PUBLIC TRANSPORT INDUSTRY

Slides:



Advertisements
Similar presentations
Development of Bus Rapid Transit (BRT) in Africa Experience from Lagos, Accra and Kampala.
Advertisements

Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.
9/7/2012 MBS UU.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
Briefing on Cape Town’s Integrated Rapid Transit System 2009.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
INNER CITY INVESTMENT SUMMIT TRANSPORT, INTEGRATED PUBLIC TRANSPORT NETWORK AND TRAFFIC MANAGEMENT Presenter: L N Mangcu SED: Transport and Roads Department.
Dr Lina Shbeeb Minister of Transport. Jordan
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
PROGRAMA DE APRENDIZAJE PERMANENTE GRUNDTVIG PROGRAM LEARNING THROUGHOUT LIFE.
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
ITS in Urban Transport Projects assisted by JASPERS Budapest – 17 June 2010.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
January THE ISSUE Launch Event. Leicester. THE ISSUE Traffic- Health- Environment. Intelligent Solutions Sustaining Urban Economies. Professor.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Regional Centre Transport Vision 2013 Presentation to Salford City Council Members - 19 August 2008.
Innovative ITS services thanks to Future Internet technologies ITS World Congress Orlando, SS42, 18 October 2011.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
NATIONAL TRANSPORT STRATEGY. INTERNATIONAL BENCHMARKS.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Traffic Management and Transport Demand Management Gladys Frame Consultant Traffic Engineer The World Bank Module 4: Urban Transport Planning.
7 May 2014 Sustainable transport vision for Greater Cairo.
Urban Sprawl Government notices problems in the 1980s –Urban sprawl –Car ownership rising (1960: 113/ : 422/1000) –Little housing for low income.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Restructuring of the Finnish Infrastructure Administration Draft
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Public Transit & Transportation Network Companies
Multi Agency Exchange May 16, 2017.
39th Meeting of APEC EGEE&C Sydney, Australia 28 February 2012
ARCH – 4601 Feasibility Study Presentation
Boosting Urban Climate Action: Urban Pathways Stefanie Holzwarth Urban Mobility Unit UN-Habitat
Chelan County Transportation Element Update
NAIROBI METROPOLITAN AREA TRANSPORT AUTHORITY (NaMATA)
2016 APTA Sustainable and Public Workshop COTA’s Role in Smart City Columbus Implementation July 25, 2016 Michael L. Bradley Vice President of Planning.
A Bus Corridor for George Street in New Brunswick
Regional Roads Committee
Optimization in tramway networks planification: Optimization of design and allocation of stops and frequencies depending on the costs of operation and.
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
ITS VA Conference Amy Inman Planning & Mobility Programs Administrator
SIX Pillars of Integrated Public Transport
Service Routes and Community Transit Hubs: Right Sizing Transit
Transit for Tomorrow strategic plan
2016 APTA Sustainable and Public Workshop COTA’s Role in Smart City Columbus Implementation July 25, 2016 Michael L. Bradley Vice President of Planning.
FY 2019 Recommended Wake Transit Work Plan
Advanced Transit Systems Opportunity for Deployments
Rethinking Public Transport Reform A City of Cape Town Perspective
Transit Systems Planning
Chapter 5. The Transportation-Planning Process
Smarter Cities: Creating opportunities through leadership and innovation Ed Bryan, Vice President, Industry Solutions IBM Software Group July 2013.
Bus Rapid Transit Study
Status Report on Rochester’s DMC Transportation Plan
Long term strategy and structure
D Line Project Overview
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Recommendations to improve the performance of Bus Rapid Transit projects Oscar FARINA (Argentina) – Mathieu LUZERNE (France)
Automated Fare Collection 2.0 Next Generation MBTA Fare System
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Central Avenue Rapid Transit
Innovation in Railways NTA Ireland
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Presentation transcript:

PUBLIC TRANSPORT INDUSTRY PRESENTATION ON PUBLIC TRANSPORT INDUSTRY ENHANCING ACCESSIBILITY AND MOBILITY IN THE NAIROBI METROPOLITAN AREA

Vision A safe, realiable, affordable and seamless public transport system Mission To transform the quality of life through delivery of an integrated and sustainable Public transport system within the Nairobi Metropolitan Area

Thika Rd: Status quo Freedom from congestion

What is BRT? Enclosed and secure stations Dedicated bus lanes Rapid boarding Pre-board payment with smart cards Pedestrian and cycle access New, clean, high-capacity buses

Transformation - Governance (Regulation) Establish a coherent licensing strategy based on route capacity Digitize the public transport services using intelligent Transport System (ITS) - Priority systems - Control centers,onboard devices etc. - Signalization information etc. Operation agreements, Infrastructure service agreements, Value Chain Opportunities administration. Traffic Management, enforcement, monitoring the service quality and reporting.

