Similar presentations
Safety Absolutes Green Lake
Advertisements

HSE instruction REC B.V. Harlingen Safety starts with the man in the mirror Welcome Information: All employees VCA or SCC Emergency exit Telephones off.
PowerPoint presentation
STEM Room 305 Mrs. Barbour.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Climbing the Ladder to Safety
LADDER SAFETY.
Working at Height Presented by Nic Carstens Health and Safety Officer Tel:
Now is this a high risk job?. HIGH RISK JOBS – RED CODE WORKING WITH ASBESTOS, OR UNDERTAKING A JOB WHERE THERE IS A LIKELIHOOD THAT ASBESTOS IS PRESENT.
Most Frequently Cited Serious Violations Construction – FY 2008.
Welcome to Tulloch’s Site Induction
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
2 3 4 One of the most common type of workplace injuries is those incurred from manual handling. To prevent manual handling injuries an employer needs.
Safety for Working in High Places
Material Handling. Introduction Handling and storing materials include a wide variety of tasks like: Hoisting tons of steel with a crane Driving a truck.
MAKE SURE YOUR OWN ACTIONS REDUCE RISKS TO HEALTH AND SAFETY.
1 © 2008 All Rights Reserved A TRAINING FOR THE METALWORKING INDUSTRIES MANUAL HANDLING OF MATERIALS.
A guide to... General Construction Site Safety. This training tool should be used to help educate everyone on the dangers of working in the construction.
State of NM Loss Control Bureau Specialists And Law Offices of the Public Defender Loss Control Committee.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Walking-Working Surfaces: Preventing Falls. Start Safe and Stay Safe In order to Start Safe and Stay Safe in the areas where you walk and work, you should.
Unit 1001 Safe working practices in construction © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 6 Know about basic working.
Unit 201: Health and safety in building services engineering
OHS&W IN THE ART ROOM. STORAGE Shelves and racks should be stable and ideally built in or fixed to walls Ensure that storage racks are in a safe and tidy.
Work Experience Key Points. Overview Approach potential employers yourself Have a meeting at least 2 weeks before –Sign all forms –Understand the workplace.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
Site Safety, Health & Environmental Induction. Management Commitment to H&S Operate in accordance with Health & Safety best practice Develop and maintain.
Health & Safety in the Construction Industry
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Procedure for Use of Stihl Multisystem (Revision 0 – 18th January 2011) Toolbox Talk.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Keep your back straight Keep your arms as close to the body as possible Place hands under the load and pull the load close to your body Grip firmly using.
Warehouse & Storage Safety
Starter Activity What kind of tasks or situations is an employer legally required to perform a risk assessment for? Use of any work equipment. Management.
Personal Protective Equipment (PPE)
We always have time to work safely
C.O.S.H.H Awareness Session
Excavation Hazards & Controls.
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Gasunie is one of the biggest gas infrastructure companies in Europe
Fall Hazards.
Safety O.H.S..
Safety Test.
Welcome to ‘project name’
Session 1 Ladders Health and safety Book Pages
Most Frequently Cited Serious Violations
Health and Safety Induction
Personal Protective Equipment
MR. J. Hanna Occupational Studies
Most Frequently Cited Serious Violations
Safety is part of our culture at Halliburton
Fall Hazards.
Slip, Trip, Fall Are four letter words Presented by: Dan Klimek
Health and Safety Induction
MANUAL HANDLING OF MATERIALS METALWORKING INDUSTRIES
Personal Protective Equipment (PPE)
Legal and Organisation requirements for data recording
Ladders Standard 29 CFR Part
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Parish Safety Induction
Fall Hazards.
USQ Student Safety Induction Training
Machine Shop safety.
Parish Safety Induction
MANUAL HANDLING for Non-Clinical Staff
Presentation transcript:

ULTIMA BUILDING GROUP PTY LTD SITE INDUCTION ULTIMA BUILDING GROUP PTY LTD

Construction Induction (White Card) No induction will be done without a valid white card The White Card may be from any Australian State Regulator Legal requirement to have the White card with you while working We CANNOT accept a card/certificate issued by the trainer

We believe that no job is so important that it cannot be done safely. Duty Of Care Take reasonable care of your own and others health and safety. Take reasonable care that your own acts do not adversely affect others. Comply with reasonable instructions and co- operate with reasonable policy or procedure. We believe that no job is so important that it cannot be done safely.

