Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.

Slides:



Advertisements
Similar presentations
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Advertisements

:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
Week 13: R. Assmann, J. Wenninger
Ion Commissioning: Thursday & Friday
Wednesday
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Thursday morning 09:30 Dump of pPb fill.
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
Summary week 29 VdM scans Luminosity production
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday Morning 7:30 injection for fill 2908
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Monday – Morning Fill 3265 stable beams since 1:31
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
LHC Status Tue Morning 22-Aug
Sat morning Until 12:40: Loss maps at injection
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1. 11:00 Injecting 1 probe +3 indiv bunches of 9E10 ppb. Blow in PS-SPS line (TT10). Emittances in the LHC 3-3.2 um. 11:40 At flat top, opening TCTs for first collisions in VdM configuration. TCPs at 5.3 sigma. No losses in ramp. 5/4/2019 LHC 8:30 meeting

Monday afternoon 12:10 Colliding beams. Problem with the tune that did not change from injection to physics values. We realized that in our collision sequence we do not drive the main /matching quadrupoles. Drove the quadrupoles some time later and adapted the sequence… After orbit correction, we actually had some luminosity in each IP to bootstrap. Easily optimized each IP in turn. Define SIS interlock settings with margins for VdM. 13:40 TCT setup starting. 15:20 TCT alignment finished. 5/4/2019 LHC 8:30 meeting

Monday afternoon TCTs to 30 sigma (TCPs 5.3 sigma), beams re-separated with lumi-scan knobs to 4.5 sigma for ADT loss map. In the meantime trip of RF module M2B1 (crowbar). Loss maps. Looking good, except B1V with in-correct hierarchy. But good cleaning. 5/4/2019 LHC 8:30 meeting

Setup of collimators The setup is declared sufficient for the VdM given that: the cleaning is still very good (and we will have 40 times less intensity than the standard physics fills!); the hierarchy issue occurs in the vertical plane; the VdM scans will be done with bunches spaced by >= 1us; the transverse emittance will be blown up to > 3 microns; the single bunch intensity is about 9e10p; the phase space coverage by the secondary collimators remains the same as in the nominal fills; the IR6 collimators also remain at nominal settings; 5/4/2019 LHC 8:30 meeting

Monday Evening 17:30 Loss maps with beams in collision (using tune jump). Followed by off-momentum loss map dp/p +. 19:10 Refilling for loss maps. 20:10 Step loss at start of collisions due to orbit shift from tune change Orbit feed-forward for next fill from offline analysis. 5/4/2019 LHC 8:30 meeting

Monday evening / night 21:00 Another series of loss maps in collisions (betatron and off-momentum dp/p -). 22:10 Injecting for asynchronous beam dump test. 23:30 Asynchronous beam dump test. Dump test OK (C. Bracco). 00:30 Injecting for VdM fill. 01:30 Again crowbar on RF module M2B1. To be fixed during daytime asap – 3 hours. 03:50 Stable beams for VdM fill. But I had forgotten to adjust beta* limits – fixed. 5/4/2019 LHC 8:30 meeting

Today 08:00 Beam dumped again by RF module M2B1 – RF arc detected. ALICE VdM scans finished. Today: Access of ~3 hours for RF intervention. VdM fill for ATLAS/CMS. VdM fill LHCb. 5/4/2019 LHC 8:30 meeting