Status Vacuum Control-Command for AdV

Slides:



Advertisements
Similar presentations
Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
Advertisements

1 Broadcaster Relocation Fund Workshop Expanded Presentation June 25, 2012 Presented by: Jay Adrick, Vice President Broadcast Technology.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting University of Leicester, 24/09/2009.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
Equipment for VRI zone control – up to 5400 management areas Valley PRO2 + Valley VRI.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
PLC NANO MANAGING SAFETY FUNCTIONS acting on electrical power for MEY/NA Experiments/Barracks.
Keep all food and drinks away from computer and equipment Liquid may spill and cause an electrical shock or the computer not to operate properly.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Vacuum Control System AdV architecture similar to the existing one one autonomous station per “pumping unit” (about 30 units : tower, tube station, cryopumps.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Manual Density Business Today
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
Putting Together a Modular PLC
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
21/5/2007Thomas S. Bauer - Nikhef1 Input Mode Cleaner Update LIGO-G Z.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
 Today's vehicles are much more complex and complicated than the cars of the 1960s, '70s, '80s, incorporating more computer electronics, silicon chips,
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
SF6 contamination by air in the Pelletron Recycler Departmental Meeting November 5, 2008 A. Shemyakin.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
COMPUTER SAFETY AND CARE
HMS Status Steven Lassiter Jan 20, 2017.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
CTIO Weather Station renewal
Next steps toward the beam test
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
CTIO Weather Station renewal
Teleconference ACS – FREIA 10th May 2017
Cryo PLC issues [May 2011]: CASES
Status of Virgo GWDAW Dec 13-16
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
Summary of Fuse Testing for Barrel Module Fuse Boxes
Cryogenic C&C Scope of work
Important Things You Should Know While Installing Smoke Detectors 5
Know Your Basic Car Care
SC1R Cold Box PDR Controls
TEST PLANS for HL LHC IT STRING
MAIN 222 Industrial Controllers
Mark Barton f2f Meeting 2/22/16
Mark Barton f2f Meeting 2/22/16
Magnet PS Controls Hardware Status
Example of A* A (4,0) 4 OPEN: (A4) CLOSED: ().
 What is Topology  Categories of Topology  Definition, structure, advantage and disadvantage of all of the following topologies: o Mesh o Bus o Ring.
RPC Detector Control System: towards the final system
COMPUTER SAFETY AND CARE
Summary India Rural 5G Challenges:
Periodical meeting about the 'control system ‘
Status and Prospects of Tracker Services Hans Postema (CERN)
DOE Review 11 May 2005 Stephen A. Lewis
STUB configuration Mats Pålsson
DOE Review 7-9 February, 2006 Steve Lewis
Aziz AMAMOU EACM – 21th May 2019
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

Status Vacuum Control-Command for AdV Summary of February 22-23 visit Decabling/Recabling between racks and vacuum devices represent a huge work Some cables are already used at their maximum length displacement of racks will require new intermediate boxes Aging of tube racks due to difficult conditions: temperature, humidity, dust Tube racks probably too small for PLCs tube racks have to be completely rethought

Hardware Evolution from Virgo to AdV We started to think how to integrate new devices in existing or new racks In any case, increase of 50% in the numbers of racks and boxes VIRGO AdVIRGO TOTAL RACKS : 33 TOTAL BOXES : 29 TOTAL RACKS : 48 TOTAL BOXES : 51

Hardware Evolution from Virgo to AdV Study of cabling for all racks Even in the simplest case (WE and NE), at least 1/3 of the existing cabling has to be removed and replaced Upgrade of existing towers is a huge job, larger than expected (it is almost doing a new station) Adding the 50% increase of number of stations leads to a very difficult situation Careful estimation of manpower and planning is ongoing (rather years than months) Current cost estimation seems to be a lower bound Additional support is mandatory

PLC Tests Schneider and Beckhoff successfully tested on several controllers Displacement of PLCs in the workshop hut close to pumping station in May New controllers coming with pumping station have to be tested in May Study for the connection between PLCs and pumping station just started