TGn Closing Report Vancouver, BC, Canada 802 Plenary March 2009March 2009 January 2009 802.11-09/0412r2doc.: IEEE 802.11-09/0412r0 doc.: IEEE 802.11-09/0107r0 March 2009 March 2009 TGn Closing Report Vancouver, BC, Canada 802 Plenary Date: 2009-03-13 Authors: Name Company Address Phone email 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) 427-4098 Bruce Kraemer Marvell bkraemer@ marvell .com Sheung Li SiBEAM 555 Mathilda Ave, Sunnyvale, CA 94085 +1 (408) 245-3120 sli@sibeam.com Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) 616-3800 adrian.p.stephens@ intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Page 1 Bruce Kraemer, Marvell
Sponsor Ballot Recirculation #1 on TGn November 2008 March 2009March 2009 802.11-09/0412r2doc.: IEEE 802.11-09/0412r0 doc.: IEEE 802.11-08/1252r1 March 2009 Sponsor Ballot Recirculation #1 on TGn Sponsor recirculation ballot closed March 07 and passed with a 80.1% affirmative vote (169 approve, 42 not approve, 17 abstain) 77 comments received During March meeting, All comments resolved, and editor empowered to create TGn Draft 9.0 for further balloting Bruce Kraemer, Marvell Page 2 Bruce Kraemer, Marvell
TGn - Primary March Meeting Documents March 2009March 2009 802.11-09/0412r2doc.: IEEE 802.11-09/0412r0 doc.: IEEE 802.11-09/0412r0 March 2009 March 2009 TGn - Primary March Meeting Documents SB #1 Comment Composite 11-09- 0024 r5 Meeting Report 11-09- 0219 r10 Editors Report 11-09- 0251 r1 Closing Report 11-09- 0412 r0 Meeting Minutes 11-09- 0326 r0 TGn Draft 8.0 Bruce Kraemer, Marvell Page 3 Bruce Kraemer, Marvell
Mar ’09 to May ‘09 TGn Teleconference Plan March 2009March 2009 802.11-09/0412r2doc.: IEEE 802.11-09/0412r0 March 2009 Mar ’09 to May ‘09 TGn Teleconference Plan Call time: 11:00 – 13:00 ET Call number: 916-356-2663 Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode Mar 11 Plenary Mar 18 5 2457232 Mar 25 W topics Bruce Kraemer 5282348 Apr 01 5228709 Apr 08 9662615 Apr 15 3527796 Apr 22 3309270 Apr 29 3813773 May 06 7927018 May 13 Interim
TGn Timeline is Unchanged March 2009 March 2009March 2009 802.11-09/0412r2doc.: IEEE 802.11-09/0412r0 doc.: IEEE 802.11-09/0412r0 March 2009 TGn Timeline is Unchanged Event Name Accepted Dates Actual Previously Approved Currently Published PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Dec ‘08 Nov ‘08 Jan ‘09 Recirculation Sponsor Ballot Feb ‘09 May ‘09 Final WG Approval Jul ‘09 Nov ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Jan ‘10 Publication Mar ‘10 Bruce Kraemer, Marvell Page 5 Bruce Kraemer, Marvell