Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder 400 163 208.

Slides:



Advertisements
Similar presentations
nationalheirloombuildings.com National Heirloom Buildings Of Steel Welcome to the National Heirloom Buildings Of Steel Construction Process.
Advertisements

Buildings and Structures 1
Dr. Ruth Collins TrinityHaus
CONSTRUCTION AND STRUCTURES – II MAJOR PROJECT
Abcdabcd Low Rise Buildings The Built Environment in which we live is composed of:- Buildings Travel systems Services Disposal & Treatment Systems. The.
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
Portal Framed Construction
MAJOR PROJECT: warehouse/office
Erection of steel portal frame for warehouse Construction
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
Timber Framed Structures
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
Structural System Overview
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
S R T C O N S T R U C T I O N & S T R U C T U R E S M A J O R A S S I G N M E N T M A T T H E W S Q U I R E
Roofing.
[[Click on topic to view page]]
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
SRT25 - Construction and Structures Major Assignment Architect CONTENTS Title page Brief Development - InspirationInspiration - Portal FramePortal Frame.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
CONSTRUCTION & STRUCTURES 2 MAJOR PROJECT WAREHOUSE & OFFICE COMPLEX SCENARIO Isabella Czerniakowski.
Fire Behaviour Elements of Structure and Fire Development.
Kevin de almeida construction & structure srt 259 office showroom/ware house major project.
Chapter 20 Roof Plan Components.
Construction and structures srt 251 major assignment louise milton student number:
SRT251 Comstruction and Structures 2 Major Project Warehouse and Office Complex Scenario Yan Loi (Rex) Wong ID:
Reinforced Concrete VS Steel
Rectangular framed structures
Beam and Slab. Site cast that is cast into forms on site. Typically used for storage facilities, and libraries because it can withstands heavy loads with.
PRE-FABRICATED STRUCTURES
LOGO. Contents About us Why Build with Steel? Building systems Samples Quotation.
Major Assignment Construction & Structures SRT251 Lecturer: J.J. Ham Kylie Dalton
Prefabricated Timber Frame Construction
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
Fire and Emergency Services Company Officer — Lesson 17 Fire and Emergency Services Company Officer, 4 th Edition Chapter 17 — Preincident Planning.
1 Lincolnshire Fire and Rescue’s Training Centre LINCOLNSHIRE FIRE & RESCUE BUILDINGS AND STRUCTURES 1 Building Types and Components.
Wall and Ceiling Construction
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Competency: Draw exterior elevations
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Lecture 2 Structural System Overview CVEN Structural Concrete Design January 15, 2003.
Cross Wall Construction
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Learning Outcome Lesson Objective
Framed Buildings Plane Frames Space Frames Skeleton Frames.
The Benefits of using Steel Purlins and Steel Framing for Construction Purposes.
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
Pitched Roof By PATEL ANKITKUMAR H.
Structural Slab Analysis
Prefabricated Timber Frame Construction
BUILDING TECHNOLOGY IN CONSTRUCTION
Why Know Building Construction
ANALYSIS AND DESIGN OF A PRE ENGINEERED BUILDING
Carl James Type of building use
Roofs: Types of roofs, Trussed roofs, Steel roof truss
Facade Panes Dealers in UAE
Pre-Contract Cost Control
Competency: Draw exterior elevations
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Value of contract: Length of contract: Contract start date:
Building Construction
Mitre III Building McLean VA Debra Schroeder Structural Option.
Eaton MEDC, Sutton-In-Ashfield
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Presentation transcript:

Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder

Louis Kahn - Research Louis Kahn used predominantly geometric forms, particularly in the openings. Brick and concrete are the main materials in which Kahn worked. Many of his buildings, particularly his most famous are of a large scale and contain an element of Monumentality Roofs appear flat and even hidden.

Proposed Site Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Design Technology Specifications and Capabilities -Roof beam pitch 7 degrees 7 minutes (i.e. 1 in 8) -Span Clear span capabilities are available up to 40m approx. - Bay width 6.0m is a recommended economic spacing of frames. - Eaves height 3.0 to 13.0 approx - Fire Resistance of 1-4 hours -Cladding is variable from block work to metal sheeting Concast – The G-Frame is a precast concrete structural frame which works similarly to a Steel Portal Frame structure. Longitudinal support is be gained through the use of steel purlins or gurts. All information found at Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

All information found at Concast G-frame Benefits -Larger span capabilities, allowing increased design flexibility. -Competitive pricing -Hygiene - ledges where dust and dirt collects can be minimised, which is ideal for high precision industries (such as pharmaceutical, computer or food processing facilities). -Inbuilt fire ratings avoid additional board or sprayed protection. -Factory production, quality checks prior to arriving on site. -Speed of erection. -Decreased maintenance costs – the frame is virtually maintenance free. -Clean finish. -Overhead gantry cranes – supports for overhead gantries can be provided in columns if requested at design stage.

Construction Sequence Footings Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder Structural System

Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder Purlins and Gurts Roofing

Safety and Drainage Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder Roof coverings

Walls Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Flooring and Windows Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Flashing Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder

Final Product Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder