Harbour Island Force Main Replacement

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

Capital Beltway HOT Lanes Project Project Update April 2009.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Montgomery County Transit Task Force Meeting August 17, 2011.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
City of Charlottesville
2nd Street Drainage and Paving Improvements
Four Winds Condominium Association August 2, 2017
S.R. 30A / U.S. 98 / Panama City Beach Parkway
June 5, 2017.
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
Col. Pike Multimodal: About the Project
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
107th & 110th Avenue North Public Utilities Renewal Projects
The Oakton Condominium Association September 12, 2017
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Highway 14 – Owatonna to Dodge Center District 6 Update
Ad Hoc Advisory Group presentation, August 3, 2016
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
STREETS & STORMWATER DEPARTMENT
IA 122 RECONSTRUCTION PRE-BID MEETING
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test
Highway 169 Bridge Replacement & Pavement Resurfacing
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Contract 60X10 Informational Meeting Weber I-55
Mount Vernon Community School
Meadow Lake Boulevard Street Extension Project
Strategic Planning Timeline Overview
M14A/D Select Bus Service
Walker Street Reconstruction Project 25% Design Public Hearing
Sprague Avenue Phase II Survey Results and Next Steps
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Metropolitan District | mndot.gov
2015 January February March April May June July August September
January 2020 Proposed Service Changes Public Comment Meetings
Presentation transcript:

Harbour Island Force Main Replacement Design – Build Project Public Meeting March 26, 2019

Agenda Project Update Preferred 48”/54” Force Main Route Status of Easements Proposed 12” Force Main Route Pipeline Investigation Results Upcoming Road Impacts/Closures Timeline and Coordination Water St. Construction and Other Future Work Questions

Preferred 48”/54” Force Main Route

Status of Easements APPROVAL: Port Easement STILL AWAITING APPROVAL: Hendry and Glover properties are agreeable to the easements and appraisals are in the process of being performed Easement across Cotanchobee Park requires approval by Florida Communities Trust – the request is under consideration

Proposed 12” Force Main Route

Coordination of 12” Force Main With Transportation Project Installation of 12-inch force main will be coordinated with upcoming complete streets project on Knights Run Avenue and Beneficial Drive City is expediting design and construction of 12-inch force main Construction estimated to start in early 2020

Pipeline Investigation Results Pipeline Investigation on Franklin St. at Convention Center was completed in early January and results show sections where the internal coating has deteriorated Approximately 600-ft of pipe requires rehabilitation by carbon fiber lining of the interior.

Pipeline Rehabilitation & By-pass Installation Plan of Action Approximately 600 linear feet of line will need to be rehabilitated with carbon lining Will require the installation of a bypass system Work to start in March and be completed in July 2019.

Pipeline Rehabilitation/By-Pass Impacts to Harbour Island Bridge By-pass piping will need to be installed on the Harbour Island Bridge along the east side sidewalk. Work to start in mid to late April. Installation of piping will require temporary closure of the east side sidewalk and the north bound lane during off peak hours for the durations noted below: South Connection Point: 2 days Bypass Piping: 10 days Reset Linestop 3 days The sidewalk on the east side of the bridge and the north bound lanes will remain open after installation and during rehabilitation work. After completion of rehabilitation work (estimated in late June), by-pass piping will be removed which will impact the north bound lane during off-peak hours. Duration will be coordinated closer to start date.  

Additional Impacts Franklin Street Pipeline rehabilitation work will require the shortening of the south bound left turn lane north of Water Street to facilitate required safety measures. Air Release Value (ARV) Installation Work will occur during the pipeline rehabilitation and will require excavation in the south bound travel lanes on Franklin Street north of Platt Street Excavation will require closure of south bound lanes of Franklin Street. Closure will occur over a two night period on non-event nights. Road will be re-opened by 7:00am each day.

Timeline for Harbour Island Force Main Final Route recommendations to the City by May 2019 First Segment of Harbour Island Force Main Installation (along Water Street) began in mid-December 2018. Scheduled to be completed by August 2019 All work will stop from April 28, 2019 until Tampa Bay Lightning season concludes Proposed 12” Force Main Design scope and approval of contract amendment in progress Design and development of construction contract estimated to be completed by October-November 2019. Construction will likely start in early 2020 and will last approximately 3-4 months Final 48”/54” Force Main route design Design scope and contract amendment to be developed after approval of route selection Design will take approximately 1 year

Water Street Construction and Other Future Work Old Water Street No later than 4/8/19, we will reopen Old Water from Franklin to Florida Avenue north and southbound movement on Florida Avenue will be open. We will shut down all eastbound movement on Old Water from Florida Avenue from 4/8/19 – 4/29/19. One westbound lane will remain open until 4/8/19 and then the roadway will be closed from Florida to Morgan in all directions. All work will cease on 4/29/19 and all roadways open until mid-June. TECO Manhole/Conduit Relocation on Beneficial Drive Work to begin in mid-April Will require the closure of one south bound lane on Beneficial from Channelside to the Tampa Bay History Center Work will conclude at the end of July 2019 Franklin Street at Old Water Street for New Crosswalk work SPP Roadway Improvements on Old Water Street and Franklin Street Work to begin Summer 2019 MOT Plans not finalized – but road closures will occur

Project Website: www.hiforcemain.com Q & A Project Website: www.hiforcemain.com Project Hotline: (813) 235-4830 I’ll open it up for questions.