Friday 8/10/10 - Morning Planned to keep fill until the afternoon

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Friday 15th June 01:11 Injection.
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Summary week 31 Week 31 G. Arduini & O. Brüning
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Saturday 1.3 e32 Overnight Morning
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Sunday morning Recovering from 400 kV disturbance.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Yesterday’s morning’s controls issues
Not the most productive 24 hours on record
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 03/11 – The Plan Finish electron-cloud program:
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
07/08/2010 Fill #1264 dump at 02:14:38.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Wednesday 26 October 2011.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Monday 152 bunch operation summary
Presentation transcript:

Friday 8/10/10 - Morning Planned to keep fill until the afternoon 9:15 Beams dumped due to SIS orbit interlock at Totem interlocking around TOTEM (+- 0.8 mm) was a bit harsh on data dropout; corrected and deployed 6.5 hours of physics with 2 x 248 bunches 09/10/2010

Vacuum over the last two weeks 3.5·10-7 mbar 3.e13 p+ Fri AM Bad at first fill of record beam intensity ! After that very rapid conditioning 09/10/2010 LHC 8:30 meeting

Vacuum Friday morning fill 1:30 – Ramp 2:00 – Squeeze 2:30 - Collide 09/10/2010 LHC 8:30 meeting

Access and problems Access for QPS in pt 2, as announced Followed by a series of problems: RF LL major trip, not understood by the piquet; RB in 78 has one switch which is open since about two weeks. The experts decided not to intervene in the end, they'll wait until the next long access - but it took one extra precycle anyway; DC-BCT quick calibration returns error - will be fixed when expert back from holidays; used some time to set up new patterns in BQMSPS, pattern verification is ok now; additional delays from PSB ring 4, SPS TDV01 and SPS mains. 09/10/2010 LHC 8:30 meeting

Waiting and access again 13:30 LHC ready to take beam 15:40 Pilots in Work on beam to inject Adjust SPS to get equal bunch intensities, last bunch below 6e10 SBF interlock on the Extraction BICs, due to the BCT3 in SPS that is slight mis-calibrated. Forced SBF to false as temporary solution. 18:20 Start injection with 8 x 1.1e11 bunches, en = 2.2 – 2.4 B1 looks fine in TL, but losses in LHC giving IQC latches B2 not IQC latches 18:47 both beams dumped. Losses at injection B1 in the LHC BLMs at 05L2 and 06L2 20:00 Preparing for refill but RB.A56 fault Access needed for the FGC in RB.A56 PO and CV to intervene Also and access needed for demineralised water interlock (on CV) in UA83 ... this is to be done in the shadow of the Pt 6 access 09/10/2010 LHC 8:30 meeting

Losses during injection Friday evening 09/10/2010 LHC 8:30 meeting

Next attempt for physics 23:50 pilots in 00:38 beams dumped again during injection for physics Reduced intensity to 1e11 and small emittances of 1.5 – 1.7 um Corrected trajectory in TI2 Orbit and trajectories look good. As before: little losses in tl level of losses at Q5.L2 increased suddenly a lot today. Aperture should be checked! BLM between 60 and 80 % of dump level around cell 5L2 03:40 Manage to get all 2 x 248 bunches in Vacuum peaks below 1e-8: conditioned on previous fill 04:15 Ready to squeeze, but Cryo informs of cryo stop in Point 6 06:40 Trip RB.A81 09/10/2010 LHC 8:30 meeting

Planning for the weekend Communication with Cryo point 6 is back but will need to at least Sunday morning before conditions are ok again In the mean time: Check RB.A81 Check extraction kicker SPS (MKE6) and check trajectory in TI2 Sunday Check aperture around Q5.L2 Physics 2 x 248 bunches (2 fills and 13.5 h to go) V/d Meer Scans next Tuesday Change LHCb polarity after scan 09/10/2010 LHC 8:30 meeting

Outstanding Studies Periodic loss maps (not really MD) Orbit shift versus TCT check: collide 1 bunch and check the TCT center change as compared to predicted orbit change. BI PLL studies during ramp Commission BGI in preparation to ions – switch on at injection Other BI studies – list to be updated Test of 'dynamic' references for the OFB (varying Xing.separation bump): injection, then test of ramp + first part of squeeze. BT Abort Gap Cleaning – on at injection for physics Injection Studies 32 Bunches when required (344 bunches) 09/10/2010 LHC 8:30 meeting

Access Requests Cryo : access to cavern in Pt8 (PM85) to exchange a 24 V power supply not urgent ~ 30 minutes  TI : demineralized water alarm UA83: fixed Friday eve? QPS : 1 resistor switch on RB.78, needs longer access COD: RCBH15.L6B1 Magnetic measurements Pt3 : ~3 hours (hump hunt) L. Walkiers et al Electron cloud coil installation 09/10/2010 LHC 8:30 meeting

Scheduled lift maintenance Some preventive maintenance has been requested on the LHC lifts, and agreed according to the following planning: Tuesday 5 October:             PM15 from 8h to 12h00; PM25 from 13h30 to 17h30 Wednesday 6 October:       PX24 from 8h to 12h00; PZ33 from 13h30 to 17h30 Thursday 7 October: PM85 from 8h to 12h00; PZ85 from 13h30 to 17h30 Tuesday 12 October :          PM56 from 8h to 12h00; PM65 from 13h30 to 17h30 Wednesday 13 October:     PZ65 from 8h to 12h00; PM76 from 13h30 to 17h30 Thursday 14 October:          PM45 from 8h to 12h00; PZ45 from 13h30 to 17h30 PM56 PZ85 La maintenance du PM56 aura lieu le jeudi 7 de 13h30 à 17h30, celle du PZ 85 le mardi 12 de 8h à 12h. 09/10/2010 LHC 8:30 meeting