Document Management Policy

Slides:



Advertisements
Similar presentations
SEM16-05 Maintenance & withdrawal of documents ETSI Seminar © ETSI All rights reserved.
Advertisements

SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
1 A Firm Step of 3GPP for UE Conformance & Interoperability Shicheng Hu ETSI PTCC 22 May 2003.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
ESSnet Stanprep The CEN Standardisation Process. CEN Overview: A standard (French: Norme, German: Norm) is a technical publication that is used as a rule,
How ETSI publishes 3GPP specifications. 15 October 2000JMM2 A 3GPP specification is based on the standard template (available from
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
Submission doc.: IEEE /0089r1 January 2015 Steve Shellhammer, QualcommSlide 1 3GPP LAA Liaison Approval Process Date: Authors: Notice:
NWSChat (Instant Messaging) Instant Messaging system for the NWS and Partners NWSChat Carlos Diaz June 2009.
1 An Analysis of 3GPP and 3GPP2 Requirements for Common IMS January 2008 Source:Aleksandar M. Gogic, Chair TSG-S WG-1.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.
Page 1TTT - May 12, GPP IMS Standardization Update Bell Labs Innovations Lucent Technologies Room 9C Lucent Ln. Naperville, IL E Mail.
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
The lifecycle of a GSM spec Or All you ever wanted to know about where little GSM specs come from.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
World Class Standards 1 ETSI/Parlay and 3GPP Correspondence  Parlay 3 published as ETSI ES  Aligned with 3GPP TS Rel-4  Parlay 4 published.
Month Year doc.: IEEE yy/xxxxr0 July 2017
ISO TC 204 CHOD Meeting 27 April 2006
CT WG6 status report to TSG CT #75
Introduction to PTI Elise Gerich | ICANN 57 | November 2016.
PWG Plenary Status Report Semantic Model Working Group
Global Standards Collaboration (GSC) GSC-15
WPM ad-hoc group report TP#25
Overview of Documents for Third Earth Observation Summit
Standards Development: An Overview
Status on KPAS (Korean Public Alert System) over LTE
eCall: Creating momentum towards the networked car
HMA Follow On Activities
Potential Milestones A timeline to finish in one year
Parlay/OSA: open APIs for service development
Liaison Report Date: Author: Jan 2008 Month Year
Standards Break Out Session
Septe 2018 doc.: IEEE November 2018
IC DRAFT REPORT IEEE 802 Network Enhancements for the Next Decade Report Date: 13 November 2018 Chair: Roger Marks, Huawei (since March 2018) Participants:
WG Technical Editor’s Report
eCall: Creating momentum towards the networked car
Septe 2018 doc.: IEEE November 2018
ETSI Protocol and Testing Competence Centre (PTCC)
Next Steps Advisory group debrief call Circulate meeting summary
OMA Perspective ETSI SOS Interop II Meeting
Liaison Report Date: Author: July 2006 Month Year
Liaison Report Date: Author: Sept 2006 Month Year
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Liaison Report Date: Author: Mar 2007 Month Year
Submission Title: [VHT liaison report] Date Submitted: [15 May 2008]
IEEE P Working Group for Wireless Personal Area Networks
Liaison Report Date: Author: Nov 2007 Month Year
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Meeting Slides Date:
3GPP Update/Status (Release 15 – June 2018)
WiGig technologies IEEE ad/ay
Submission Title: TG4m 4TV Closing Report for September 2013
IEEE MEDIA INDEPENDENT HANDOVER
Liaison - Session #52 Closing Plenary
Cg-18 Special Sessions Topic 4; Infrastructure -
TG 1 November Session Opening Report
802.11af Liaison Report Date: Authors: January 2013
Task Group N Schedule March 15, 2004
STF393 Final Report Summary TTCN-3 Language Maintenance
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Closing Report Date:
3gpp-liaison-report-may-2005
Presentation transcript:

Document Management Policy Parlay 3.x published as ETSI ES 201 915 Except PAM and Policy Management Parlay 3.x PAM and Policy Management published by Parlay Parlay 4.x published as ETSI ES 202 915 Including PAM and Policy Management Parlay 5.x published as ETSI ES 203 915 Including new Multi Media Messaging SCF Parlay 3.x kept aligned with 3GPP Release 4 TS 29.198 3GPP Release 4 aligned with Parlay 3.1, 3.2 etc. using 3GPP CR procedure Version of 3GPP specs. identified by 3GPP TSG plenary at which they were approved. Parlay 4.x kept aligned with 3GPP Release 5 TS 29.198 Parlay 5.x kept aligned with 3GPP Release 6 TS 29.198 Parlay 3.x maintained in parallel with Parlay 4.x etc. Reason for change in ETSI ES specification number Backwards compatibility ensured

