Wrap Rate Technique Chapter Introduction The Wrap Rate technique is a method used to allocate profit and other overhead costs to actual.
Advertisements

Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
Chapter 5: The Production Process
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Effective Methods for Software and Systems Integration
Introduction to Computer Aided Process Planning
Detail and Assembly Drawing
Process Planning and Computer Aided Process Planning
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Chapter 4 Process Design.
Construction of “Curio” style Cabinet by Miguel Del Real.
Production Decisions Chapter 6 Mr. Higgins. Objectives Identify the need for a plan of procedure Identify the need for a plan of procedure List the steps.
Chapter 7 The Practices: dX. 2 Outline Iterative Development Iterative Development Planning Planning Organizing the Iterations into Management Phases.
UNIT-IV Shop Floor Control and Flexible Manufacturing Systems
Documentation.
Procedures Before the Test Be prepared Be prepared –Sharpen your pencil –Clear everything off your desk Be polite Be polite –Stay in your seat and wait.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
To Panelize or Not to Panelize
Material Requirements Planning
Production Planning and control – ME 1009 Unit 1 Introduction.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
1 Introduction to Engineering Spring 2007 Lecture 4: Engineering Design II.
Chapter 7: Manufacturing Processes
Job-Order Costing: Calculating Unit Product Costs
Chapter 3 Costing Systems: Job Order Costing
How to Cover Your Book.
Working Drawings Competency: 00X.00
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Board Replacement for Floating Floors
Process Layout Chapter #6.
Prepared by Debby Bloom-Hill CMA, CFM
Process Costing and Hybrid Product-Costing Systems
Process Costing and Hybrid Product- Costing Systems
Maintenance Scheduling
Facility Inventory Old Facilities Modern Facilities Classroom Size
Unit 6.05 and 6.06-Learning about blueprints
Cost Accounting and Reporting Systems
MANAGEMENT ACCOUNTING
Basics of Garment Manufacturing
BUAD306 MRP/ERP.
Factory Tour 2008.
FedEx Processing Standard Work
Documentation.
Job Order Costing and Analysis
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
Standing and Running Trim
PRODUCTION PLANNING AND CONTROL
Apparel management & quality control
Top Tips Summary: Software Engineering in practice
Team Building Working with others.
Consulting Captains, LLC
Career & Technology Education
Engineering Overview Introduction to Engineering Design
Gaskets and Packing An introduction to Gaskets Packing
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
Engineering Overview Introduction to Engineering Design
ARCH 435 PROJECT MANAGEMENT
Operations Management
Fields of Engineering Principles of EngineeringTM
COMPUTERIZING YOUR ESTIMATING PROCESS
AS 9100 Awareness Training.
Engineering Overview.
Engineering Overview.
ESTIMATE TAKE-OFF & RELATED MATH WORKSHOP - Part 2
Engineering Overview.
Career & Technology Education
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

Career & Technology Education Addendum - Custom Presented by Mike Bell AWILL Career & Technology Education Module 14 The purpose of this module is to introduce the group to more complex custom items. This is being presented as an addendum to the base bid to experience an addendum in a “real life” model.

Receipt of an Addendum Drawings of the Reception Desk Additional renderings to represent the desk visually This Addendum will consist of a Custom Reception Desk. This will include finishing and installation. The Presenter will ask for a new table captain - How many wheels in the driveway/garage? - New table captain will come up to receive the addendum items. Packet will consist of: Addendum Drawings and (3) renderings.

Custom: Reception Desk Understanding the Processes Step by Step Material Take-off Building the Item on paper A Complete Labor Take-off Total Material and Labor Presenter does an introductory outline of what tasks will need to be completed.

Custom: Reception Desk Understanding the Processes Additional Engineering and Drafting Required Spend enough time in plant to familiarize yourself with how custom items are built Better yet – work with your custom people and follow a project through your plant The more you understand the processes, the better estimate you will generate With custom items it is very important to understand all of the processes required to produce and install the custom items. This starts with Engineering. Often it means that the estimator will add additional engineering time to their bid. Next, it is important to know how custom items are built. We will be following these processes throughout this module. Spend some time on the plant floor. Go out to the jobsite and see how these items are incorporated into a project. The more you understand these processes, the better you can estimate the time and material required to build, finish and install custom architectural woodwork.

Custom: Reception Desk Understanding the Processes Everything starts with engineering. The shop drawing process is necessary for submittal purposes, but is absolutely essential to determine how a custom item will be built. If engineering is left to the shop floor, not only will production time be reduced to “head scratching time”, but accuracy and predetermined joinery will be reduced to convenient solutions. Quite often custom items need to integrate with other material, other jobsite conditions, specific required openings and any combination of appliances and equipment. Without due diligence in the Engineering process costs can skyrocket and disasters can thrive and multiply. Engineering

Custom: Reception Desk Understanding the Processes Once a custom item is released for fabrication, proper layout by a top custom journeyman is essential to start the project in the right direction. Laying Out

Custom: Reception Desk Understanding the Processes Part by part, the machining process begins by cutting out the panel stock. Cutting Panel Stock

Custom: Reception Desk Understanding the Processes Intricate components are taken to CNC machining centers for radius cut-out and various machining steps. Without a CNC machining center, additional hours are required to either build various jigs or simply cut out with band saws and machine with handheld routers. Machining out Parts

Custom: Reception Desk Understanding the Processes Die walls are a common component of much of the custom architectural woodwork. The assembly of die walls is a common practice in a custom department and it is fairly easy to learn to quantify the hours required. Assembling Die Walls

Custom: Reception Desk Understanding the Processes After the die walls are assembled, they are skinned out with laid up panels, laminate clad panels or any other substrate and surface material. Skinning out Walls

Custom: Reception Desk Understanding the Processes Once the walls are complete, the journeyman can begin to assemble the unit, fitting and assembling parts as required. Assembling Parts

Custom: Reception Desk Understanding the Processes Once a custom item has been assembled, if finishing is needed, quite often a disassembly process must be accomplished to take the item apart for component finishing. Prior to finishing is an extensive sanding procedure that must be carefully executed to prepare the parts for custom finishing. Sanding and Finishing

Custom: Reception Desk Understanding the Processes Further disassembly may be required in order to prepare the item for shipping and delivery. Protective wrapping quite often is required and could add additional costs to producing this item. Careful loading can only be done by spending the time required. You might consider this in your estimated time and material recap. Disassembling and Shipping

Custom: Reception Desk Understanding the Processes With proper engineering, machining and fabrication proceeding the installation process, things should fit together nicely on the jobsite. The better coordination done prior to installation, the more contained the installation hours will be. Installation

Custom: Reception Desk Step by Step Material Take-off With a thorough understanding of the processes required, begin a step-by-step material breakdown. List all material needed to build this item.

Custom: Reception Desk Building the Item on paper The estimating process for custom items essentially is building the item on paper.

Custom: Reception Desk A Complete Labor Take-off Each labor operation must be listed and hours to perform can be derived from the Cost Book.

Custom: Reception Desk Total Material and Labor A compilation of all material costs and all hours needed by operation equals your dollar costs.

Time is given for the companies to do a thorough break down of material and labor for this desk. Presenter does a summary of what tasks have been completed and reviews the material required and labor operations that will be necessary. Presenter informs attendees to place totals with their bid.