Overview of RbD Risk Modelling 31 March 2008

Slides:



Advertisements
Similar presentations
Seasonal Normal Weather Base
Advertisements

Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
PN UNC Workgroup (AQ topic)
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
DESC Action DE0301 & DE0302 (New Project Nexus Allocation Algorithm) 4th April 2012.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
UNC Modification Proposal 0202 National Grid Distribution
Review of Demand Estimation Times for Modification Proposal 461
Options for Mod 640 Replacement
Weekly Progress Update 3rd Aug 2018
Rebecca Knight Mod 644 UIG Analysis.
Background - Tolerance Rules
Review Group 178 SSP as Domestic only.
PAF Risk Register and PARR mapping
Large Supply Point Reconciliation which spans Pre & Post Go Live
R&N Timeline Release 2 Release 3 Feb-19 June-19
Weekly Progress Update 13 July 2018
CSEPs Reconciliation Proposals
Rolling AQ Review Group 177.
XRN 4695 Supporting Document High Level Plan
Weekly Progress Update 15 June 2018
UIG Task Force Progress Report
Modification 0117 – Additional Considerations
Project Nexus Workgroup
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
DN OAD Processes: RG 0316 : Offtake Workstream
XRN4790 – Introduction of winter read/consumption reports
Mod 0621 Amendments to Gas Transmission Charging Regime
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
AUG Query Responses 21st November 2013.
Project Nexus Workgroup
Modification proposal 330
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Denis Aitchison/Rob Hetherington
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
PN UNC AMR Topic Workgroup
Demand Estimation Impacts
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
MP0131: Meter Error Notifications
Possible Alternative to use of SND in Demand Estimation
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Project Nexus Workgroup
AQ Review System Calculation Overview
Development Work Group 0209 Straw Man Update
Nexus Workgroup Read Validation Scenarios
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Reads.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Development Work Group 194
Customer Issue Management CoMC Update for June 2019
Enabling Large Scale Utilisation of Class 3
Xoserve Draft UIG Incentives Modifications 20 May 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Overview of RbD Risk Modelling 31 March 2008 Review Group 177 Overview of RbD Risk Modelling 31 March 2008

RbD Risk Modelling – Background Purpose Risk Modelling supported the introduction of RbD (Reconciliation by Difference) in 1998 Designed to be one of the operational “monitors” of RbD How Defined “Risk” as the difference between actual gas bills and those estimated by RbD Estimated month on month variability of RbD Charges based on assessment of inherent risk factors Periodic updates were shared with the RbD Sub-Group

Risk Model - Results Risk Model showed that RbD was less variable than Meter Point Reconciliation Base model showed variability of +/- 1.3% of allocation Indicated variation with errors/timing differences included: +/- 2.5% Predicted variation increased/decreased between updates Actual variation can be up to 5% of allocation Last update provided 2002 Risk Model superseded by RbD Feeder Model and RbD Forecasting

Variability of SOQs 31 March 2008 Review Group 177 Variability of SOQs 31 March 2008

Variability of SOQs SOQ = AQ PLF * 365 PLF = Peak Load Factor Measure of peakiness of annual demand in an EUC – what proportion of AQ would be used on a 1 in 20 peak day Set each year for each EUC as part of NDM Capacity Algorithms Determination of PLF EUCs 1 to 4: determined directly from the NDM Modelling – extrapolating modelled demand to the 78 year 1 in 20 CWV EUCs 5 to 9: determined from the NDM Modelling using a Weather Correction Factor derived from the DNs forecast 1 in 20 Peak

Variability of PLFs Gas Year 05 to 06 “B” band EUCs only – excludes WAR bands

Variability of PLFs Gas Year 06 to 07 “B” band EUCs only – excludes WAR bands

Variability of PLFs 2006/07 to 2007/08 WAR Band variability Gas year 05 to 06 – 100% of WAR Band PLFs changes in range -3% to +3% Gas year 06 to 07 – 96% of WAR Band PLFs changes in range -3% to +3%

SOQ Amendment Options PLFs are available by end of August (latest) for coming Gas Year, following industry consultation Under rolling AQ rules, AQ may have recently updated Options for NDM SOQs: Restate all SOQs on 1 October, regardless of recent AQ changes Leave SOQ unchanged, will update at next AQ change Update SOQs based on read frequency – only amend Annually Read sites – Monthly Read will get reads and update soon Update SOQs based on read history – if reads are frequent and AQ updates regularly, don’t update SOQ Considerations: Shipper comparability, differing read performance, Transportation revenue/costs, system processing, system capacity requirements