START OF REVISION OF UR TUNNEL INTEGRATION

Slides:



Advertisements
Similar presentations
Performance Management Plans Workshop 23 rd September 2010.
Advertisements

02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Role of Management and Technical Coordination
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ACSP Report – Review of Open Suggestions Nate Davis.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Information Management System “ Expert Profile Module" Information Management System “ Expert Profile Module" The Expert Profile module is an integrated.
ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Information Management System “Good Practice Module" Information Management System “Good Practice Module" The Good Practice / Success Stories module is.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
DCS and Motors Helen Heath, David Cussans, Magnus Loutit University of Bristol.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Integration Drawing Exchange Solution [IDES] Mar. 2015
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 4 Slide 1 Software Processes.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Information Management System “Project Module" Information Management System “Project Module" The Project module is an integrated part of System. The back.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Chapter 1 Introduction to AutoCAD Civil 3D 2009 Learning Objectives: Understand basic features of AutoCAD Civil 3D Start AutoCAD Civil 3D Understand.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Civil engineering reduction study Stephane Maridor Ref catia smarteam : ST _01.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Update on the PSB Cooling and Ventilation Systems
SMR 21/09/2017 P. Fessia.
Conventional Facilities and Siting Global Group (ARCFS)
HL-LHC IT STRING and Series test of SC link
Heitor Moraes, Marcos Vieira, Italo Cunha, Dorgival Guedes
Equipment simplified model SMR UR safety
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
Software and Systems Engineering Standards Committee Portfolio
Injectors BLM system: PS Ring installation at EYETS
CS 5150 Software Engineering
M. Alcaide Leon, Paolo Fessia
M. Alcaide Leon, Paolo Fessia
NatRisk Project Web Site & Project Management Platform
RR-TAG (802.18) Liaison Report
Project Management Platform
The overall integration. Frozen situation 18/09/2015
Current Status Future Progress Monitoring
Creating a Windows 10 Virtual machine
Superconducting Links and Cold Powering components for HL-LHC
WAWF ECP 696 GAM Training for Activating Users v5.3
WP4 Security Update For WP4: David Groep
Informal document GRE-79-04
RDR Baseline Layouts for Interaction Region
EasyParts Update – IR Parts
Verification Concepts for SysmL v2
Multiply the total number of atoms inside the parentheses by the
Engineering sheet is available on the BA Intranet!
Informal Document GRSP-64-10
Find My Supplier Xoserve has launched a new online version of the M Number helpline This free to use service enables gas consumers to retrieve data online.
Installation of Photon Beam Transport to FEH
Draft Guidelines for application of the Unique Identifier (UI)
WAWF ECP 696 GAM Training for Activating Users v5.3
Find My Supplier Xoserve has launched a new online version of the M Number helpline This free to use service enables gas.
RR-TAG Closing Report Report of September 2008 plenary meeting
Multiply the total number of atoms inside the parentheses by the
from Japan TFCS September 2018
Tic-Tac-Toe Game Engine
DFH devices, under HL LHC WP06a: Design Status
Powering and Safety day Underground access during powering tests
Loading Rack PLC Breakers 10/14/2019.
HL-LHC Quality management
Geodesy Mark Jones EN/SMM-HPA
ECR on pole order of the HL-LHC IT circuit and resulting implications
J. Fleiter, S. C. Hopkins, A. Ballarino
Radiation levels in the service galleries in IP1 and IP5
Presentation transcript:

START OF REVISION OF UR TUNNEL INTEGRATION Stephane Maridor – WP15

AIM : Update, iterate the 3D layout of equipment inside UR tunnel to create new baseline version before end of September. HOW : Study the new concept, add new equipment (asked by user RRF), add improvement -> presentation for discussion, modification, iteration,.., agreement , -> validation (by WP concerned). (we propose to meet each 15 days) -> new baseline

RAPPEL : UR tunnel CIVIL ENGINEERING DIFFERENCE BETWEEN P1 AND P5 ( UR ) P1 P5

RAPPEL : UR tunnel Trench for sclink are defined , we have to deal with. 30 m

Baseline until now !

New version Status : in work ! (taking into account the Rack Requirement Form)

DFH surface allocation + 3 spare pc rack + 1 racks for current lead + racks PLC for switch ? + current lead & switch (CDB )? DFH surface allocation This proposal is not yet discussed (current lead + cdb) 20 m2 new TOP VIEW baseline transformer position modified 21 m2

+ 3 racks for current lead + 1 racks PLC for switch /IP + 1 rack for PC control + current lead & switch (CDB ) DFH surface allocation 15 m2 15 m2 (+ 7x 0.54m2) (+ 2 x 0.54m2) new TOP VIEW baseline Moved to UL14-16 (not yet approved) ECR WP6A ? 30 m2 + 4 m !

DFH surface allocation new 15 m2 15 m2 FRONT VIEW 30 m2 baseline

13KA 18KA 13KA 18KA Possible VARIANTE 13KA Should be more compact

Spare for pc Racks zone new baseline

new baseline

+ 3 racks for current lead + 1 racks PLC for switch /IP DFH surface allocation + 3 racks for current lead + 1 racks PLC for switch /IP + 1 rack for PC control + current lead & switch (CDB ) (+ 2 x 0.54m2) (+ 7x 0.54m2) 15 m2 15 m2 new + 4 m ! baseline 30 m2 Moved to UL14-16 (not yet approved) ECR WP6A ?

DFH surface allocation + 3 spare pc rack + 1 racks for current lead + racks PLC for switch ? + current lead & switch (CDB )? DFH surface allocation This proposal is not yet discussed (current lead + cdb) 20 m2 new baseline

Extra slides

1.6 m transport 1.8 m 1 m 2.7 m

13kA 8 X 2 kA 18kA DFHX 2 DFHX 1

8 X 2 kA 18kA 13kA DFHX 2 DFHX 1

8 X 2 kA DFHX 2

13kA 18kA DFHX 1

8 X 2 kA