Bellemont Fire Station Addition

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Gantt Chart.
Project Management Requirements Prof. Ralph V. Locurcio, PE.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Skyscraper Construction
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
On-line Sorting Technology for CCA-Treated Wood. Funding Received from Sarasota County through the Florida Department of Environmental Protection Innovative.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
CS 160: Software Engineering October 20 Class Meeting Department of Computer Science San Jose State University Fall 2014 Instructor: Ron Mak
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Brainstorming & Project Management
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Recreation and Wellness Intranet Project
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Project Management Requirements
Peach Springs Underpass/Overpass (Structural) Presentation By: Flag-Tech Engineering Yuliang Wang, Yiyang Chen, Jonathan Melendez.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
X470 Project Management EDP Summer 2007 Team #6: Albert Brown Alex Munoz Chris Yeh Daniele Pfeifer Lia Bruno Slava Balashov.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Design Proposal A document prepared to (a) justify the need for the project, (b) describe the engineering process to be taken, (c) outline the expected.
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Upon completion of this module, you will be able to:
Sinclair Wash Stream Restoration Feasibility Study
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Community Meeting, July 18, 2016 Update Designs and Phasing
RESIDENTIAL GARAGE ADDITION
Welcome to the Libertyville Stormwater Master Plan Open House
Scoping Meeting April 20th 6:00 pm
NAU International pavilion expansion
Systems Analysis and Design in a Changing World, 4th Edition
Project Management -- Defining the Project
Fredonia, AZ Water Use Study:
Construction Documents
(Refer to Chapter 2 of the textbook)
Designing a Commercial Shopping Center
PLANS, SPECIFICATIONS AND ESTIMATES
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Chapter 3 Managing the Information Systems Project
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Commercial Building Project Portfolio
How to Build a Great Team
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Town of Newbury Proposed New Fire Station
Duncan Floodplain Feasibility Study
San Simon Dam Break Study CENE 476
Tools for Visualization
Gantt Chart.
Welcome W 15 Introduction to Engineering Design II (IE 202)
Design process.
Project Management Chapter 11.
Competency: Create site plan drawings
CENE Old Town Frame Company
HILL COUNTRY FAMILY FITNESS CENTER
Multi-Family Fourplex Apartment
Construction Management Services April 16, 2018
CENE 486 CAPSTONE PRESENTATION APRIL 26th, 2019 ANNA KURN  
Presentation transcript:

Bellemont Fire Station Addition CENE 476 12/7/2018 Abdullah Alkhayat Lionel Goy Jocelyne Rivas  Marc Wasserman Abdullah Figure 1. Google maps street view of Ponderosa Fire Department [1].

N Purpose Client Bellemont Fire department needs more space for: Housing firefighters Hosting community events Conducting town meetings Storing the Chief’s fire truck Client Town of Bellemont/Chief Antonides Bellemont Abdullah N Figure 2. Map of Arizona with location [1].

N Background Location: Bellemont, Coconino County, Arizona Pilot Travel Center Background Location: Bellemont, Coconino County, Arizona Existing Fire Station was built in 2006 and re-named Ponderosa Fire Station 82 Ponderosa Fire Department Single Family Housing I-40 Shadow Mtn Dr. I-40 Abdallah N Figure 3. Close up location map of the Ponderosa Fire Department location [1].

Scope of Services Task 1.0: Site Investigation Task 1.1: Obtain Plan Sets Task 1.2: Survey Land Task 1.3: Soil Sampling Task 1.4: Survey Data Task 2.0: Soil Testing Task 3.0: Metal Framing Company Research Task 3.1: Cost Research  Task 3.2: Decision Matrix Task 1 lionel Task 2 Marc Figure 4: Land Surveyors [2].

Scope of Services Task 4.0: Structural Design Task 4.1: Design Perimeters  Task 4.2: Foundation Design  Task 4.3: Anchor Bolt Design Task 4.4: Floor Design Task 5.0: Construction Documents Task 5.1: Site Plan Task 5.2: Utility Locations Task 5.3: Foundation Plan and Details Task 5.4: Anchor Bolt Plan and Details Task 5.5: Floor Plans Task 3 Joceylen Taks 4 lionel

Scope of Services Task 6.0: Project Deliverables Task 6.1: Meeting Memo Binder Task 6.2: 30% Report Task 6.3: 60% Report Task 6.4: Final Report Task 6.5: Presentation  Task 6.6: Website Task 7.0: Project Management Task 7.1: Team, Client, Technical Adviser, and Grading Instructor Meetings Task 7.2: Construction Cost Task 7.3: Schedule Task 7.4: Project Deliverables Task 5 & 6  Abdullah 

Exclusions Structural Frame Design of the Addition Drainage Plan Electrical Plan Mechanical-  Heating, Ventilation, Air Conditioning (HVAC) Building Permits Joceylne

Marc Figure 5. Gantt Chart for the Fire Department project.

Marc Figure 6. Critical path for the project.

Staffing Table 2. Staff hours breakdown per task. Table 1. Staff abbreviation code. Lionel

Cost of Engineering Services Table 3. Total estimated project cost of services. Lionel

References: [1] Google Maps, [Online]. Available: https://www.google.com/search?client=firefox-b-1-ab&q=ponderosa+fire+station&npsic=0&rflfq=1&rlha=0&rlla. [Accessed 8 November 2018]. [2] Harbor Compliance, "Arkansas Land Surveyor License," [Online]. Available: https://www.harborcompliance.com/information/arkansas-land-surveyor-license-permit. [Accessed 8 October 2018].