TOWERS CRESCENT BUILDING B

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
What's in Your Structural Model? Understanding Detail-Level Requirements Using Revit® Structure Derek J. Gilbert, P.E. Senior Structural Engineer Foley.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Building Superstructures Construction Mr. O’Rourke.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
H OTEL | N ORTHEAST U.S. J ORDAN R UTHERFORD | S TRUCTURAL O PTION F ACULTY A DVISOR | D R. T HOMAS B OOTHBY AE S ENIOR T HESIS | A PRIL 8, 2013.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Natural air drawn into horizontal slots in cladding, with pressure differentials generated by aerodynamic form of building drive natural ventilation. Architects.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Computer Associates International, Regional Office
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned.
Economical Design of Concrete Buildings Lawrence Novak.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
T HE D UNCAN C ENTER D OVER, D ELAWARE R ACHEL G INGERICH, S TRUCTURAL O PTION S ENIOR T HESIS P RESENTATION A PRIL 15, 2008.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Introduction TOWERS CRESCENT BUILDING F Introduction - 199’ Speculative Office Building - 304,880 Square Feet of Office Space - 368,770 Square Feet of.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Prof. Shrikant M. Harle Asst prof. Dept of Civil Engg PRMCEAM
Pearl Condominiums Philadelphia, PA
Multistory Office Building
Advisor: Professor M. Kevin Parfitt
Multistory Office Building
Introduction James W. & Frances G. McGlothlin Medical Education Center
Residential Wall Systems
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Ryan Johnson - Structural Option
Residential Wall Systems
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Located at Tufts University in Boston, Massachusitts
Lecture 4 Building Construction 2 Week 5
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

TOWERS CRESCENT BUILDING B VIENNA, VA Mike Synnott Structural Architecture: Size: 218,000 sf Height: 9 Stories, 122.75' Building designed after existing Phillip Johnson building already on site. Part of Master plan including existing and 2nd new building. Glazed Aluminum and Brick Curtain Wall Construction: Owner: Quadrangle Development Corporation and AEW Capital Management Project Designer: Rod Henderer, AIA Project Manager: A. J. Thackrah Structural: KCE MEP: EDG GM: Davis Construction Civil: VIKA Project Delivery: GMP ( Guaranteed Maximum Price) Cost: app. $37,000,000 Structural System: Structural Steel Moment Frame 5.25" Flat Slab on Metal Decking Concrete/Steel Composite Design