What are the priorities?

Slides:



Advertisements
Similar presentations
C Introduction to the Geostat project Session on User needs (Geostat workshop in Bled 1-3 october 2008) Lars H. Backer
Advertisements

02-Oct-2008 European Forum for GeoStatistics 2008 in Bled Concept for an Integrated Web Solution / an Infrastructure for Geostatistics (Subproject 3)
1 The ESSnet project GEOSTAT Vilni Verner Holst Bloch Coordinator of ESSnet project GEOSTAT 1A Statistics Norway Representing Census data in a European.
Conclusions & Thoughts on The Future of Geo-Statistics Lars H. Backer.
The EFGS 2009 Meeting in Den Haag 5-7 October /05/2015Lars H. Backer1.
1 The GEOSTAT project Vilni Verner Holst Bloch MSc. landscape ecology and natural resources Statistics Norway Otervegen 23 N Kongsvinger Tel : ++47.
1 Guidelines for production and steps towards harmonisation Marja Tammilehto-Luode Population Statistics Statistics Finland FI Statistics Finland.
1 The ESSnet project GEOSTAT 1A/B Vilni Verner Holst Bloch Coordinator of ESSnet project GEOSTAT 1A Statistics Norway Representing Census data in a European.
Geostatistics and maps A tentative plan for a project European Forum for Geostatistics, October 2008.
The Geostat Hypotheses; In search of a high resolution foundation for Geostatistics, an interactive response to operational user needs in a time of transition.
EFGS 2015 European Forum for Geography and Statistics 2015 Conference
Implementing the GEOSTAT Vision – a 10 points program towards a European statistical- spatial framework – in memoriam Lars H. Backer Ekkehard Petri Eurostat.
EFGS in Den Haag1 ESSnet project GEOSTAT Work Package 1 Collection of User Needs.
An ESS strategy towards better integration of statistics and geography
EFGS 2014 Krakow General assembly The EFGS Executive Team The European Forum for (the Integration of ) Geography and Statistics (EFGS) October The.
Market watch/Business report – Grid statistics Mr. Erik Sommer, EFGS Expert Group for Business Models, Denmark. European Forum for Geostatistics.
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
Generalisation for statistical thematic maps
GIS in Central Statistical Office
Eurostat D2 – Regional Indicators and Geographical Information
The past and present of the EFGS project
The Geostat Project; How to solve the “Problem with Statistics”
Implementing the ESS Vision 2020
Proximity to airports via the road network
GISCO Working Group March
European Commission EUROSTAT E4
Dissemination of results from 2010/2011 censuses
European Forum for Geostatistics
Geographical Information Systems for Statistics Luxembourg March 2008
Amendment to the NUTS Regulation Oliver Heiden Eurostat.E4
Achievements and plans in GISCO
Marie Haldorson, Statistics Sweden
Closing session - Evaluation of the course
European Forum for GeoStatistics
Summing up - Tour de Table
Working Party on Regional Statistics 1-2 October 2012
The Tandem Consortium, M T-L
Ola Nordbeck Statistics Norway
European Forum for Geostatistics
Work Package 2 - Geostatistics Marja Tammilehto-Luode
What are the priorities?
WORKING GROUP "Land Cover/Use Statistics" June 7-8th 2010,Luxembourg,
New mandate for the Working Group
5.2 draft European Statistical Work Programme 2013
Survey among NSIs on participation in the GEOSTAT project
Progress report on geospatial information management within the ESS
Draft Methodology for impact analysis of ESS.VIP Projects
Case study Using proper technique for representing statistics on maps
Cordination of Geographic Information in the Commission and the ESS
GEOSTAT 1B – presentation of the call for proposals
Discussion Case study - mapping techniques
ESS.VIPs and IT related aspects
Census Hub: current plans and timetable
Local Administrative Units
Collection and dissemination of data geo-referenced to a 1km² grid Item 3.2 of the draft agenda DSS Meeting 1 and 2 March 2018.
Metadata for the European Statistical System
The GEOSTAT project Work Package 2 Geostatistics Working Party/Meeting
Ola Erik Nordbeck Coordinator of ESSnet project GEOSTAT 1B
Legislative strategy for cross-cutting ESS legislation
Transformation of the National Statistical System: Experience
ESSnet project GEOSTAT 1B
Nordic Forum for Geo-Statistics 2007 meeting
Workpackage Infrastructure
GISCO working group meeting 2015
The GISCO Progress Report Nov – Feb By Albrecht Wirthmann
Item 9.6 Mainstreaming geo-statistics
Item 2. Latest developments as regards the population and housing census round 2021 in the ESS  Luis del Barrio Enlargement, neighbourhood.
Geo-enabling the SDG indicators – experiences from the UN Global Geospatial Management and the GEOSTAT 3 project Agenda item 12 Ekkehard PETRI – Eurostat,
How to GEOSTAT census data?
Merging statistics and geospatial information Grants 2012
Presentation transcript:

