3 GHz and 30 GHz Conditioning Programs

Slides:



Advertisements
Similar presentations
KEB COMBIVERT F5-M Exercises.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Automatic Conditioning J. Alberto Rodriguez. Outline Purpose of an automatic conditioning system General overview Fast signals Long term access to data:
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
30 GHz waveguide line modification towards 12 GHz.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
J. Haimson and B. Mecklenburg Haimson Research Corporation FG02-05ER84362 Work performed under the auspices of the U.S. Department of Energy SBIR Grant.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Steve Lewis Gas Detector 6 December Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Anders Sunesson RF Group ESS Accelerator Division
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
RF phase & amplitude stability of the CTF klystrons By Dubrovskiy Alexey 4 February 20091CLIC beam physics meeting And thanks to Frank Tecker and Daniel.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
30GHz system improvements Jan Kovermann RF meeting
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
X-Band Test Stands: Conditioning and Operational Algorithms Joseph Tagg National Instruments Switzerland.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Areal RF Station A. Vardanyan
MicroTCA Development and Status
RF acceleration and transverse damper systems
Multi-stage pulse compressor
Outcome of BI.DIS Fast Interlocks Peer Review
Diagnostic & Control Status
Spoke Cavity Power Coupler for the European Spallation Source (ESS)
News from TBTS International Workshop on Future Linear Colliders,
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
Injectors BLM system: PS Ring installation at EYETS
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Test plan of ESS HB elliptical cavity
Recent high-gradient testing results from the CLIC XBoxes
LLRF and Beam-based Longitudinal Feedback Readiness
Electric Field Amplitude (MV/m)
CEPC RF Power Sources System
BESIII EMC electronics
RF Local Protection System
FAIR pLinac RFQ Meeting pLinac RF Power Sources
CLIC Feasibility Demonstration at CTF3
RF introduction Anders Sunesson RF group leader
Presentation transcript:

3 GHz and 30 GHz Conditioning Programs by Dubrovskiy Alexey “If there is just one possible action a program should take it.” 5/6/2019 by Dubrovskiy Alexey

Contents Overview of the 3 GHz Conditioning The principle schema of the programs The 3 GHz Conditioning Application The 30 GHz Conditioning Application Logging The End

Overview of the 3 GHz Conditioning

Overview of the 3 GHz Conditioning Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier

Overview of the 3 GHz Conditioning Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier Status and Mode

Overview of the 3 GHz Conditioning Checking peaks of transmitted power Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier Drv. Ampl. Value PFN Klystron Transmitted Power Driver amplifier power approximation Klystron transmitted power approximation amplVal – Driver Amplifier Value, amplW – Expected Transmitted Driver Amplifier Peak Power, tranW – Expected Transmitted Klystron Peak Power, maxW – Maximum Transmitted Driver Amplifier Power, PFN – Klystron PFN. a1,k1,k2,k3,a4,k4 - fitted parameters through the L-BFGS method

Overview of the 3 GHz Conditioning Checking peaks of transmitted power Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier One Section Incident Power Klystron Transmitted Power Transmitted Power One Section Incident Power ≈ Klystron Transmitted Power / 2 * Cavity Coefficient One Section Transmitted Power ≈ One Section Incident Power Cavity Coefficient = 1 (if the conditioning without cavity) Cavity Coefficient ≈ 1,8 (with cavity)

Overview of the 3 GHz Conditioning Checks of transmitted power shapes Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier With compressor Without compressor Normal Pulse Big variation Short length Anormal Pulse

Overview of the 3 GHz Conditioning Checking peaks of reflected power Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier Reflected power ranges: Normal Waiting Reduce the klystron incident power

Overview of the 3 GHz Conditioning Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier Up to 8 vacuum channels Vacuum level ranges: Normal Waiting Reduce the klystron incident power

Overview of the 3 GHz Conditioning Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier Timing inhibit interlock

Overview of the 3 GHz Conditioning Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier

