Minimum requirements regarding contingency plans and their creation

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Vegetative Risk Management Plan Template Details for Development by Section.
Transition from Q1- 8th to Q1- 9th edition
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Reliability of the electrical service Business Continuity Management Business Impact Analysis (BIA) Critical ITC Services Minimum Business Continuity Objective.
CHAPTER 8 PLANNING FOR IT SYSTEMS Knowing Where You‘re Going.
ISO 9001 : 2000.
Failure Mode and Effect Analysis
2–12–1. 2–22–2 Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SWE Introduction to Software Engineering
ISO 9001 Interpretation : Exclusions
WHY IT SYSTEMS PLANNING? IT SYSTEMS PLANNING... l provides a systematic process for finding new IT systems. l generates a comprehensive list of new IT.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
Continual Improvement Ensuring the EMS is Effective! Internal Auditing, Corrective Actions & Management Review.
Welcome to… Planning for Emergencies – For Small Business –
Purchasing.
Care Home Forum 19 th May 2015 Sarah Chittock – Merton Civil Contingencies Officer Taryn Milton – Emergency Planning Manager – Epsom St. Helier.
Qantas Brand Refresh Kristy Dixon – Masters of Applied Project Management University of Adelaide 2013 Results of Risk Analysis Plan Hypothetical Project.
Basics of OHSAS Occupational Health & Safety Management System
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
STRATEGY Chapter Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
a guidance to conversion
1 Chapter Nine Conducting the IT Audit Lecture Outline Audit Standards IT Audit Life Cycle Four Main Types of IT Audits Using COBIT to Perform an Audit.
Risk management and disaster preparedness
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 9 Slide 1 Critical Systems Specification 1.
Manufacturing Plant maintenance Materials management Quality management.
The common structure and ISO 9001:2015 additions
2.8 Crisis Management and Contigency Planning Chapter 17.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Operations & Logistics Management Lesson 7- Process Design & Lesson 8- Capacity & Buffering Operations.
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Homework 1- Gateway.
Community Health Centers of Arkansas Hazard Vulnerability Assessment Workshop August 11, 2017 Mark Fuller.
Utilizing Your Business Continuity Plan.
Understanding The Cloud
Disaster and Emergency Management
COMM02 Project Monitoring and Control Unit 8
Strategy Chapter Two McGraw-Hill/Irwin
The Broad Problem Area and Defining the Problem Statement
Intracompany Stock Transfer Scenario Overview
Chapter 16 Supplement Maintenance.
15S Maintenance.
FMEA PROCESS FLOW Causes/ failure mechanisms Product definition
CASE STUDY BY: JESSICA PATRON.
2.8 Crisis Management and Contigency Planning
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
Intracompany Stock Transfer Scenario Overview
Industrial Purchasing System A method used by businesses to buy products and/or services. A purchasing system manages the entire acquisition process, from.
Quality Management Systems – Requirements
Cornerstones of Managerial Accounting, 5e
GE 6757 TOTAL QUALITY MANAGEMENT
CHAPTER 14- PERFORMANCE MEASUREMENT ALONG THE SUPPLY CHAIN
Intracompany Stock Transfer Scenario Overview
Latitude The lines on a map that run east to west but are measured north to south.
Project Management Process Groups
RISK REDUCTION PROCESS
National Food Service Management Institute
STRUCTURE OF THE PRESENTATION
Guideline Minimum requirements regarding
Failure Mode and Effect Analysis
COMPANY NAME Business Continuity Plan Date Presented by.
Define Your IT Strategy
Disaster Preparedness
and Process Improvement Operational Excellence The Future?:
UGRC 144 Science and Technology in Our Lives/Geohazards
Information system analysis and design
Presentation transcript:

Minimum requirements regarding contingency plans and their creation Guideline Minimum requirements regarding contingency plans and their creation Neuss, December 2006 Roger Hans

Guideline Minimum requirements regarding contingency plans and their creation 1. Introduction I The standard ISO TS 16949 requires in chapter 6.3.2 for events like Power supply interruptions Manpower shortages Failure of important operating means Field complaints contingency plans so as to be able to fulfill the requirements of the customer also in such cases.

1. Introduction II Basically a difference needs to be made between Guideline Minimum requirements regarding contingency plans and their creation 1. Introduction II Basically a difference needs to be made between contingency plans demanded by the authorities contingency plans demanded by the ISO TS 16949 In the first case the objective chiefly focuses on limiting damage to Man Environment Infrastructure In the second case the objective chiefly focuses on fulfilling our delivery commitments with regard to our customers.