Parlay Phase 3 Parlay 3.0 published as ETSI ES 201 915 v.1.1.1 Aligned with 3GPP TS 29.198 Release 4 from Sept. 2001 Published March 2002 Parlay 3.1 published as ETSI ES 201 915 v.1.2.x Aligned with 3GPP TS 29.198 Release 4 from March 2002 Published July 2002 Parlay 3.2 published as ETSI ES 201 915 v.1.3.x Aligned with 3GPP TS 29.198 Release 4 from June 2002 Published October 2002 Parlay 3.3, ETSI ES 201 915 v1.4.x Completed March 2003 Aligned with 3GPP TS 29.198 Release 4 from March 2003 Parlay 3.4, ETSI ES 201 915 v1.5.1 Completed September 2004 Aligned with 3GPP TS 29.198 Release 4 from September 2004

Parlay Phase 3 vs. 3GPP Release 4 Part Name Differences in 3GPP TS 29.198 Rel-4 1 Overview - 2 Common Data 3 Framework Framework to Enterprise Operator not in 3GPP 4 Call Control Multi Media, Conference Call Control not in 3GPP 5 User Interaction 6 Mobility User Location Emergency not in 3GPP 7 Terminal Capabilities 8 Data Session Control 9 Generic Messaging Not in 3GPP 10 Connectivity Manager 11 Account Management 12 Charging

Parlay Phase 4 Parlay 4.0 published as ETSI ES 202 915 v.1.1.1 Includes PAM and Policy Mgt Aligned with 3GPP TS 29.198 Release 5 from Sept. 2002 Published January 2003 Parlay 4.1, ETSI ES 202 915 v1.2.x Completed March 2003 Aligned with 3GPP TS 29.198 Release 5 from March 2003 Parlay 4.2, ETSI ES 202 915 v1.3.1 Completed September 2004 Aligned with 3GPP TS 29.198 Release 5 from September 2004 Parlay 4.x & 3GPP Release 5 maintained in alignment Only partial minor releases Only re-publish parts which are changed Link to Joint Working Group Information http://docbox.etsi.org/tispan/Open/osa/

Parlay Phase 4 vs. 3GPP Release 5 Part Name Differences in 3GPP TS 29.198 Rel-5 1 Overview - 2 Common Data 3 Framework Framework to Enterprise Operator not in 3GPP 4 Call Control Conference Call Control not in 3GPP 5 User Interaction 6 Mobility User Location Emergency not in 3GPP 7 Terminal Capabilities 8 Data Session Control 9 Generic Messaging Not in 3GPP 10 Connectivity Manager 11 Account Management 12 Charging 13 Policy Management 14 Presence and Availability Mangement PAM Provisioning SCF, IpPAMAgentPresence not in 3GPP

Parlay Phase 5 Parlay 5.0, ETSI ES 203 915 v.1.1.1 Completed September 2004 Aligned with 3GPP TS 29.198 Release 6 from September 2004 Parlay 5.x & 3GPP Release 6 maintained in alignment

Parlay Phase 5 vs. 3GPP Release 6 Part Name Differences in 3GPP TS 29.198 Rel-6 1 Overview - 2 Common Data 3 Framework Framework to Enterprise Operator not in 3GPP 4 Call Control Conference Call Control not in 3GPP 5 User Interaction 6 Mobility User Location Emergency, User Binding not in 3GPP 7 Terminal Capabilities 8 Data Session Control 9 Generic Messaging Not in 3GPP 10 Connectivity Manager 11 Account Management 12 Charging 13 Policy Management 14 Presence and Availability Mangement IpPAMAgentPresence not in 3GPP 15 Multi Media Messaging

Approval Procedures ETSI Standard (ES) 1 month TC SPAN approval by e-mail 60 day ETSI Member Vote (only editorial comments) Final Draft for Member Vote is Published ETSI Technical Specification/Report (TS/TR) Immediate Publication 3GPP 4 revisions/year following each TSGs Plenary, immediately available Published as TS/TR by ETSI (also by other standards bodies) Parlay 60 day IPR review for major release 30 day Member Vote For joint ETSI/Parlay docs, ETSI Member Vote only after Parlay IPR review completed.