Overview of the 3 GHz Conditioning Checks: Klystron Anomalous forward power Reflected power Vacuum levels Timing inhibit interlock Vacuum pumps Control: PFN Driver Amplifier

Overview of the 30 GHz Conditioning PETS TANK ATTENUATOR LOAD ACCELERATING STRUCTURE TANK Vacuum gauge GUN CTF3 CTF2 Faraday Cup (FC) BPM Reflected power Incident power Transmitted power

Overview of the 30 GHz Conditioning Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length PETS TANK ATTENUATOR LOAD ACCELERATING STRUCTURE TANK Vacuum gauge GUN CTF3 CTF2 FC BPM Reflected power Incident power Transmitted power

Overview of the 30 GHz Conditioning Status / Mode Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length PETS TANK ATTENUATOR LOAD ACCELERATING STRUCTURE TANK Vacuum gauge CTF3 CTF2 FC BPM Reflected power Incident power Transmitted power GUN

Overview of the 30 GHz Conditioning Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length PETS TANK ATTENUATOR LOAD ACCELERATING STRUCTURE TANK Vacuum gauge GUN CTF3 CTF2 FC BPM Reflected power Incident power Transmitted power

Overview of the 30 GHz Conditioning Powers and Signals Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length

Overview of the 30 GHz Conditioning Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length PETS TANK ATTENUATOR LOAD ACCELERATING STRUCTURE TANK Vacuum gauge GUN CTF3 CTF2 FC BPM Reflected power Incident power Transmitted power

Overview of the 30 GHz Conditioning Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length PETS TANK ATTENUATOR LOAD ACCELERATING STRUCTURE TANK Vacuum gauge GUN CTF3 CTF2 FC BPM Reflected power Incident power Transmitted power

Overview of the 30 GHz Conditioning Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length The Gun should be switched off, when: Missing energy Reflected energy FC GUN OFF The Gun should be switched on, when: Vacuum levels are OK Status of the gun inhibiter is OK If there was a breakdown, after changing pulse length and attenuator position GUN ON

Overview of the 30 GHz Conditioning BREAKDOWN!!! Attenuator position Pulse length 1 2 3 4 Checks: Gun Missing energy Reflected energy FC signal Vacuums Gun inhibiter Control: Attenuator Pulse length Wait 3 sec Attenuator position -50% Pulse length -20% Switch ON the Gun Switch OFF the Gun GUI

Overview of the 30 GHz Conditioning Interlock settings

The principle schema of the programs FAST OPERATION SLOW OPERATION GUI LOGGING ACQUISITION PULSE SUMMARY FAST CONTROL MACHINE STATUS MACHINE CONTROL STORING DATA READING DATA SETTINGS ACQUISITION DATA

The 3 GHz Conditioning Application MAKE CONNECTION STAND-BY SET MODULATOR RAISE POWER MAXIMUM POWER END OFF ON CHECK VACUUM CHECK POWERS CONTROL DRIVER STATUS FAST OPERATION SLOW OPERATION GUI LOGGING VME JAVA

The 30 GHz Conditioning Application Pulse length Stepping motor ON CHECK GUN CHECK POWERS CHECK VACUUM CHECK GUN-INHIBIT EVENT NO YES INC. PULSE LENGTH INC. STEPPING MOTOR INTERLOCK GUN OFF DEC. PULSE LENGTH DEC. STEPPING MOTOR RESET GUN-INHIBITOR GUN ON STORE PULSE DATA FAST OPERATION SLOW OPERATION GUI LOGGING CRATE JAVA Powers

Logging GUI Logging System FESA Equipment Hard Driver Property Storing System Property Property Memory Reading System Property Property Future Property Timber GUI Compute

Logging for 3 GHz Conditioning Logging data for an action: Driver amplifier value Power shapes, peaks and statuses Vacuum levels Pulse length Conditioning status

Logging for 30 GHz Conditioning Logging data: All settings Powers and signals shapes and vacuum levels, if there is an event Interlocks Pulse summery Conditioning acquisition

Thank you for your attention The End XXX Thank you for your attention