What are the priorities? The GEOSTAT project The Geostat IB project What are the priorities? EuroStat Working Party on GIS for Statistics Luxembourg 8th – 9th of March 2010 The Geostat project Lars Henrik Backer Executive Director European Forum for Geostatistics Valhallavägen 145 11531 Stockholm Sweden Tel : ++46 /6645215 Mobile : ++46 / (0)707543111 E-mail : lars.backer@mdmapping.se

Project: Geostat IA Geostat I A (2010-2011): Focus on Visions, Precisions WP1:Vision Vision for User needs from a data users and a data producers perspective. WP2: Data Establish foundation for Iterative evolution of the Essnet dataset WP3: Infrastructure Visions for infrastructures WP4: Distribution, dissemination exploitation Establish channels for direct communication between users and producers WP5: Examples None proposed for this stage of the project

Aim Plot the results of the EU 2010-11 population census to km grids. EFGS shall, as a formal association of NSI’s, in close cooperation with EUROSTAT (as a compliment to aggregations to administrative areas) in a form and structure that responds to real user needs; over the internet, through publications and direct communication, present an overview of the EU 2010-11 census on km grids along with maps, diagrams, tables, narratives and practical illustrations of its benefits and practical use.

An Iterative Method Preparation phase: Geostat initiatives Base all work on the results from the Geostat initiative concluded by (Feb. 2010) Iteration 1: Geostat Essnet I A&B Most if not all components in a tentative embryonic form in place by the end of Year 2 (Feb. 2012). Iteration 2: Geostat Essnet II A&B Mature the infrastructure, improve the datasets, illustrations, dissemination technology by the end of Year 4(Feb. 2014)

Obstacles A new disaggregation strategy That the potential use of the corine landcover combined with NUTS statistics for disaggregation is exhausted. A distributed webb portal for WSS That we need a dedicated portal for geostatistics for dissemination and experiments towards a true WSS (Webb Statistical Services). A set of good illustrations For the efficient DDE of Geostatistics, good examples (best practices) to illustrate the power of the grids for spatial analysis are needed. A formal organisation of NSI’s We need a formal organisation for the EFGS

New Disaggregation strategy Concerns WP2 and WP4 Tasks: A dedicated task to support a post- Corine pan European initiative Efforts to substitute crude Corine data with a better dataset (GMES, Harmonised European map dataset (ca. 1:25000 ?) A dedicated Task to support National Grid initiatives. Projects to support the development of km grid datasets based on the each countrys special conditions A methodological Project to handle ”mixed mode” harmonisation challenges

2. A Distributed webb Portal Concerns WP3 and WP4: We are producing visions for Portal, Metadata, WSS and and a business model. We need to establish the embryo for an Portal with ESS om the EFGS website (www.efgs.org). Use of Open source solutions for: WMS to show large grid datasets (difficult) Maps, diagrams, tables as well as narratives with references Meatadata for statistics in general and spacifically for geostatistics Dedicate schema for statistics, INSPIRE schema for maps (?) Illustrations , Case studies(demonstrations)

3. A Set of good Illustrations Concerns WP4 (DDE) A set of good illustrations Presented as a set of unified Posters, a set of slides and a webb presentation Examples Manmade: Urban studies (Inner differentiations, outer delineations) Day vs. Nighttime populations, travel to work patterns, commuter regions etc. Natural: Coastal areas (Interaction between Sea and land) Access to waterfronts, Pollution of rivers, lakes and waterfronts, eutrophication etc. Sociocultural: Quality of life studies Economic: Business and industrial clusters.

4. A formal organisation for EFGS Concerns the whole project Formalized link between NSI’s and Eurostat To serve as a professional reference group in all issues related to geo.statistics Contents. Mandate from NSI’s Statistical offices and public institutions as primary fee paying members Individuals and businesses secondary members An EFGS office and a dedicated Webbsite Portal for access to datasets, Project reporting, Discussion goups, Links etc. Organised Expert groups Channel to publish articles, reports and presentation of Geostatistics

Conclusions Priorities: The new approach to disaggregation To have the essential components for a whole solution in place for the first iteration by February 2011 The new approach to disaggregation Tasks and deliverables for WP2 and WP4 Concrete solutions for WSS on the EFGS portal Tasks and deliverables for WP3 and WP4 A set of good examples for DDE A new WP5 Formalisation of the EFGS The whole project

Lars H. Backer lars.backer@mdmapping.se