Introduction FY09 Linac Ops Review

Slides:



Advertisements
Similar presentations
How to commence the IT Modernization Process?
Advertisements

Integrated Facility Management (IFM) For NSLS-II October 6, 2010 Chris Johnson Facility Complex Manager Facilities and Operations.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
BENEFITS OF SUCCESSFUL IT MODERNIZATION
The Outsourcing Process
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Comments to P5 Persis S. Drell Director SLAC. February 22, 2008P52 Advice to the Community We have to listen to what we are being told We must be willing.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
PPA 573 – Emergency Management and Homeland Security Lecture 9b - Department of Homeland Security Strategic Plan.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
IT Planning.
June 12, 2007DOE Program Review1 Emergency Information Be aware of exits in your building Be aware of exits in your building –Speaker will indicate locations.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
Chapter 5 Initiating and Planning Systems Development Projects
3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.
The Challenge of IT-Business Alignment
Long Range Planning Pier Oddone September 24, 2007.
1 Office of Legacy Management FY 2007 Budget U.S. Department of Energy February 6, 2006.
DOE Annual Review of SLAC HEP Research Program June 14-16, 2005 SLAC Charge to Committee Issues Procedures.
ACCU Report from GS User Commission G. Passaleva June 15, 2011 ACCU.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Slide 1 People Department Interim Strategic Director Bristol’s Budget Consultation (CYPS) 2014/15 to 2016/17 Isobel Cattermole – Interim Strategic Director.
1 FY09 PPA Budget Kick Off Rafael Alva Charlotte Chang Oct 22, 2008.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
European Structural and Investment Funds Breakfast Briefing 4 th February 2015 Simon Nokes – Deputy Chief Executive, New Economy.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
© Project One Consulting Limited All rights reserved. 0 Introduction to Project One Slides.
B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.
BLINK Research Portal Project Jason DeFay Director, eResearch Administration Office of Research Affairs.
Budget Outlook Glen Crawford P5 Meeting Sep
SLAC All Hands Briefing: FY2008 Budget Persis S. Drell SLAC Director 1/7/08.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies,
1.  Transportation Vision  Near-term Recommendations  Ongoing Work / Next Steps 2.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Introduction to Workforce Planning
Outline The Global Fund Strategy emphasizes the Key Populations
The Electromagnetic Spectrum High Harmonic Generation
Chapter 5 Initiating and Planning Systems Development Projects
COIT Planning & Budgeting
BANKING INFORMATION SYSTEMS
SLAC Accelerators Power Electronic System Operation for Reliability
IT Governance at the SCO
SuperB Injection, RF stations, Vibration and Operations
Responsibilities & Tasks Week 2
TECHNOLOGICAL EDUCATION Long Range Planning
Business System Development
Program Review June 2004 Good Morning
Yet Another Report from DOE Office of High Energy Physics
SLAC PPA Budget Discussion: FY09 Allocations Among BNR Codes
Introduction to Jefferson Lab
Chapter 5 Initiating and Planning Systems Development Projects
By Jeff Burklo, Director
SLAC Site Report.
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
WBS 5.0 LCLS Strategic Projects Division
LINAC OPS Budget Review
Chapter 5 Initiating and Planning Systems Development Projects
LCLS Project Management
Ian Evans SSRL Safety Office
Linac Coherent Light Source Transition to Operations 11 July 2007
Preliminary Project Execution Plan
Conventional Facilities
Welcome from the Director
Presentation transcript:

Introduction FY09 Linac Ops Review Persis S. Drell Director SLAC National Accelerator Laboratory

Outline What did we tell you at the last Linac Ops review? The transformation of SLAC Where we are now FY09 Linac Ops Review Page 2

Laboratory Organization From 2006 Linac Ops Review Reorganized approximately one year ago John Cornuelle appointed COO and Director of Operations John reports directly to the Laboratory Director FY09 Linac Ops Review Page 3