Personal Protective Equipment Minimum site PPE requirements are: Hard Hat Hi Visibility clothing Steel Capped boots Any other PPE required by SWMS All PPE must be: In good condition To Australian Standard Work to Manufacturer's guidelines Not out of expiry date

Mobile Plant The following site rules apply: Mobile Plant Operators must not leave mobile plant unattended whilst running All personnel and other mobile plant must not enter the delineated area before making positive contact with the operator and making sure bucket attachments are grounded Only licensed/competent persons to operate plant Plant must be operated in line with the OEM, and SWMS

All excavations over 1.5m must be protected (benched, battered or shored), particularly if people will be working in them All open excavations must be barricaded to prevent unauthorised access No person may enter the swing radius of the excavator while it is operating Review site services plans and check if any permits are required before digging Ensure Dial before you dig is completed for excavations Spoil needs to be kept distance of maximum excavator arm reach from trench edge Excavation

Work at Heights- Roof & Truss All roof works MUST have suitable edge protection prior to beginning Edge protection MUST extend 1m above the edge of the roof Trusses must be stood without standing on the top plate, work from platform ladders and behind secured trusses as per the SWMS Gaps between trusses and joists must be no more than 600mm centres

Work at Heights- Ladders & Trestles Ladders and trestles should be inspected prior to use for any damage, and ensure locking devices are working Ladders and trestles must be industrial rated and meet a minimum of 120kg load rating Ladders and trestles must meet Australian / New Zealand Standards Extension ladders must be adequately secured, extending 1m past the landing and used for access and egress only- where work is required to take place from ladder, a platform ladder should be used to allow 3 points of contact

Scaffolding If accessing scaffold to complete work, the following must be adhered to: Only licenced scaffolders are to erect / modify scaffold, you cannot remove any components Check there is a current scafftag in place and do not exceed the working load Do not throw (‘bomb’) materials from the scaffold Use only designated working platforms and accesses Comply with all scaffold signage, do not use incomplete scaffold

TOOLS & EQUIPMENT All tools & equipment should be inspected for any damage prior to each use Storing and using tools and equipment correctly will help prevent damage Where tools and equipment are used at heights, consider use of tool belts and / or lanyards to prevent fall on to persons working below Do not remove any safety devices (e.g. guards) from tools & equipment Be aware of how / where you are positioning yourself when using tools and equipment, and ensure you are not putting yourself at risk of injury Ask for instruction if you are unsure on correct use / equipment of tools & equipment

Electrical Equipment Prior to starting work, all electrical equipment must be checked to ensure it is tested and tagged (every 3 months) A visual inspection should also verify there is no damage to cords such as cuts and freys.

Electrical Equipment Only Industrial grade Extension leads are to be used (30 meter max) If requiring a multi board a portable RCD may be used The joining extension leads is not permitted Electrical Leads must be suspended off the ground using insulated hooks or hangers RCDs must be fitted to all power sources and protect each piece of equipment. RCDs must be tested monthly and a push button test done prior to use.

Hazardous Manual Tasks Prepare yourself for work, prepare for work by warming up and stretching Whenever it is practical to do so use a forklift, trolley, or other mechanical aid ask the assistance of others to eliminate the need or minimise the risks of manually handling materials – OR ask for help for a team lift To minimise the risk of injury, correct lifting techniques should be used when lifting: Think and plan the lift Assess the risk Adopt a stable foot position Keep a firm grip / lift with your legs Hold load close to body Avoid bending and twisting

Hazardous Substances & Dangerous Goods Substances used on site must be stored, handled and disposed of correctly as outlined in the Safety Data Sheet (SDS) Safety Data Sheets give all the information of Hazardous substances and dangerous goods including ingredients, first aid information, PPE that must be worn, how to dispose of correctly etc SDS’s must be accessible on site at all times for referencing Examples of Hazardous Substances and Dangerous Goods include: Petrol Cleaning Products Concrete mix Glues / silicones / adhesives

Hazardous Substances & Dangerous Goods Substances must be kept in adequate clearly labelled containers Substances storage areas must display correct Hazardous Goods signage Once the substance is on site: Employees using the product are made aware of correct use, hazards, control measures and spill containment.

Waste Management Concrete/Cement sludge must be contained. If requiring to wash out, this must be done at a designated washout area Paints must be contained. No paint brushes are to be washed on site. Chemicals requiring disposal must be disposed off in accordance with EPA rules. Non toxic/non hazardous Construction Materials Waste must be organised and placed in the site’s construction waste skip bins. Food scraps, and all wind blown materials (papers & packaging materials) must be placed in the site’s general waste bins.

Housekeeping All mess you make, you clean up Poor housekeeping leads to; Crush injuries; Splinters, cuts and eye injuries; Wasted time; Cuts to hands and fingers; Fires; Slips, trips and falls; Serious injury or death and Poor quality work. All mess you make, you clean up Dispose of trade waste as you go Ensure waste is secure, particularly in high winds Segregate waste where required (wood, metal, cardboard etc) No food scraps / rubbish is to be left on site and must be disposed of in bins correctly. Leave roadways and paths in clean condition, free of mud left from tyres and boots

Incident Management What is an incident? An incident is an unplanned or undesirable event resulting in, or has the potential for personal injury, loss of productivity, environmental or property damage, or a combination of these. Report all incidents/near misses / injuries immediately to your Supervisor