Incoming inspection of the cavities at saclay

Slides:



Advertisements
Similar presentations
Hot Rod TM bleeder cleaner Inspection, Maintenance and Operating Procedures.
Advertisements

Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
The ESS Linear Accelerator
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Experience for vacuum plants during XFEL cavity production at companies and at LASA Paolo Michelato TTC Topical Workshop on SRF Cryomodule Clean Room Assembly,
LASA status for medium-beta cavity Paolo Michelato.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Quality Plan Documentation Management & Non Conformities ESS PDR, INFN-LASA, 19 May 2016Laura Monaco, INFN LASA.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Visit to Saclay – XFEL Village
Status of the M-ECCTD F. Peauger - P. Bosland
Cryomodule test stand at ESS site
WP5 Elliptical cavities
Medium beta cryomodule demonstrator M-ECCTD
1.3-GHz Cavity Vacuum Furnace at IB4
DESY Experiences on Use of Gas overlay during Assemblies
Documentation (XFEL Naming convention, uploading…)
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Definition of work flow for string DESY Example on critical operation
S1-G Webex meeting Global Design Effort
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Replacement of coupler and recovery of cavity for BEPCII
XFEL Tuner system non-conformities Detected At saclay
Job Performance Requirement 7-11
ESS – RF checks up to cavity operation readiness in tunnel
WP 3 coordination meeting Saclay May 2008
XFEL cavities and cryomodules measurements at AMTF
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
UITF beamline installation
Cryomodule Observations and Status
Teleconference ACS – FREIA 20th February 2018
RF test results of SRF cavity evacuated with NEG pump
Retreatment of Superconducting Cavities for the European XFEL
SRF Frequency data flow (focus on elliptical)
A. Bignami on behalf of LASA SRF Group
Prototype cryomodule development
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
System tests at CEA O. Piquet 19/03/2019
UITF beamline installation
SNS Coupler Shipping Plans
CEA: Status of CEA Activities on the SRF cavities and cryomodules
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.
High level ESS SRF test plan
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

Incoming inspection of the cavities at saclay Christelle Cloué 2017-11-07/08 : 7th SRF Collaboration Meeting @ CEA

Documents delivered with the cavity Outgoing inspection report – inspection of the cavity after test operations, before shipment to Saclay (see LASA Outgoing inspection report) Mechanical report for cavity alignment (discussions in progress with LASA) template_Mbeta_dim_data_export_v3.xlsx RF reports (reference measurements under vacuum and at atmospheric pressure) – format file to be defined (XFEL templates to be adapted .txt, .xlsx) Vacuum and RGA reports according to the requirements of the Interface Document NCR related to interfaces for string assembly or to possible consequence on the cavity performances 2017-11-07/08 : 7th SRF Collaboration Meeting @ CEA

Operations after the cavity delivery Operations carried out on the cavity at the delivery in Saclay Outside the clean room Incoming inspection RF measurements, cavity under vacuum Inside the clean room Leak check RF measurements, cavity at atmospheric pressure without clamps (TBC) 2017-11-07/08 : 7th SRF Collaboration Meeting @ CEA

Incoming inspection Documentation check External inspection of the box Inspection of the outside of the box and the fasteners / lock clips for obvious mechanical damages, e.g. cracks, dents or scratches Internal inspection of the box Shock loggers status and readout Check if there are any obvious damages or irregularities Cavity visual inspection Inspection of the outside of the cavity for physical damage, presence of external contamination Check the cavity from mechanical point of view, if there are any irregularities according to the specifications (interface drawings) Example : the length of the rods on the cavity flanges, the presence of a blind flange on the angle valve 2017-11-07/08 : 7th SRF Collaboration Meeting @ CEA

RF measurements outside the clean room RF measurements, cavity under vacuum Measurement of the cavity fundamental mode spectra, and transmission mode and Q of the fundamental mode Comparison with the measurements performed before delivery Need of a database for the files download and upload RF test bench at CEA 2017-11-07/08 : 7th SRF Collaboration Meeting @ CEA

Tests inside the clean ROOM Leak check (vacuum pressure, background, leak rate) RF measurement, cavity at atmospheric pressure without clamps (TBC) Measurement of the cavity fundamental mode spectra, and transmission mode and Q of the fundamental mode 2017-11-07/08 : 7th SRF Collaboration Meeting @ CEA