Pole of EDF Breaker © ABB Group May 2, 2019 | Slide 1.

Slides:



Advertisements
Similar presentations
Energy Service Fossil Product Portfolio
Advertisements

© ABB Group April 29, 2015 | Slide 1 Overhauling kit for ED Breaker.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
GCB Service Earthing Switch Retrofit Kit for HGC-3 & HEC 3..6 ABB High Current Systems Services © ABB Group April 15, 2017 | Slide 1.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
ABB Reliability Fingerprint
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Master-Untertitelformat bearbeiten Life cycle services Improving productivity of processes and applications Jukka Palmunen, Low voltage drives, September.
Presentation on Preventive Maintenance
Replacement of BLK152 to BLK 222 Drive for LTB 145 D1/B Breaker
Life cycle services for automation products
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
CLEARLY WE KNOW HOW TO BURY LARGE STRUCTURES. DRILLING AND BURYNG ALONG THE SAME ROUTE AS THE “POLES” SHOWS IT CAN BE DONE !!
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
For Low Voltage Circuit Breakers Service Product Management, December 2015 Extended Warranty.
Development of The SF6 Circuit Breakers
Chapter 16 Supplement Maintenance.
15S Maintenance.
continued on next slide
Mersen’s Fused Coordination Panelboard

PPHV Services Sales & Marketing Amber Fort, Jaipur
SALES: HOW TO USE THIS PRESENTATION
Low Voltage Products - LP Life Cycle Management - LCM
ABB SACE Maintenance Preventive Maintenance Program
Drive life cycle management model
                                                                                                                                                                                                                                                
SF6 Live tank circuit breakers
SF6 Live tank circuit breakers
continued on next slide
continued on next slide
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
SF6 high voltage live tank circuit breakers After Sales & Service
Warranty PLUS Service PROGRAM*
SF6 Live tank circuit breakers
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired. 1.
FSA Drive of EDF Breaker
The initial step on your ABB care journey
Sisu Axles: Predictive axle maintenance
Florida PSC Hurricane Preparedness Meeting May 6, 2009
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired. 1.
You may choose to use any one of these provide slide templates and make changes as desired. 1.
High level of efficiency and availability of production Maintenance contract for the gas analyzers Customer need Maintain and manage the lifecycle of the.
You may choose to use any one of these provide slide templates and make changes as desired.
In ABB AbilityTM Electrical Distribution Control System (EDCS)
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Specifications What should it cover Goods Services Warranty
You may choose to use any one of these provide slide templates and make changes as desired. 1.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
Preparing the Proposal
You may choose to use any one of these provide slide templates and make changes as desired.
Its strengths, your benefits
You may choose to use any one of these provide slide templates and make changes as desired.
continued on next slide
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.

You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
You may choose to use any one of these provide slide templates and make changes as desired.
Pole Position Student Points Time
A B C D.
You may choose to use any one of these provide slide templates and make changes as desired.
continued on next slide
Presentation transcript:

Pole of EDF Breaker © ABB Group May 2, 2019 | Slide 1

Spare pole of EDF Breaker Customer Benefit Spares pole planning supports the objectives of power plant operators & maintenance personnel Reduce downtime in case of an major failure/unexpected down time Reduce outage time during preventive maintenance (expected downtime) Replacement of spare pole can be done within 8 hours. © ABB Group May 2, 2019 | Slide 2

Spare pole of EDF Breaker Scope of offer Supply of Complete spare pole of EDF CB Replacement of spare pole in Breaker(option of doing form PSC or LSC ) © ABB Group May 2, 2019 | Slide 3

© ABB Group May 2, 2019 | Slide 4