SWSI Panel Meeting March 14, 2019 Charleston, SC.

Slides:



Advertisements
Similar presentations
CoABS Grid Military Users Group (GMUG) for the SWMU Tom Martin November 13, 2001 for LCDR Dylan Schmorrow CoABS Program Manager
Advertisements

1 a unit of Information Technology Services AIS Systems Development Modernization Project Enabling business through IT… Project Manager: Kathy Plavko
Information Technology at Emory Client Services Client Services Development Overview.
Electronics, Intelligence & Support Systems Solutions & Integration Charleston, South Carolina Overview.
Atlanta Public Schools Principal Selection Process Human Resources, Center of Expertise Updated March 3, 2014.
EPermits Working Group Meeting Wednesday, September 11, 2013.
Coastal GeoTools ’05, March 7, 2005 Coastal GeoTools ’05 Myrtle Beach, SC March 7, 2005 FGDC Marine and Coastal Spatial Data Subcommittee.
Robotics Division Quarterly Meeting 4 December 2014.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
A Combat Support Agency Defense Information Systems Agency UNCLASSIFIED UNCLASSIFIED Spectrum Access: The Tools to Connect GEMSIS 15 Aug 2011.
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
FGDC Joint Meeting Coordination Group & Executive Committee June 3, 2009.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
IEEE SA SCC Full Revision PAR Development Meeting SCC21 Meeting – October 1-2, 2014 Piscataway, New Jersey Dick DeBlasio, IEEE SCC21 Chair Tom.
Joint Project Planning (JPP) Sessions
Government and Industry IT: one vision, one community Vice Chairs April Meeting Agenda Welcome and Introductions GAPs welcome meeting with ACT Board (John.
DOD STANDARDIZATION CONFERENCE
Joint Program Executive Office for Chemical and Biological Defense
Introduction to Management LECTURE 16: Introduction to Management MGT
Academy of Medical Educators: An Overview New Faculty Orientation College of Medicine Medical University of South Carolina Charleston, SC January 25, 2016.
1 Insert image of project technology if applicable Name of Project.
Open GIS Consortium Charles Heazel March 19, 2003.
Presented by Jon Pastuszynski, Lead M&D Engineer
IFMA Southeast Michigan Strategic Plan Summary Report
DoD Practical Challenges
Informatics Technology (ITECH)
AMMO WG Face-to-Face Meeting
Agenda Review Doug - Agenda review
NSRP Joint Panel Meeting
Cost Model Based Network Design
AMMO WG Face-to-Face Meeting
Business Technologies Panel
Flexible Infrastructure Bulkhead Track Improvements Final briefing to NSRP SWSI Panel March 29, 2018 John Walks Ingalls Shipbuilding Mechanical Engineer.
Capital Investment Network Update on hub Programme
Impact 44 NSRP Impact 28 Impact 28 Segoe UI 20 Impact 20
Bull Run Middle School School Advisory Meeting, 6:30 – 8:00 p.m. Library.
Westfield State University
Strategic Plan Implementation July 18, 2018
Introduction Introduction
Atlanta Control-M User Group Meeting
RadCalNet/Landnet process for adding new sites
Program Update Surface Preparation & Coatings Panel All Panel Meeting
Presented by: John Mazurowski March 12, 2019 Charleston SC
Thermal Insulating Coating to Achieve R Value Using Aerogel
Ship Design & Material Technologies Panel
RAC-CUTC Partnership Opportunities: Where have we been?
Society of American Military Engineers Tulsa Post
2019 NSRP All Panel Meeting March 12-14, 2019 Charleston, SC.
Business Technologies Panel
Electrical Technologies Panel Chair’s Report
2019 NSRP All Panel Meeting March 12-14, 2019 Charleston, SC.
Donald Hamadyk Director, Research and Development
Program Update Ship Warfare Systems Integration Panel All Panel Meeting March 14, 2019 Charleston, SC.
HN Network Support Events
Workforce Development Panel
Sheet Metal Modernization ManTech Project No. S2702
State of the Panels 2019 NSRP All Panel Meeting.
Kalima Rose & Axel Santana
Planning, Production Processes & Facilities
Team Based Care Kick off Webinar
Welcome to the CCTST Virtual Meeting on Social Determinants of Health
Central Valley Water Board Meeting of 29 March 2012
Impact 44 NSRP Impact 28 Impact 28 Segoe UI 20 Impact 20
San Francisco Bay Water Board
Shipboard Cable Trays 07/24/19 Atlanta, GA
Cost Reduction of Shock Application Project Overview for NSRP Panel Meeting July 16, 2019 Kristi Carroll and John Walks.
NSRP Electrical Technologies Panel Meeting – July 23-24, 2019
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
Program Update Planning, Production Processes, and Facilities Panel Meeting October 9-10, 2019 Bath, ME.
Presentation transcript:

SWSI Panel Meeting March 14, 2019 Charleston, SC

AGENDA Time Presentation Speaker 8:00 Convene Meeting 8:05 Introduction / Panel Chair Welcome / Chair Report Haymon 8:10 NSRP Update ATI 8:30 Panel Update/CIPP Overview 9:00 PEO C4I Presentation Charles Auxter 10:00 2018 Panel Project Status - TRITON John Mazurowski 11:00 Discuss Afternoon Tour of SPAWAR Charleston Haymon/Auxter 11:30 Review Action Items / Closing Remarks 12:00 Adjourn – Leave for SPAWAR ALL TBD Start SPAWAR Tour Dorsey/Auxter

Current Panel Activities Ongoing Panel Projects TRITON: Tactical Resilient Infrastructure Twinning Optical Network (Penn State, 2019) New Sponsor for NSRP PEO C5ISR – SPAWAR Representative – Chuck Auxter, SPAWAR Charleston

Current Panel Activities Panel Projects for 2019 Top Three Projects for 2019 TRITON Dynamic Network Paradigm: Analysis and Demonstration – Penn State Alternate False Deck Design Optimization And Qualification – NNS Extension Basis for 72 Inch POA Enclosure Systems to DDG and CG Ships – NNS Joint Panel Project for 2019 – Electrical Panel Fusion Splice Enclosure At Equipment - NNS Additional Project Submission for 2019 Design of a Shock Isolated False Deck (SFID) Principal Unit and Development of an Environmental Qualification Test (EQT) Strategy - NNS

Mission Statement Reduce the costs of integration and test for warfare systems in ship construction and maintenance/ modernization. Facilitate communications among Navy programs, warfare system integrators, ship designers, shipbuilders and other NSRP panels.

Proposed Revised Mission Statement Reduce the costs of integration and test for warfare and communication systems in ship construction and maintenance/ modernization. Facilitate communications among Navy programs, warfare system integrators, communication system integrators, ship designers, shipbuilders and other NSRP panels.

Future Panel Activities Continue to focus on commonality Continue to identify opportunities to support the “Flexible Warship” concept Continue increasing involvement from Combat System OEMs Start Working with newest Government sponsor PEO C5ISR and their OEMs Continue to evaluate if the results of SWSI Panel and RA projects and verify they are beneficial to the Navy and the NSRP members Increase collaboration with other panel