Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration

Slides:



Advertisements
Similar presentations
City of Hubbard Transportation System Plan Update April 25, 2012.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Project Background and Objectives
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
VILLAGE OF NORTH SYRACUSE VILLAGE CENTER STREETSCAPE PLAN 2014 Prepared by: CHA Consulting Inc.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Contact: Beth Morris
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Midtown Alliance Capital Improvements Program
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Land Use Study for the Community of Winchester May 21, 2012.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Land Use Study for the Community of Winchester July 9, 2012.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
City of Auburn Streetscape: A Complete Street Presented by: Ed Armstrong, RLA.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
LITTLE BOHEMIA NEIGHBORHOOD ASSOCIATION 35E Bike Path Enhancement CIB Proposal.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Complete Streets Training
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Comprehensive Thinking and Planning
Parking Lot Design Civil Engineering and Architecture
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Complete Streets Training Module 4b – Designing for All Users.
Rock Creek East II Livability Study
SMART URBAN FUTURES PRESENTATION
Urban Street Design Standards Overview of Project and Details
32 Transportation Midway City 2016 General Plan
The I-465 West Leg Reconstruction Project
Parking Lot Design.
Marina Vista Streetscape Project
Project Management Team Meeting #3
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
District 3 Complete Streets Projects
Nolanville Main Street Sidewalk & Bicycle Connectivity
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Parking Lot Design Civil Engineering and Architecture
SMART URBAN FUTURES PRESENTATION
SE 12th Street Roadway Improvements February 8, 2005.
Accessible shared streets
Emily Guenther Zach Olson Laura Scott Cameron Wein
Design Criteria CTC 440.
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Presentation transcript:

Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration Public Meeting #2 Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration Geneva Downtown Revitalization Initiative April 9, 2019

Project Objectives Overview Improve Connection Between Downtown Geneva & the Lakefront Create Accessible and Inclusive Public Spaces within the Downtown Core Incorporate Additional Active Transportation Facilities Integrate Environmentally Conscious Designs Enhance Visual Elements to Show Local Identity Precedent plans, public engagement, the inventory and analysis, and the traffic studies Led to the preliminary designs Support and embrace these five project-specific objectives that were developed from the original DRI objectives   Improve Connection Between Downtown Geneva & the Lakefront for all user groups  such as pedestrians, vehicles, bicycles Create Accessible and Inclusive Public Spaces within the Downtown Core  flexible spaces with a variety of seating and site furnishing options Incorporate Additional Active Transportation Facilities  bike lanes, shared lane markings, shared use pathways, accessible sidewalks Integrate Environmentally Conscious Designs  stormwater management through GI and enhanced urban forestry and ecology Enhance Visual Elements to Show Local Identity  through a materials pallet and public art elements Big picture overview and key takeaways Open house  more detailed descriptions and review of these designs Maintain acceptable vehicular level of service while improving pedestrian and bicycle infrastructure One thing to note, we are looking at pre-emptive traffic signals for emergency vehicles

Routes 5 & 20 Limits of the corridor Includes three intersections for improvements Main design elements of this corridor include lane reduction, traffic calming measures, complete street design and green infrastructure

Routes 5 & 20 Preliminary Designs Lane Reduction Pavement Improvements Traffic Signals Crosswalk Improvements Bicycle Infrastructure Improvements Medians & Landscaped Areas Add Alternates Location of the improvements Remainder on display following the presentation   Lane reduction with auxiliary turning lanes at the intersections Pavement improvements through milling and resurfacing Traffic signal replacements and updates (Lake and Castle), new traffic signal installation at Elizabeth Blackwell Crosswalk improvements through high visibility pavement markings and shortening of crossing distance Bicycle infrastructure improvements, including  Bicycle detection systems at intersections –to aid with traffic signal changes  Cycle track and sidewalk installation on west side –10’ wide, two-way, mostly separated from vehicular traffic  Increased shoulder widths on outside lanes – allow space for on-road cyclists Construction of medians and landscaped areas for separation, improved aesthetics, and enhanced biodiversity  Creating sustainable landscapes Add Alternates Rehabilitation of the existing shared-use path on the east side – shared use facilities on both sides of 5&20 Continuation of the sidewalk on the bridge over route 14 as you head south

Routes 5 & 20 Preliminary Designs Cross section that depicts these same practices Identify lake side and downtown side Identify existing curb vs proposed conditions

Downtown Streetscapes Limits of corridors Intersection improvements at Exchange and Castle, and the 5-point intersection More Walkable and Connected, enhance Urban Ecology, improve Safety & Accessibility, and incorporate Complete Street design so we can design streets for all user groups Downtown Streetscapes

