building because of falling hazards that do not threaten the rest of the building, No public entry except on short term essential business to parts or all of the building for emergency purpose Removal of essential business or legal records, removal of valuables only, removal of property Heavy High Unsafe, entry prohibited, (Red) Entry prohibited: Damage to external factors pose a significant hazard Geotechnical, adjoining buildings, gas/ electricity, Entry prohibited: Structural factors Leaning, total/ partial collapse of walls, severe damage to structural columns, load paths lost, capacities severely compromised

Rapid Assessment Process Building identified for assessment Assessment by visual examination of the exterior and interior Confirm and record the identity of the building Assess/ Record/ Decide Occupiable Restricted access Entry Prohibited

Building or storey leaning What we are looking for? Life-safety threat Threat of overall or partial collapse due to loss of strength, stability, or stiffness of the structural system Building or storey leaning Collapse, partial collapse or off foundation Structural damage to vertical load system Out-of-plumb walls/ columns, beam-column Structural damage to lateral load system Hinging of columns/ beams,

Falling hazards – parapets, canopies, gable walls, broken windows What we are looking for? Falling hazards – parapets, canopies, gable walls, broken windows Threat posed by damage to adjacent structures or land Ground slope movement Look for ground displacement Foundation damage Other hazards such as gas, power cables, other hazardous materials

Inspect the entire building from outside, Inspection Procedure Inspect the entire building from outside, Examine the ground in the general area of the building for fissures, land or rock slide, slope movement, Complete the Rapid Evaluation Form/ App Provide brief notes to the house owners, if that helps to reduce risk – talk to them Please be aware: You are the most knowledge person for the house owner so provide him accurate information only.

Damage Categorisation Damage Intensity Risk Profile Posting Usability Category Details Light Low Inspected (Green) Occupiable (no immediate further work required) No apparent hazard observed, although repairs may be required, original vertical/ lateral load capacity has not significantly reduced, minor non-structural damage, Moderate Restricted, Limited entry at owner’s risk (Yellow) Use restricted to parts of building only Local damages, falling hazard, structure intact and its capacity not compromised No public entry except on short term essential business to parts or al of the building for emergency purpose Vertical load carrying capacity significantly not compromised , lateral load capacity significantly reduced, high risk from aftershocks, emergency support may be required, no entry to public Heavy High Unsafe, entry prohibited, (Red) R1. Significant damage: repairs, strengthening possible Extreme hazard, may collapse from an aftershock. Significant loss of vertical load capacity, severe loss of lateral load capacity, partial failure could have occurred, however load paths still available, building surrounding may need cordoning, R2. Severe damage: demolition likely Load paths lost, capacities severely compromised

Damage Categorisation Posting Usability Category Details Inspected (Green) Occupiable Restricted, Limited entry at owner’s risk (Yellow) Use restricted to parts of building only Prohibit entry into certain rooms/ areas because of falling hazards that do not threaten the rest of the building, No public entry except on short term essential business to parts or all of the building for emergency purpose Removal of essential business or legal records, removal of valuables only, removal of property Unsafe, entry prohibited, (Red) Entry prohibited: Damage to external factors pose a significant hazard Neighbouring building or its components in danger of collapse, risk of land slide/ rock fall, significant crack(s) in the ground to or under building Entry prohibited: Structural factors Leaning, total/ partial collapse of walls, severe damage to structural columns and beams/ walls, load paths lost, capacities severely compromised

Post-earthquake Usability Evaluation of a building should be based on overall safety performance of the building rather than performance of a single or a few components.

Our Role Advisory Counselling

Team must have at least two members Why Team Building Team must have at least two members Why Safety Discussion/ Peer review

Official identification/authorisation to enter properties Essential Items PPE Official identification/authorisation to enter properties Street maps, aerial photographs and building specific information etc., Assessment forms/ App,

Briefing Sheets: Office supplies Carry bag, Camera outline procedures, Essential Items…… Briefing Sheets: outline procedures, reporting requirement, contact points (etc.), Office supplies Clip boards, Pens and pencils, Spare batteries including means of re-charging electronic equipment, Carry bag, Camera

ANY QUESTION?