Options for Procurement of Gas Meter Temperature Lab Tests

Slides:



Advertisements
Similar presentations
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Advertisements

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Single National Provider for the Detection & Investigation of the Illegal Use of Gas UNC Review Proposal October 2009 Anne Jackson, Scottish.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Gas Performance Assurance Framework 11 th January 2013.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Functional Change through RGMA Review Ph2
UNCC AUGS Process Update 17 April 2014
Performance Indicators
UIG Task Force Progress Report
Action 0002: Meter Error Notifications
Amendment Invoice Task Force Progress Report
DSC Change Committee Summary – 12th December
UIG Task Force Progress Report
DSC Change Committee Summary – 13th June
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
XRN 4695 Supporting Document High Level Plan
CSS Update for CoMC 19th September 2018
DSC ChMC CSS update 6th July 2018
DSC Change Committee Summary – 11th July
Project Nexus Workgroup
Consideration of issues raised by UNC Modification Proposal 0244
Background MDD is currently managed within SPAA
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
UIG Task Force Progress Report
UIG Task Force Progress Report
DSC Change Committee Summary – 9th January ‘19
UIG Task Force Progress Report
DSC Change Committee Summary – 13th March ‘19
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
DSC Change Committee Summary – 13th February ‘19
Amendment Invoice Task Force Progress Report
UIG Task Force Progress Report
REC Enquiry Services Schedule
Consideration of issues raised by UNC Modification Proposal 0244
Options for the Development of a Demand Side Response Mechanism
UIG Task Force Progress Report
Proposer: Debbie Brace Panel Date: 20th March 2014
UNC Modification Proposal 0229
UIG Task Force Progress Report
How should Disclosure Reports work in the future?
UIG Task Force Progress Report
UIG Task Force Progress Report
How should Disclosure Reports work in the future?
UIG Task Force Progress Report
Customer Issue Management CoMC Update
UIG Task Force Progress Report
Proposal to issue first report in December 2018
Retail Energy Code - Data Access Schedule
UIG Task Force Progress Report
MDD Market Participant Identity Committee - Terms of Reference
UIG Task Force Progress Report
UIG Task Force Progress Report
Xoserve Draft UIG Incentives Modifications 20 May 2019
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
KPI and KVI Review Approach & Plan
Customer Issue Management Dashboard CoMC
UIG Task Force Progress Report
Presentation transcript:

Options for Procurement of Gas Meter Temperature Lab Tests Contract Management Committee on 1st May 2019

Background  Standard volume-to-energy conversion factor (CF) is set out in Gas Thermal Energy Regulations The impact of use of a standard CF is under investigation by the Unidentified Gas (UIG) Task Force and the AUGE (Allocation of Unidentified Gas Expert) Could increase UIG in winter, decrease UIG in summer AUGE has highlighted a lack of viable data on temperatures at GB meters At the UNC AUG Sub-Committee in March the AUGE proposed lab tests on the impact of surrounding temperatures on the actual metered gas temperatures

AUGE’s Suggested Approach Extract from AUGE’s presentation (Slide 19) https://gasgov-mst-files.s3.eu-west-1.amazonaws.com/s3fs-public/ggf/2019-03/2.0%20%20Modified%20AUGS%20Presentation%2015%20Mar%202019%20Final.pdf

Procurement Approach AUGE has already discussed this with a potential third party service provider Note: any indicative costs quoted by the AUGE only referred to the third party service, not to any DNV GL work, e.g. supplier management Discussion at AUG Sub-Committee recommended that DSC Contract Manager Sub-Committee was appropriate forum to agree an approach to procurement of a service Due to timing of meetings agenda item could not be added to March meeting

Contracting Options for an Independent Study (1 of 2) AUGE procures a sub-contractor for the service allows for a speedy appointment would increase AUGE’s contract costs may not be consistent with planned re-procurement of an AUGE service - study duration might run past the end of next AUGE service year Xoserve appoint AUGE’s recommended supplier no dependency on the current AUGE costs incurred by Xoserve costs not benchmarked against market

Contracting Options for an Independent Study (2 of 2) Xoserve competitive procurement process costs are market tested, incurred by Xoserve no dependency on the current AUGE longer time to procure likely, but full OJEU process not required

Xoserve Recommendation Pursue Option 3, i.e. Xoserve competitive selection Change Proposal would be required to initiate the work Requirements for the study could be developed with AUGE and UNC AUG Sub-Committee Could help inform a new UNC Review Group on Standard Conversion Factor – proposal presented at April UIG Workgroup, Review Request to be raised by Scottish Power

Next Steps Does CoMC support Xoserve’s recommended approach to procuring this investigation work?