Workgroup meeting October 2014

Slides:



Advertisements
Similar presentations
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Advertisements

Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Congestion Management
Workgroup meeting October 2014
Transparency Project GRI NW Region
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Update on GRI NW Transparency Project
Capacity Conversion – 616s
20th April 2016 Teleconference
EU Implementation Programme
Transmission Workgroup 7th July 2011
Background and Process
CMP Transparency Requirements
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Transmission Workstream 4th July 2007
20th April 2016 Teleconference
Transmission Workstream, 6 August
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
37th IG Meeting South Gas Regional Initiative
2016 and beyond Ukrtransgaz.
Transmission Workgroup – 1st December 2011
20th April 2016 Teleconference
Transparency Project GRI NW Region.
18th July 2016 Teleconference
European Transparency Requirements
37th IG Meeting South Gas Regional Initiative
Proposer: National Grid NTS Panel Date: 17th April 2014
MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective
PARCA Security and Termination Amounts
7th July 2011 Transmission Workgroup - Elexon
Modification Proposal 0283
Publication of Zonal Flex Data
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Review of Physical Regime Times for Modification Proposal 461
MOD National Grid NTS Initiated Flow Swaps
DN OAD Processes: RG 0316 : Offtake Workstream
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Meeting Friday 13th September 2013 Hayley Burden
Review Group /09/2007.
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
UNC Transmission Workstream 15th June 2005
Entry Overrun Calculation
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Provision of Interruption Information by DNOs to Transco NTS
Nexus Workgroup Mod 0473 Presentation
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Stefan Leedham Transmission Workstream 2nd November 2006
195AV “Future work” – system flexibility
Capacity validation, renominations and within-day capacity purchase
Exit Constraint 23rd January 2013.
Transmission Workstream 05 November 2009
Presentation transcript:

Workgroup meeting October 2014 Reform of gas allocations regime at Interconnection Points UNC Modification 0510 Workgroup meeting October 2014

Introduction The Modification Solution covers 3 areas: Allocation of gas by NG NTS to IP Users equal to their confirmed nominations NG NTS and the adjacent Transporter to allocate the difference between metered quantities and net aggregate confirmed nominations to an Operational Balancing Account (OBA) Provision for NG NTS to allocate Users in proportion to measured quantities in some circumstances: Breach of OBA Steering Tolerance Exceptional Event Where NG would otherwise take system management actions 2

Recent operational history at IPs In the last three years at IPs: No NTS Entry or Exit Constraints have occurred requiring firm capacity buy backs System management tools used at IPs 9 times (scaleback of interruptible capacity, locational trades, restricting system exit flexibility) Supply losses have occurred 5 times (all ending prior to 14:00)

Illustration of proposed arrangements (1) NG monitors gas flow vs flow profile (DFNs and OPNs) through Gas Days Allocate as nominate Agreed steering tolerance 1 2 3 4 DFN/OPN Flow profile Gas Days 4 Actual Gas flow

Proposed arrangements if the Steering Tolerance is breached (2) NG monitors gas flow vs flow profile (DFNs and OPNs) through Gas Days NG and adj TSO agree to extend the cumulative steering difference beyond tolerance for limited period to enable allocate as nominate on Day 3 Allocate as nominate Conversation with adjacent TSO Agreed steering tolerance 1 2 3 4 DFN/OPN Flow profile Gas Days 5 Actual Gas flow

Proposed arrangements if the Steering Tolerance is breached (3) NG monitors gas flow vs flow profile (DFNs and OPNs) through Gas Days Conversation with adjacent TSO Possible Proportional Allocation1 Gas Day 4 Agreed steering tolerance NG and adj TSO agree to extend the cumulative steering difference beyond tolerance for limited period-allocate as nominate Day 3 Measured flow and OBA balance (confirmed on Gas Day 5) show unexpected breach in steering tolerance 1 2 3 4 DFN/OPN Flow profile Gas Days 1Only if the TSOs cannot agree a further temporary extension of the steering tolerance 6 Actual Gas flow

Proportional allocation (net) forward flow should be 90 units entry based on noms Say measured flow = 80 units, then virtual reverse flow allocations remain whole and forward flow allocations are proportionate to the forward flow Confirmed Quantities: IP NG NTS network Adjacent TSO network Physical flow direction NTS entry Confirmed Quantities NTS Exit Confirmed Quantities A 20 units B 30 units C 10 units D 40 units 100 total E 2 units F 3 units G 4 units H 1 unit -10 total A 18 units B 27 units C 9 units D 36 units 90 total E 2 units F 3 units G 4 units H 1 unit -10 total 7