Context of 2006—”Managing Uncertainty” From 2006 Linac Ops Review Areas of certainty: SPEAR3 Operations LCLS Commissioning and Operations Science programs in PPA at same level of support GLAST, ATLAS, Accelerator research, BaBar data analysis, EXO 200 Science programs in photon science at increased level of support LUSI, PULSE, X-LAM,… Areas of uncertainty: Scope of growth in ILC effort New PPA projects: LSST, EXO, SNAP,… SABER Scope of LCLS upgrades FY09 Linac Ops Review Page 4

Summary The laboratory is evolving—rapidly Evolution of manpower From 2006 Linac Ops Review The laboratory is evolving—rapidly Reorienting towards future This is not easy! Evolution of manpower Working well at level of individuals Sufficient flexibility being preserved to mitigate downside scenarios Managing transition to FY09 Preparation for this review an essential step: developing operations scenario for the lab for 2009 FY09 Linac Ops Review Page 5

2008 Budget Omnibus spending bill hit SLAC very hard Early shut down of B-factory Used linac ops planning in targeting staff reductions Total staff reduction: 13% FY08 President’s Request Appropriated Office of Science $4.4B $4.0B BES Nationally $1.5B $1.3B BES @ SLAC $190M $181M HEP Nationally $782M $694M HEP @ SLAC $120M $95M FY09 Linac Ops Review Page 6

A Laboratory in Transition Major transition of scientific portfolio Staged transition of responsibility for linac operations from HEP to BES Transition to multi-program environment ‘One Lab’ TOTAL BES HEP FY09 Linac Ops Review Page 7

2004: HEP BES FY09 Linac Ops Review Page 8

2009: HEP BES FY09 Linac Ops Review Page 9

Current Reality—Transition not yet complete Focus on: Rebuilding much of the laboratory from the ground up in mission support areas Delivering LCLS and LUSI on time and on budget Developing long range vision for the laboratory FY09 Linac Ops Review Page 10

Progress to Date Organization Safety Reorganize to ensure accountability at highest level Safety Emphasize line management accountability Revamp business processes for greater efficiency and transparency Activity based budgeting for all departments Building G&A from ground up Defining core capabilities LCLS will need Focus on optimum support of operations and capabilities needed for future upgrades FY09 Linac Ops Review Page 11

FY09 Linac Ops Review Page 12

Where we still have work to do Mission support functions are still in transition from old ‘HEP’ landlord model Activity based budgeting for the first time “Org burden” needs crisper definition We are working to create the ‘management model’ for the lab Will get us away from legacy landlord issues and attitude Will resolve issues of ‘org burden’, G&A, infrastructure maintenance, legacy issues FY09 Linac Ops Review Page 13

We Will be Transparent on Where We Are Org burden in ETS departments is too large (~25%) Currently bridging functions that will be needed in operations Need improved rigor in activity based (bottom up) budgeting Plan to reduce to reasonable level over 2 years G&A not optimized for multi program laboratory We are maintaining core capabilities and competencies needed to optimize LCLS operations and future upgrades Uncertainty in HEP program affects this FY09 Linac Ops Review Page 14

Org Burden Example Metrology Capability essential for accelerator operations LCLS supports the capability Artificially ‘cheap’ for other users (PPA, SSRL) In past, LCLS benefitted from this model when HEP supported the capability Long term future need more transparent, full cost accounting methodologies FY09 Linac Ops Review Page 15

G&A Currently high as rebuild M&O functions at lab “Swallowing the elephant” Not optimized (first year of transparency) Activity based next year See Sandy’s talk FY09 Linac Ops Review Page 16

Assets Needed for Future Upgrades Have included maintenance of first 2/3 of Linac Optimal technical strategy for potential future upgrades Not the cheapest strategy Lowest risk Highest return on investment for Office of Science Technical capability in ETS departments Klystron---gun development PCD---power supply and modulator upgrades FY09 Linac Ops Review Page 17

Summary Laboratory Still in Transition Site is changing and management model still being defined First real attack on G&A planning More work to go Protecting Core Capabilities and Competencies to Optimize Future LCLS Program FY09 Linac Ops Review Page 18