Downtown Streetscapes: E. Castle St. Location Three DRI designated projects – center of urban revitalization   One-way conversion to create a welcoming plaza into downtown – these modifications help warrant a need for the new signal at Elizabeth Blackwell Stormwater management through green infrastructure – integrated into the design Back-in angled parking – improved safety for vehicles and bicycles – based on both the accident history we are seeing on Castle and Exchange as well as the preferred on-street parking for bicyclists for shared-use lanes – we also saw support for this at the first public meeting Flexible public gathering spaces One-way Conversion Flexible Pedestrian Spaces Stormwater Management Site Furnishings Back-in Angled Parking Public Art

Downtown Streetscapes: E. Castle St. Multi-use seat walls and other site furnishings that can function dually as public art components Start to see how these elements interact with each other and enhance the pedestrian character and environment View on south side of Castle looking towards the Lake – existing photo Pavement allotment

Downtown Streetscapes: Castle St. Lane Reconfiguration Back-in Angled Parking Crosswalk Improvements Stormwater Management Flexible Pedestrian Spaces Site Furnishings Bicycle Infrastructure Public Art Location Lane reconfiguration  Removal of both the center hatched medians and designated turning lanes at intersections  From an intersection capacity standpoint these turn lanes are not needed and the current use for the hatched areas is for loading which is a potentially unsafe use  Moved the loading zones out to the curb line Back-in angled parking and increased amount of ADA spaces Crosswalk improvements through high visibility pavement markings - mid-block crossing – enlargement Curb bumpouts which also provide traffic calming and stormwater management 8’ min existing pedestrian sidewalk – main concourse for movement Stormwater management through GI – use of bioretention areas, continuous tree trenches, and porous materials Flexible pedestrian gathering spaces Site Furnishings - use of multi-use seat walls, benches, moveable café style tables, and trash and recycling receptacles Bicycle infrastructure – shared lane markings, signage, and a variety of bike parking facilities Public art components

Downtown Streetscapes: Castle St. Cross section depicts these same practices - identify depths of materials - interact with utilities to avoid conflicts Outside of curb vs inside

Downtown Streetscapes: Castle St. View location How storm water management is being integrated into the streetscape design character Mix of standard hardscape, landscaped areas and bioretention areas  capture and harvest rain water runoff and snow melt. They allow the water to filter through the plants and soil media and infiltrate back into the groundwater systems instead of going into a standard closed drainage network

Downtown Streetscapes: Exchange St. Lane Reconfiguration Back-in Angled Parking Crosswalk Improvements Stormwater Management Flexible Pedestrian Spaces Site Furnishings Bicycle Infrastructure Public Art Truck Traffic Signage Next corridor is Exchange Street from Castle Street to the RR Tracks Similar elements as Castle St   Lane reconfiguration Back-in angled parking, parallel parking and loading zones along the curb Crosswalk improvements through high visibility pavement parkings Enhancements to existing mid-block crossing – reduction in crossing distance through Curb bumpouts which also provide traffic calming and stormwater management 8’ min existing pedestrian sidewalk – main concourse for movement Stormwater management through green infrastructure Flexible pedestrian gathering spaces – variety of Site Furnishings Bicycle infrastructure – shared lane markings, signage and a variety of bike parking facilities Public art We are also looking at ways to deter tractor trailer traffic through the downtown streets - there is a ban within the City code currently but there is limited signage to reinforce that so we are looking at options

Downtown Streetscapes: Exchange St. Cross section that depicts these same practices and starts to identify depths of materials and how they interact with utilities to avoid conflicts

Downtown Streetscapes: 5 Points Lane Reconfiguration Crosswalk Improvements Traffic Signal Improvements Stormwater Management Parking Improvements Site Furnishings Public Art Final improvement area is the 5-Points intersection   Lane reconfiguration - traffic analysis supported the removal of turn lanes that were underutilized - to improve sight lines Crosswalk improvement through high visibility pavement markings Curb bumpouts for traffic calming, reduced crossing distances Leading pedestrian intervals – part of the traffic signal system - allow pedestrians to enter the crosswalk prior to allowing vehicular turning movements – head start to be more visible Stromwater management areas through green infrastructure and landscaped areas Parking improvements - removal of parking on s side of Castle Street to reduce the amount of mid-block crossings  Future parking that is planned with the library expansion Site furnishings including benches and moveable café style tables As well as this wayfinding pavement marking graphic that expands on the public art component To Zach