Metro Wastewater Reclamation District Digester Complex What works and what doesnt.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

How to Convert and Optimize Primary/Secondary Pumping Systems
Advanced Wastewater Treatment Plants.
Desalination Becomes A Reality In Tampa Bay Florida
Energy Day Timing Issues and Operational Concerns Pipeline Segment Wholesale Gas Quadrant North American Energy Standards Board Business Practices Subcommittee.
Purpose of Carburetion
ACTIVE LEARNING PROCESS
Energy-Efficient Process Cooling
Describe a water supply distribution system
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Control and Monitoring of Hydrogen Sulfide in Digester Gas
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
Clarifier Calculations
DEVELOPING THE WALLA WALLA HATCHERY Design criteria for maximizing survival.
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
Stone media TF design Example 1
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
Deep Bed Denitrification Performance
1 CTC 450 Review Preliminary & Primary Treatment Preliminary & Primary Treatment Measure flow Measure flow Screen Screen Grit chamber Grit chamber Primary.
Biological waste water treatment
C. T Calculation Math for Water Technology MTH 082 (pg. 468) Math for Water Technology MTH 082 (pg. 468) “Required by Law”
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
An-Najah National University Civil Engineering Department
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Design of W.W. Collection System
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Math Basics I Area, Volume, Circumference, Converting Inches to Feet, Converting Flow, Converting Percent/Decimal Point, Decimal Point, Detention Time.
DESIGN OF WASTEWATER TREATMENT PLANT
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
Attached Growth Biological WW treatment Systems
Domestic Waste Water Treatment
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
Wastewater generation
Increasing biogas production by thermal (70◦C) sludge pre- treatment prior to thermophilic anaerobic digestion Presented by Reem Satti.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
OZONE DRINKING WATER SYSTEM. CONTENTS Properties of Ozone Production of Ozone Water Treatment Plant – 25 m 3 /hr Ozone Generation System.
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
Lease Automatic Custody Transfer
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
ENGINES. VEHICLE / HEAVY EQUIPMENT SAFETY INSPECTION CHECKLIST OF 296.
DESIGN OF WASTEWATER TREATMENT PLANT
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
November 17, 2015 NC AWWA-WEA Annual conference
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
CEE 426 October :05 PM UW Madison Room 1209 Engineering Hall
LOW D.O. OPERATION: EFFECTS ON BIOLOGICAL PHOSPHORUS REMOVAL, OXYGEN TRANSFER EFFICIENCY, DENITRIFICATION, AND ENERGY SAVINGS.
Thean Chor Farm – Wastewater Treatment System 1 st Anaerobic tank (BOD > 1000 mg/L) 2 nd Anaerobic tank Separation tank Aerobic tank Mixing motor.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
CE 356 Fundamental of Environmental Engineering
Aeration System Opportunities Dave Reardon, PE, ENV SP HDR National Director - Water Sustainability WW/W Sustainable Energy Cohort-Session 5 January 31,
INFILCO DEGREMONT, INC HIGH SOLID ANAEROBIC DIGESTION (HISAD)
Membrane Bioreactors for Wastewater Treatment.
CTC 450 Review WW Collection Systems Types of pipes Installation.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
Conventional Sewage Treatment Plants:
CTC 450 Review WW Sludge Processes.
Attached Growth Biological WW treatment Systems
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
CTC 450 Review Preliminary & Primary Treatment Measure flow Screen
Process Equipment Design and Heuristics - Pumps
Individual Household Treatment Systems (Septic Tanks)
Sizing Septic Tank Volume:
Nitrogen Removal University of Kansas
Presentation transcript:

Metro Wastewater Reclamation District Digester Complex What works and what doesnt.

MWRD Digester Complex Load - Design Configuration Feed/Recirculation Effluent Gas system Gas mixing Digester #4 modifications Strategy, feed, foam Construction effects Digester upsets What works and what doesn,t

MWRD Digester Complex Plant Load 2002 Averages Flow, 140 MGD Suspended Solids, 145 Tons/day BOD, 136 Tons/day

MWRD Digester Complex Design Criteria Peak 2-week loads TS, Tons/day VS, 155 Tons/day 0.13 LbsVS/cuft/day Hydraulic, MGD 2002 load TS, 162 Tons/day(80%) VS, 131 Tons/day(85%) 0.12 #VS/cf/d (92%).915 MGD (81%)

MWRD Digester Complex January 2003 Digester data VS 194 Tons/D (max) VS 81 Tons/D (min) #VS/cf/d (max) #VS/cf/d (min) Effects of varying digester feed rate.

MWRD Digester Complex

Sludge Holding Tank #1 Feed tank for digesters Capacity, 382,000 gals 4 progressive cavity 450 gpm ea.

MWRD Digester Complex Sludge Holding Tanks 2 and 3 De-water and future feed capacity 1,500,000 gals each 4 disc-flo/4 PC pumps

MWRD Digester Complex Anaerobic Digesters 10 digesters Capacity, 1,650,000 gals 28 ft operating level (summer) 1,472,000 gals 25 ft (winter)

MWRD Digester Complex

Digesters feed is sequenced Feed volume by set point Feed rate; manual flow set point or auto flow by SHT level Feeding is continuos 24 hr/d

MWRD Digester Complex

Digester effluent is withdrawn through a snorkel Snorkels can rotate 90 degrees Snorkels can be adjusted to control liquid level of digester Snorkels plug often

MWRD Digester Complex

Atari gas mixing system Gas bubble mixing Uses bubble cannons Gas compressor Uses digester gas for bubble generation

MWRD Digester Complex

Gas mixing effects Digester contents expands Contents specific gravity less than water Entrained gas in contents causes pumping problems Can generate foam

MWRD Digester Complex Operational Precautions Digester contents can expand feet in depth Standard centrifugal pumps are not effective moving this liquid Gas compressor piping critical

MWRD Digester Complex

Digester #4 Modifications Roof Gas compressor Foam trough Foam suppression Foam detection and alarm Pressure relief manhole

MWRD Digester Complex

Foam Strategy Lower digester levels to 25 feet - 6 feet headspace Control digester feed to meet 15 day SRT Pump foam out of digester to sludge holding tank Deal with foam in sludge holding tank

MWRD Digester Complex

Digester Feed Strategy Maintain constant flow rate Do not use SHT level as a pump control Control WAS solids / primary solids ratio Maintain continuos de-watering operations Maintain continuos even digester effluent flow

MWRD Digester Complex Foam Pumping Strategy Find a pump that will pump foam - a double diaphragm air actuated works well Pump foam to SHT and de-water Pump foam to digester #4 - use suppression equipment Pump foam back into itself

MWRD Digester Complex

Aggressive Construction Schedule Construction caused process interruptions Holding solids back in process areas Backing up digestion process Increases load to digesters Causes overload foaming (upset foam) Backed up secondary Nocardia foam

MWRD Digester Complex

Upset Approach Stop all scheduled process interruptions Control digester feed rate Control WAS / Primary solids ratio Chlorinate RAS to control Nocardia Clean up mess daily until process stable

MWRD Digester Complex

What Works WAS/PRI solids control Digester temperature control Steady continuos digester flow Pressure relief manholes What Doesnt Too much WAS not enough Primary 1 degree F swing/24Hr more than 5 days Too many process interruptions No pressure relief