Testing Coordination at ESS

Slides:



Advertisements
Similar presentations
Requirements Structure and Status for NCFE
Advertisements

J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Anders Sunesson RF Group ESS Accelerator Division
1 1. Some recent views ( ) 2 Linac tunnel
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
ESS licensing process and Readiness Reviews
Cryomodule test stand at ESS site
Updated with comments 22 may 2017 Updated again 29 June 2017
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Tom Shea Front End Meeting Catania
ESHAC meeting October 1-2, 2018
Beam Commissioning at ESS
RF systems introduction
Way of working with ICS HWI Hardware and Integration
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
ICS update 7th Experiment Control Workshop
Operations/Control room organization during commissioning
Ciprian Plostinar Workshop on Testing and Commissioning
Infrastructure Project and Component Installation Accelerator Project
Ion Source and LEBT control system topology, Interlock strategy
Krzysztof Czuba ESS LLRF Quarterly Meeting
Workshop commissioning Installation Coordination at ESS
Risk, Schedule, Deliveries
Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
ISRC and LEBT Vacuum System Design
Welcome and charge to the committee
PSS verification and validation
MPS commissioning at ESS
PSS Verification and validation
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
On behalf of protection systems
Review of TDR Chapter 9 “Transition to Operations”
European Spallation Source ERIC
Safety Readiness Review (SRR) Thomas Hansson, ESH
DOE Review of the LCLS Project October 2006
Machine Protection PLC Based System Verification and Validation Plan
High Level Readiness Reviews
Licensing update ESHAC #7, October 2017
Hector Novella Deputy project manager
Beam Commissioning Planning
Operation of Target Safety System (TSS)
Lessons from the 1st Safety Readiness Review
Accelerator NCFE Liaison Officer
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Status of the ESS High Power RF Systems
Atefeh Sadeghzadeh Control engineer – Target safety and control
Charge and Agenda of the 18th TAC meeting
Accelerator Testing Planning
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Acc Collaboration board Trieste
Accelerator Installation Schedule
SAR MEBT Bilbao March Mats Lindroos
ISrc & LEBT – ICS Installation Readiness Review
Stuart Birch On behalf of Protection Systems Group
Project Support Meeting January 9, 2019
Presentation transcript:

Testing Coordination at ESS Workshop on Testing and Commissioning Iñigo Alonso, Lead Engineer, Linac Group www.europeanspallationsource.se October 16, 2018

Outline Strategy Planning Status Lessons (being) learned I am responsible for planning/coordination of hardware testing, by coordinating activities in that area, and working within the schedule boundaries set by the overall project plan.

Strategy Manufacturing Installation Commissioning Operations Perform FAT Perform Installation Test & Inspect Perform SAT Perform System Tests Perform Licensing Factory Acceptance Tests Installation Inspections Site Acceptance Tests Verification & Validation Tests IRR TRR SAR ORR SRR Fitting into the bigger picture (Installation, Testing and Commissioning Plan) For more details on the high level reviews, see the High Level Readiness talk by John Weisend II Installation Readiness Review (IRR) Examines the final technical design, emphasising on interfaces between components, subsystems, controls integration, plans, staff, and tooling required for the installation work itself. Test Readiness Review (TRR) Ensures that the product, its test equipment, support personnel, and test procedures are ready for the verification activities. System Acceptance Review (SAR) Ensures that all requirements are fulfilled by: examining the facility, end products, documentation, test data as well as analysis supporting the verification activities. Operational Readiness Review (ORR) Ensures that facility, personnel, and procedures have reached the required maturity for hand-over to operations phase. The main purpose of the testing activities is to verify that the systems and components meet their requirements and operational goals, i.e. they are verification and validation activities. Here we focus on the activities done after installation is finished and before we start producing beam.

