IEEE P Wireless RANs Date:

Slides:



Advertisements
Similar presentations
LB84 General AdHoc Group Sept. Closing TGn Motions
Advertisements

[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
IEEE WG Status Report – July 2005
IEEE White Space Radio Status Report
LB73 Noise and Location Categories
LB73 Noise and Location Categories
WRAN Protocol Reference Model(PRM)
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
November 2013 Opening Report
[place presentation subject title text here]
Motions Date: Authors: January 2006
IEEE White Space Radio Status Report
(Presentation name) For (Name of group) (Presenter’s name,title)
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
On Coexistence Mechanisms
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
IEEE WG Opening Report – July 2008
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
September Opening Report
LB73 Noise and Location Categories
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
EC Motions – November 2005 Plenary
Liaison Report From Date: Authors: Month Year
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
September 2012 Opening Report
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGp Closing Report Date: Authors: January 2006 Month Year
TGu-changes-from-d0-03-to-d0-04
Tge Closing Report Date: Authors: July 2005 July 2005
PSMP Adhoc Oct TGn Adhoc
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
July 2013 Opening Report Date: Authors: July 2013
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

IEEE P802.22 Wireless RANs Date: 2006-11-16 November 2006 November 2006 IEEE 802.22.1 Timeline IEEE P802.22 Wireless RANs Date: 2006-11-16 Authors: Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Carl R. Stevenson as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee.org. > Monique Brown, Motorola, Inc.

Schedule Scenarios Two scenarios are given here: November 2006 Schedule Scenarios Two scenarios are given here: Draft ready for letter ballot in Jan 07 Draft ready for letter ballot in Mar 07 Monique Brown, Motorola, Inc.

Schedule November 2006 Procedural Step Dates for (1) Dates for (2) Draft complete and ready for letter ballot Jan 07 Mar 07 Move that the draft be put to letter ballot (at meeting) 30 day letter ballot period (immediately following meeting) Begin comment resolution (immediately after ballot closes) Feb 07 Apr 07 Start recirculation ballot #1 (at meeting) May 07 July 07 15 day recirculation ballot (immediately following meeting) June 07 Aug 07 Start recirculation ballot #2 (at meeting) Sept 07 Oct 07 Monique Brown, Motorola, Inc.

Schedule (con’t.) November 2006 Procedural Step Dates for (1) Start recirculation ballot #3 (at meeting) and draft invitation for sponsor ballot * Sept 07 Nov 07 15 day recirculation ballot (immediately following meeting) Close editorials and get draft ready for sponsor ballot Oct 07 Dec 07 Seek approval from ExCom to go to sponsor ballot (week of meeting) Jan 08 30 day sponsor ballot (immediately following meeting) Begin comment resolution (immediately after ballot closes) Feb 08 Start recirculation ballot #1 (at meeting) ** Mar 08 May 08 10 day recirculation ballot (immediately following meeting) * Three recirculation ballots are assumed. Actual number may vary. Recirculation process continues until no new valid technical comments and no new “no” votes are received. ** One recirculation ballot is assumed. Actual number may vary. Recirculation process continues until no new valid technical comments and no new “no” votes are received. Monique Brown, Motorola, Inc.

Schedule (con’t.) November 2006 Procedural Step Dates for (1) At meeting, seek approval from ExCom to submit draft to RevCom May 08 July 08 RevCom meets to approve * June 08 or Sept 08 ** Sept 08 RevCom submits to Standards Board for approval Standards Board meets to approve Publish TBD *** * 2008 schedule not out yet. Dates are based on the 2006-7 schedule. ** Depends on date of agenda deadline. Sept 08 is more likely. *** Depends on availability of IEEE staff. Monique Brown, Motorola, Inc.