Gas Performance Assurance Framework February 2013

Slides:



Advertisements
Similar presentations
Web Page Design Critical Elements for a Well Designed Web Page.
Advertisements

How to Document A Business Management System
HISTORY AND ICT Website Tasks The Holocaust. You have been studying the Holocaust in your History lessons recently… …we are now going to use our ICT lessons.
Training Seminar on Implementation of Effective Quality Assurance Systems in Romanian Higher Education Institutions April 1-3, 2009 Sinaia Criteria for.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Setting up a Course and using the Course Tutor Guide Workshop A Kim Tree.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Performance Assurance 5 th August Value Chain Further Evolvement.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
Membership, Representation and Diversity Committee: Changes needed to the RCN Governance Arrangements to implement the RCN Equality Schemes Jane Clarke.
CLINICAL AUDIT A quick guide. Why Audit? ‘Clinical audit is about improvement. If you are not changing or improving things as a result of audit then ask.
A Presentation on Presentation Design. Presentation Basics To create your presentation: Research your content Identify your audience Choose a design Write.
February, MansourahProf. Nadia Badrawi Implementation of National Academic Reference Standards Prof. Nadia Badrawi Senior Member and former chairperson.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Gas Performance Assurance Framework 11 th January 2013.
Design of Digital poster. Master Page Include on this page the common features of all the pages such as Position of anomated Logo Background details Type.
Introduction to Designing a Website
Scrutiny of RIAs Problem Definition and Objectives
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Gas Performance Assurance Framework March 2013
Code Governance Review UNC Modification Proposals
Options for Mod 640 Replacement
Performance Assurance Framework Risk Register Consultation Summary
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
WW HMI SCADA-17 Wonderware Developer Network: Overview and Roadmap
PN UNC Workgroup Invoicing 4th October 2011.
Setting Actuarial Standards
Weekly Progress Update 3rd Aug 2018
Writing, risk + remix Abduction… it’s a gas! Darren Tofts 1
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
Different font styles used for every word
WW TSS-06 S2 Monitor Automated Galaxy Log Monitoring Application
Incentives 26 September 2018.
PAF Risk Register and PARR mapping
AV 01 Avantis User Group Opening – Asset Performance Leading to Operational Excellence
Project Nexus Workgroup
Slide Title Edit Master text styles Second level Third level
Weekly Progress Update 13 July 2018
PLEASE DELETE THIS SLIDE WHEN YOUR PRESENTATION IS COMPLETE
Gas Performance Assurance
Project Nexus Workgroup
MOD 232 Proposal, Richard Dutton 16th December2008
Guidelines Use a Large Bold Font (20PT or Larger)
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Weekly Progress Update 15 June 2018
Modification 0429 scenarios v2.0
Project Nexus Workgroup
ASC Qdos Scheme Changes Agent
Project Nexus Workgroup
PN UNC Workgroup Settlement Overview
Proposed amendments to the AUG Guidelines
Non Functional Topic 6th December 2011
PN UNC Workgroup (Settlement topic)
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Project Nexus Workgroup
UNC Modification Performance Assurance Framework Incentive Regime
Project Nexus Workgroup
Title slide [from Title Slide master]
Performance Assurance Framework (‘PAF’):
Project Nexus Workgroup
Project Nexus Workgroup
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
Development Work Group 194
Mod UNC 0674 Business Rule Development
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Gas Performance Assurance Framework February 2013 Title slide [from Title Slide master] The title slide is available as a Title Master and the background and graphic elements are fixed. Text is editable for the slide heading and presentation details but the British Gas brand mark and other graphic elements are fixed on the Title Master. Font, type size and colours are fixed for the Title Master style and should not be modified.

The purpose of the Performance Assurance Framework must be defined as a first step. The purpose of the Performance Assurance Framework must be understood and defined, and its benefits quantified: Why is it needed? What does it need to achieve? How will it achieve it? How will the gas industry be improved? High level principles: The focus must be on assuring the performance of the Nexus settlement processes only. The critical parts of the Nexus design must be identified. Performance standards must be set appropriately to allow Nexus to work. Appropriate penalties should be developed if standards are not met. The process should run with a minimum of administration. The process must not require any subjective judgement decisions. There must be a process for review and revision of standards (e.g. Mod process).

Once the purpose is agreed, performance standards and measurement can be defined. Only then should detailed governance arrangements be considered. Performance standards should be defined against each of the Nexus processes, in light of the questions on the previous page: AQ Calculation Meter Reading Submission Reconciliation / Settlement Retrospective Updates. Performance should be regularly monitored against the agreed standards: Performance standards and penalties should be well defined and agreed. Regular MI is required to monitor performance against standards. The process should then be able to run itself (e.g. Mod 640), with a minimum of administration. Appropriate penalties will incentivise Shippers to perform to the required standard. Any industry-wide issues (e.g. shipperless sites, unidentified gas, shrinkage) which might affect performance should continue to be addressed in the relevant working groups. There is no need for a performance assurance board or committee to provide a subjective judgement on performance. If changes are required to the standards and reporting, the Modification process could be used.

PAF Roadmap and Planning

PAF Roadmap and Planning continued