Transformation - Governance (Operations) Operate a trunk network gazzeted as the Mass Rapid Transit System (MRTS) Corridor Allocate current buses and matatus routes on the feeder network in accordance with the route plans,integrated to the Trunk Provide last mile connectivity, through boda boda, cycle paths and walkways

Transformation Technical; AIM - Preparing an integrated Transport plan; Calibrating a Travel Demand Model for the NMA Formulating the Urban Mobility Plan Establishing the route network Deriving an integrated service plan Developing the Master Implementation Plan Having an Investment Plan Implementation

Transformation – Business Preparing a business plan, derived from the integrated service plan - SPV(s) invests in operations Preparing an Infrastructure Plan - Agencies engaged through Service Level Agreements (SLA) for Development & Maintenance Bankable Projects Prepared - Resources mobilized

Traffic along Haile Sellasie Avenue

Transformation – (Short Term) Decongesting the Urban inner core (diamond border of Ngara, Muthurwa, Haile Selasie Avenue, and Museum Hill) Provide a circular service as a last mile solution Transform the Central Station(NCS), to provide transfer function between modes Reconfigure traffic flow patterns in the Central Business District (CBD) Provide peripheral Termini Capacity, boarding and alighting points to inbound public Transport Vehicles Use sports, and institutions’ facilities for park and ride

Transformation – Implementation (Medium Term) Develop stations along BRT Line 2 (Thika Rd), line 5 (Outering Rd), Line 3 (Ngong Rd) Utilise Commuter Rail Stations (Embakasi, Syokimau, Kimbo,Ruiru) as an integrated system to the Bus and Airport sevice Commence BRT on line 2, 3 and 5 Establish No Transit days and local distributors within urban core Reroute traffic to enhance mobility and access Continue with public participation and implement a comprehensive communication strategy

Transformation – Affected (Medium Term) All affected in the Short Term Operators along BRT and CR network under medium term implementation Motorists Businesses along the corridors Employees in affiliated commercial ventures (note positive effects are expected and negative effects will be mitigated)

BRT Std Buses Viz Regular Metro BUS NOTE: BRT is a system of mass movement of people (not the Rolling Stock only). 1. BRT Bus has 2 doors on the right hand side since we shall be using stations in the median. 2. BRT bus also has a door on the left hand side for use at Kerb side on-boarding and in mix use traffic 3. Size of the BRT bus door is 1,100mm while metro bus is normally 600mm 4. Driver controlled doors (safety) 5. The size of the gangway differs significantly. This allows for more passengers to stand, and for passengers to embark and disembark. 6. At level boarding. BRT bus has no steps (auto Ramps or Driver Controlled)

BRT Std Buses Viz Regular Metro BUS 7. Universal access. Allows for wheel chairs to be used to board the bus. It also has a wheel chair dedicated seat. It also has sitting priority seating for elderly, sick and pregnant mothers. 8. Is fitted with APTMS and UTS systems. UTS is key to allow for buses to have priorities at signalized junctions in case they are running late. I APTMS is useful for passengers as it communicates with them inside the bus and at stations. APTMS also allows for driver to communicate with the command center. 9. Fuel efficient. Our specs are Euro 4 diesel minimum standards. The future is to go hydrogen and electric 10. Engine performance for a BRT bus is often high. This allows for the bus to hit peak speed faster

BRT Std Buses Viz Regular Metro BUS 11. The body is designed using stainless steel frame. This is because it’s light, it doesn’t rust and absorbs weight in the event of an accident impact. It also lasts longer giving the bus a life of 20-25 years. The BRT bus has a rollover cage structure, which protects passengers in case of an accident. The rollover cage ensures that the bus structure does not collapse. The BRT bus’s body is designed with a view that majority of passengers will be standing.

BRT Std Buses Viz Regular Metro BUS Contd' 12. Runs on a dedicated corridor 13. It is designed to run a scheduled service 14. Easier Boarding and alighting. 15. Either low floor low entry bus or high floor bus. High floor requires a platform low floor doesn't 16. BRT buses are designed to last up to 25 years. The body should last for at least 12-15 years. 17. Most right had BRT bus chassis are made in Brazil but are normally locally assembled. 

NOTE BRT systems typically feature significant investment in enclosed stations which may incorporate attractive sliding glass doors, staffed ticket booths, information booths, and other more standard features listed above. They will often include level boarding, using either Low-Floor Buses or higher boarding platforms level, and multiple doors to speed passenger boarding and enhance accessibility to disabled passengers.

Moi Ave: Existing

Moi Ave: Proposed

THE END THANK YOU