Scintillator HCal Prototype

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

The Tile-HCAL Physics Prototype; concept, status, time plan Volker Korbel, DESY, for the CALICE Coll. Montpellier, France, November 2003 Groups involved:
1 H-Cal front-end ASIC Status LAL Orsay J. Fleury, C. de la Taille, G. Martin, L. Raux.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
V. Korbel, DESYECFA-DESY Workshop, NIKHEF1 Readout for the minical and Tile-HCAL prototype, 15’ The VFE RO: The light signals Photo-detectors 1) APD’s.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Next generation HCAL prototype Felix Sefkow EUDET electronics meeting UCL, December 5, 2006.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
1 CALICE Tail-Catcher Muon-Tracker(TCMT) Preliminary Test Beam Results Kurt Francis NICADD/Northern Illinois University For CALICE Collaboration ALCPG.
JRA3 Institute of Physics ASCR Prague
LED notched fibre system short HBU0 party with QMB6
Calorimeter Mu2e Development electronics Front-end Review
on behalf of the AGH and UJ PANDA groups
Marcin Chrząszcz Cracow University of Technology Itamar Levy
CALICE meeting 2007 – Prague
HCAL task status report
Towards a realistic Scintillator HCAL with SiPM read-out
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Joint Research Activity 3: Calorimetry
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Scintillator HCal R&D Update
BESIII EMC electronics
ITEP&MEPhI status report on tile production and R&D activities
Scintillator tile- SiPM systems R&D
CALICE meeting 2007 – Prague
Testbeam analysis on module #1
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
Test Beam: Calorimetry
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Scintillator HCal Prototype Vishnu V. Zutshi for the Tile-Cal Group

Tile-Cal Group Prague LAL DESY, Hamburg Univ. ITEP, JINR, LPI, MEPhI Imperial NIU 5/4/2019 V. Zutshi, Snowmass 2005

Prototype ~ 1m3 (38 layers) 2cm (1.6 + 0.2 +0.2) steel absorber 5mm thick scintillator with WLS fiber and SiPM on-board Aiming at technology and physics goals….. 5/4/2019 V. Zutshi, Snowmass 2005

Component schematic FEE Calibration electronics To DAQ Tiles+SiPMs 5/4/2019 V. Zutshi, Snowmass 2005

Prototype Geometry Studies 5/4/2019 V. Zutshi, Snowmass 2005

Scintillator tiles 12cm x 12cm 3x3 6x6 12 x 12 6cm x 6cm 3cm x 3cm Tile size 3x3 6x6 12 x 12 need 3500 4000 1000 molded milled 3000 800 6cm x 6cm 3cm x 3cm 5/4/2019 V. Zutshi, Snowmass 2005

SiPM ~1000 pixels on 1mm x 1mm Bias voltage ~ 50-60V Gain ~ 106 Quantum x geom ~ 12-15% 5/4/2019 V. Zutshi, Snowmass 2005

‘Minical’ test 0.5 cm active 2 cm steel Confidence in SiPM as a calorimetric device 5/4/2019 V. Zutshi, Snowmass 2005

SiPM QC Gain, dark rate, cross-talk, saturation monitored to select SiPM’s for use in HCal. 2500 in hand. Hope to have every tile instrumented by early 2006 5/4/2019 V. Zutshi, Snowmass 2005

Light yield SiPM HV set to Obtain 14-15pe/mip 5/4/2019 V. Zutshi, Snowmass 2005

Cassette Commissioning in the e- TB initiated 2 assembled, 4 in the works 5/4/2019 V. Zutshi, Snowmass 2005

Cabling 5/4/2019 V. Zutshi, Snowmass 2005

Base board Charge Injection Dimensions: 16 x 16 cm² 2 base boards (12 amplifier cards) / layer SiPM Interface, 18 chns. Charge Injection Test Outputs (SRIN, TCALIB) DAQ Interface Dimensions: 16 x 16 cm² HAB 5/4/2019 V. Zutshi, Snowmass 2005

Front-end ASIC ASIC 8-bit DAC 1-5V in 100nF 10pF Variable Gain Charge Preamplifier Variable Shaper CR-RC² 12kΩ 4kΩ 24pF 12pF 3pF in 8pF 4pF 2pF 1pF 40kΩ 8-bit DAC 1-5V ASIC 5kΩ 50Ω 100MΩ 2.4pF 1.2pF 0.6pF 0.3pF 0.1pF 0.2pF 0.4pF 0.8pF 6pF Test_pulse 5/4/2019 V. Zutshi, Snowmass 2005

Amplifier Board Parameter Shift-Reg Temperature Monitor ASIC ASIC’s all tested. Boards being assembled. Analog Line Driver 5/4/2019 V. Zutshi, Snowmass 2005

Data Acquisition Use modified version of the ECal (CERC) board. Similar no. of analog channels. 8x12 (16-bit) ADC’s 8Mb memory (2k events) 1 KHz peak rate 180ns trigger latency Have been used successfully In ECal test beam run Become available in Nov. 5/4/2019 V. Zutshi, Snowmass 2005

Calibration & Monitoring Observation of single pe for non-linearity correction. Need mip and variable Intensity LED calibration Gain  1.7% / K , 2.5% / 0.1V Signal Amplitude  4.5% / K , 7% / 0.1V 5/4/2019 V. Zutshi, Snowmass 2005

CAN (ADC, Enable Pulser, DAC) Monitoring CMB T CAN (ADC, Enable Pulser, DAC) Gadow Goettlicher, Reinecke HBAB_TOP HBAB_BOT Redundant monitoring: Reference LED pulse Direct gain monitoring temperature and voltage monitoring 5/4/2019 V. Zutshi, Snowmass 2005

Absorber stack and table Layer 1 Construction of moveable table in spring 2006 Will be used for all CALICE HCal options. 5/4/2019 V. Zutshi, Snowmass 2005

Summary Tail Catcher Electronic Racks HCAL ECAL Beam Preparing for test beam in summer-fall of 2006 5/4/2019 V. Zutshi, Snowmass 2005