2. Target of this guideline Minimum requirements regarding contingency plans and their creation 2. Target of this guideline Supplying our customers with products on schedule is one of the foremost targets of all plants belonging to xxxxx. In order to put us in a position where we can fulfill our delivery commitments also in contingencies, each plant must create a contingency plan in line with this guideline

3. Contingency in the sense of this guideline Minimum requirements regarding contingency plans and their creation 3. Contingency in the sense of this guideline A contingency in the sense of this guideline will be present when the following production factors are available only on a limited basis or not at all Machines & tools Plants Buildings Transportation means Telephone Electronic data-processing / network Purchased production materials Electric power Water Gas Fuel oil and other combustibles Manpower Field complaints (recalls) will result in increased delivery commitments and must, in the sense of this guideline, be also treated as a contingency.

4. Responsibilities The plant manager is responsible as to presence, Guideline Minimum requirements regarding contingency plans and their creation 4. Responsibilities The plant manager is responsible as to presence, maintaining and operating of the contingency plan. The contingency plan needs to be verified and validated by the plant manager through suitable measures (if required, dummy runs).

5. Approach & risk assessment Guideline Minimum requirements regarding contingency plans and their creation 5. Approach & risk assessment Approach For every event which potentially can result in a contingency in the sense of this guideline, a risk assessment needs to be run first. Risk assessment The risk assessment is run - preferably using Excel - corresponding the following schematic: Event (5.1) Assessment (5.2) Production factor (5.4) Consequences (5.3) Significance (5.5) Action (5.6) Responsibility (5.7) Time need (5.8) Risk priority number (5.9)

Guideline Minimum requirements regarding contingency plans and their creation 5.1 Events Events are such processes which potentially result in the contingency in the sense of this guideline. Such events can be, for example Acts of god like Lightning strike Hail Storms Snowstorms Sandstorms Hurricanes Tornadoes Storm tides Earthquakes … Epidemics Flu Pestilence … Others Acts of terrorism Acts of war Strikes Accidents Plane crashes … This list is to be taken as an example and by no means it claims to be complete! Lightning

Guideline Minimum requirements regarding contingency plans and their creation 5.2 Assessment The assessment of one and the same event is dependent on the geographic location of a plant, the political conditions prevailing there and other factors, and may for this reason differ widely from plant to plant! The assessment in each case relates to a single event. The assessment is performed as follows: 1 = unlikely 1 is assigned to events which based on experience cannot occur, or to date have not occurred. 3 = possible 3 is assigned to events which based on experience have already occurred or which occur from time to time, for example lightning strikes, flu epidemics or strikes. 5 = very likely 5 is assigned to events which based on experience have in the past occurred already several times or which occur regurarly. Lightning 3

Guideline Minimum requirements regarding contingency plans and their creation 5.3 Production factor Here the affected production factors in accordance with section 3 are stated: Machines & tools Plants Buildings Transportation means Telephone Electronic data-processing / network Purchased production materials Electric power Water Gas Fuel oil and other combustibles Manpower If necessary production factors could be specified more detailed, e. g. drilling machine No. 4711 Lightning 3 Electric power

Guideline Minimum requirements regarding contingency plans and their creation 5.4 Consequences The consequence of an event results in a contingency in the sense of this guideline, i. e. restricted production factors or unavailability of production factors Lightning 3 Electric power unavailable

Guideline Minimum requirements regarding contingency plans and their creation 5.5 Significance The significance always relates to a consequence and is assessed as follow: 1 = no influence on the quality of the product or the ability to deliver 3 = can have an influence on quality or the ability to deliver 5 = has an influence on quality or the ability to deliver Lightning 3 Electric power unavailable 5

Guideline Minimum requirements regarding contingency plans and their creation 5.6 Action The action relates to the contingency described under “Consequences” and its target at remedying it. The action must be described briefly and precisely, for example “Start up spare compressor” “Start up emergency power supply” “activate supplier xyz for …” Lightning 3 Electric power unavailable 5 Start up

Guideline Minimum requirements regarding contingency plans and their creation 5.7 Responsibility Here the department must be specified which is responsible for introducing the measure for remedying the contingency. Lightning 3 Electric power unavailable 5 Start up maintenance

Guideline Minimum requirements regarding contingency plans and their creation 5.8 Time needed Here the time needed until the measure for remedying the contingency becomes effective must be stated as follows. 1 = less than 2 hours 2 = more than 2, however less than 4 hours 3 = more than 4, however less than 8 hours 4 = more than 8, however less than 16 hours 5 = over 16 hours Lightning 3 Electric power unavailable 5 Start up maintenance 1

5.9 Risk priority number (RPN) Guideline Minimum requirements regarding contingency plans and their creation 5.9 Risk priority number (RPN) The risk priority number is the product of assessment figure, significance figure and time needed, with a minimum of 1 maximum of 125 Lightning 3 Electric power unavailable 5 Start up maintenance 1 15

6. Conclusions Sort the RPN’s in descending order Guideline Minimum requirements regarding contingency plans and their creation 6. Conclusions Sort the RPN’s in descending order define or try to improve the actions for the high RPN issues try to minimize the consequences, e. g. by redundant production factors … The method described in this guideline allows us to evaluate in a demonstrable way any imaginable event. Lightning 3 Electric power unavailable 5 Start up maintenance 1 15