Welcome back from holidays! …for a new year of exciting data taking

Slides:



Advertisements
Similar presentations
Front Of The House Functions
Advertisements

Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities.
Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities Intelligent Utilities.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
Integrated degree progress and advice  Course Requirements  Necessary classes for major  Professor reviews/classroom reviews.
Architecture, Deployment Diagrams, Web Modeling Elizabeth Bigelow CS-15499C October 6, 2000.
This is the way an organisation distributes the data across its network. It uses different types of networks to communicate the information across it.
Coincidence group report Analysis meeting, 13/04/20151.
©2007 Napa Valley College This presentation will help you: Collect necessary information Get your computer set up in 10 steps Ensure you are ready to.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
SPEAKING Staying at a hotel.
English 95, Read Right 2 credits per session Welcome to English 95.
A Guide to Your Volunteer Connection Account. Access Volunteer Connection Visit or navigate to Volunteer Connection.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Schneider Electric Automated Lunch and Learn Program Launch November 09, 2015 Presented by: Charlie Matthews, Applied Offer Program Specialist Confidential.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
May 14, 2003The Detector Safety System for LHC Experiments1 Agenda 1) Minutes of last meeting 2) DSS Back End software progress by Giulio Morpurgo 3) DSS.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Extreme Energy Events M. Abbrescia Extreme Energy Events Data taking 20 BILLIONS candidate tracks!
CENTURY 21 ACCOUNTING © 2009 South-Western, Cengage Learning Happy Tuesday!! Check your test grades!! Vocab quiz tomorrow!! Please have all vocab completed.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Turn Your Windows 7 Laptop into a WiFi Hotspot with Connectify Prepared by: Phalhong Mao.
Extreme Energy Events M. Abbrescia Extreme Energy Events Two contributions at recent conferences:  Paola La Rocca: “Operation and performance of the EEE.
Social Studies Grade 7 Mrs. Wisnefsky.
F. Bellini for the DQM core DQM meeting, 04th October 2012
ONBOARDING INFORMATION THROUGH PEOPLE ADMIN/ APPLICANT TRACKING
Update on the new analyzer and more
GGM Integration Stefano Colafranceschi for the Frascati group
Run 3 Statistics EEE Run coordination meeting esteso alle scuole
Extreme Energy Events collaboration
FROM UNIVERSE TO SCHOOLS, THE LONG WAY OF COSMIC RAYS.
A collaborative experience
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Meeting at Erice Great success!
CMS Centres Worldwide CMS Centres Worldwide
Analysis and paper on chamber and telescope performance
News Reconstruction with Analyzer v 2.0 going on
Barrel RPC Conditions Database
Multigap Resistive Plate Chambers for EAS study in the EEE Project
Welcome to CS 1010! Algorithmic Problem Solving.
Welcome to CS 1010! Algorithmic Problem Solving.
& Listing Distribution
Welcome to CS 1010! Algorithmic Problem Solving.
Introduction to Computers Fall 2017
A Guide to Your Volunteer Connection Account
Business Meetings : Purposes
Introduction to Computers Fall 2018
Introduction to Computers SPRING 2019
Talk general structure
ONBOARDING INFORMATION THROUGH PEOPLE ADMIN/ APPLICANT TRACKING
Corporate Lodging Hotel Program Insituform Technologies
Search for coincidences and study of cosmic rays spectrum
Spare Chambers Proposal: send them at INFN Bologna
A better Portal.
Analysis working groups
Search for anomalous EEE
WEBCASTING. WEBCASTING Webcasting Overview To broadcast and monitor LIVE election process from a distant polling station To keep a check on illegal.
Search for anomalous EEE
RUN 5 Fabrizio Coccetti Run Coordinator
Info and news EEE has been contacted by the TRADALBAGAS collaboration
Reporting 101 Keenan & Mona.
Carlton Comprehensive Public High School
Status of DT Local Trigger Commissioning
Welcome to the 33rd rd CATIA FORUM.
EDT Web Portal User Guide
Presentation transcript:

Welcome back from holidays! …for a new year of exciting data taking

News: New indico page! Set up by Fabrizio – many thanks!  You can find it at the following address: http://agenda.centrofermi.it/indico/ Category “EEE meetings” created EEE general meetings at the moment, you can create any kind of meeting you want (analysis, hardware, etc.) You need to sign-up to this new indico All the material presented easily accessible For the moment, we will use the usual vidyo room: http://vidyoportal.cern.ch/flex.html?roomdirect.html&key=yYVPeLNKqCjY

Activities in preparation for Run-3 Run-3 should start during the meeting in Bari: 13-14 October Under local responsibles’ responsability: Bring, wherever possible, distance between chambers at 50 cm When this operation is done, please communicate it Check gas system and gas supply, bring the flux at ≈ 2 l/h Wherever possible, have the two bottles needed for Run-3 Check, and possibly solve, all the problems known and appearing at start-up Noise, difference between trigger rate and reconstructed track rate, … Install the clock distribution card, as soon as available (around beginning of October) It will arrive with instructions and cables

Activities in preparation for Run-3 Under central group responsability: Reconstruct all the data with Analyzer v.2.0 Provide the new DB, new DQM chain and web page see talk by Francesco Noferini today Provide automatic e-log and cancel shifts Fabrizio working on this Under schools’ responsability, but local responsible should inquire about progresses and provide support if needed: Measure the telescope angle wrt. North See document prepared by Federico et al.

General strategy Plan is to have all 52 stations taking data smoothly Two actions needed: Replace broken chambers where necessary Four spare chambers ready, maybe one more needed Organize chamber expedition (not easy at all) Install new chambers (not easy at all) Provide trigger cards for five new stations They just need these cards In perspective, add the GPS functionality and replace all trigger and GPS cards in the network See talk by Marco Panareo et al.

Meeting in Bari Start 13 October, 15.00 – End 14 October 13.30 Times chosen accoding to trip schedules Schools (and you) will received all information shorty Hotel accomodation will be handled centrally, trips should be arranged by yourselves Foreseen three masterclasses, one hour each They should be simpler and slower than the previous ones, as per the feedback received No EEE collaboration meeting foreseen