Handbook of Engineering Management

Commissioning vs Beam Commissioning In the context of the Handbook for Engineering Management, “Commissioning” is used for the Verification and Validation phase of all systems, independently of the use of the proton beam. In general, when we talk about “Commissioning”, we mean “Beam Commissioning”. But there are exceptions, like the cryoplants, which are also being “commissioned”. To show to that the systems are ready from a safety point of view to start “Beam Commissioning” part of the accelerator, 5 separate Safety Readiness Reviews (SRR) will be held by ES&H. Hardware Testing / Hardware Commissioning / “Cold” Commissioning SRR are not linked to the licensing ISrc+LEBT RFQ+MEBT+DTL1 DTL2+DTL3+DTL4 DTL5+Spk+MBL+HBL+HEBT+DmpL A2T SRR1 SRR2 SRR3 SRR4 SRR5

Strategy: Pragmatic approach Centralize coordination to get some consistency, but give teams agency to use the appropriate practices for themselves. We try to minimize disruptions to ongoing work. It is better to adopt a good-enough approach quickly than a perfect one eventually, but it will nonetheless require an effort from everybody to adopt it. It is challenging with the available resources. The experts on each system know best what and how needs to be tested.

Planning: Priorities Realistic time allocation in the ITC plan Add and link detailed activities in JIRA Milestones linked between JIRA & P6 Key dependencies Links to other Accelerator systems and other divisions (CF, ICS…) Correct Gateways/Reviews (TRR, SRR…) Additional support Identify relevant Permits (internal, SSM…) Ensure Safety Measures (RAMS, WSCP…) Reconciliation with P6 of JIRA planning monthly

Status: Procedures Use of ESS procedures to coordinate plans: Handbook for Engineering Management, ESS-0092276 Graphical Workflow, ESS-0093443 Procedure for Prepare for Installation and Installation, ESS-0102864 Procedure for Test, Verification and Commissioning, ESS-0102865 Handbook for System Verification, ESS-0117128 Accelerator System Verification Plan, ESS-0005458

Status: Verification Plans BCM verification plan LEBT EMU verification plan DPL verification plan LEBT NPM verification plan LEBT FC verification plan HIPOT Testing for vacuum cables Gamma Blockers Verification Plan RSMS Test Procedures … ESS-0184393 ESS-0316980 ESS-0316977 ESS-0316982 ESS-0316981 ESS-0306087 ESS-0127783 ESS-0092221

Status: Planned activities (NC Linac) System Local tests Integrated tests RFQ Cooling Water PLC comm. w/ controls, Closed loop test (dry run) RFQ Vacuum Leak tests RFQ EMR RFQ tuning RFQ Test comm. w/ LLRF MEBT Cooling Water Manifold inst. MEBT Vacuum MEBT EMR Buncher tuning Controls tests, Tuner comm. w/ LLRF, RF conditioning MEBT Bilbao rack equipment MEBT Beam Instrumentation Tests w/o beam (x9) MEBT Magnets MEBT Chopper MEBT MPS Tests MEBT Dry run DTL EMR RF conditioning 1, 2-4, 5 DTL Local HW tests: 1, 2, 3, 4, 5 Dry run: 1, 2, 3, 4, 5, HW verification w/ beam

Status: Planned activities (NC Linac)

ISrc & LEBT Testing and Commissioning Lessons Learned Session held 2018/10/12 Worked well: PSS is working great Weekly meeting to organise the SRR was very useful Vacuum documentation was excellent from the controls point of view Good team building experience Great support from technicians and Area Coordinators To be improved: Changing conditions lead to need for re-testing FAT documentation lacking Sequence of tests (PSS...) needs to be more explicit Management disconnect, lack of engagement Quality inspections for all installations, make no assumptions Verification plans missing (sometimes), and they should also include integration tests Cramming activities to meet “arbitrary” deadlines leads to inefficiencies Infrastructure plan still under development, coordination needed TRR was too weak Suggestions: Clear checklists Clarify the safety responsibility during testing Balance the paperwork vs hands-on work SRR ≭ Beam RR, minimalistic and focused on safety Dry runs Report in preparation

Summary Short term goals: Medium term goals: Long term goals: Identify missing activities and V&V plans Update the JIRA plan with milestones linked to Primavera Medium term goals: Help producing the missing documentation Support the preparation of TRRs and SRRs Organise dry runs Long term goals: Make sure the commissioning team gets the hardware they need, reliably tested and on time

Thank you for your attention