MRL CRG – Cleanaway Update

Slides:



Advertisements
Similar presentations
Certification of Compliance By Evita Lagard
Advertisements

Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Company Overview of Charah Privately held company based in Louisville, Kentucky –Founded in 1987 Dedicated to providing the power industry the highest.
Tullamarine Rehabilitated Landfill > 26 November 2014.
THE WARMING WORLD! Africa’s first CDM ?! Andrew Gilder, 2003.
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
Jerevan November Tailing dams inspection Juliane Knaul Legal Expert, Agency of Mining, Geology and Minerals of Brandenburg, Germany AGENCY.
1.  Consider objectives Control migration of gas Control emission Control odors Maximize gas collection fir energy recovery Comply with regulations 
Western Ave S53X Audit  12 th March 2014  7 pm Mantra.
Tullamarine Rehabilitated Landfill > 27 November 2013.
Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
Pershing Hill Elementary School Burn Pit Stockpile Removal Project 1.
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
ENFORCEMENT/TRAINING & EMERGING TECHNOLOGIES ACTION PLAN UPDATES P&E Committee Feb. 6, 2006.
DAVIE LANDFILL Banu Sizirici. MAPS Vista View Park (Davie Landfill)
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
A Design-Build Success Story Dick Sprague HDR, Inc. Landfill Gas Migration Control.
SAINT FRANCIS HIGH SCHOOL Case Study Continuous Gas Monitoring Sacramento County Environmental Management Department.
Francis Farm Landfill. How’d We Get Here?? Francis Farm Landfill (FFLF) began accepting waste in 1973 and remained open until October years of.
2015 Coal Handling and Storage Conference
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
1 UPDATE ON SHELLEY’S SERVICE CONTRACT Y PD Utilities Department Orange County Board of County Commissioners November 15, 2011.
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
Early Literacy Implementation Reporting for Non-FAST Districts DECEMBER 15, 2014.
Transition Alta High School. OBJECTIVES Timeline Planning Registration 9 th grade transition.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
“The World Bank – Italian Trust Fund for Environmental Protection in CHina” Technical Meetings – Beijing – January 23-24, 2006 Climate Changes Related.
3 STUDENT ASSESSMENT DEPARTMENT
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Plaistow BOS Meeting 7/24/2017
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
QKR Namibia Navachab Gold Mine
Low-Level Radioactive Waste Forum Spring 2016 Meeting – Park City, UT
Big French Creek Slide Timeline of Events
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Regulatory Review of 15A NCAC 02L Groundwater Classification and Standards Jeff Manning - Division of Water Resources Environmental Management Commission.
Tony Almond Onshore Oil and Gas Policy Health and Safety Executive
DLA Strategic Materials: ESOHMS Management Review FY17
Rules for Existing Municipal Solid Waste Landfills
Department of Environmental Quality
Department of Environmental Quality
Low-Level Radioactive Waste Forum Fall 2017 Meeting – Alexandria, VA
Regulatory Review of 15A NCAC 02L Groundwater Classification and Standards Jeff Manning - Division of Water Resources Environmental Management Commission.
Jessica Montie, Division of Waste Management
Indicative PRIDe Project Plan
Department of Environmental Quality
Building Project Updates
Landfilling (Containment and Restoration) in Ireland
A Peek At What We Are Learning
EUC Project Timelines Key Upcoming Dates:
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Department of Environmental Quality
Jessica Montie, Division of Waste Management
Overall Project RAG Status:
June 19 Timelines Key Upcoming Dates:
XRN June 19 Release - Status Update
June 19 Timelines Key Upcoming Dates:
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Ellen Lorscheider, Division of Waste Management
the path less traveled Termination of Post Closure Care
Presentation transcript:

MRL CRG – Cleanaway Update 29 November 2018

Cell Construction Cell 4A construction completed and added to the license. Key environmental improvements: Litter management Re-design of leachate sumps Sub grade works have commenced for Cell 4B-1

Operations Update Screening soil bunds left by Boral Will begin transition into Cell 4A late this week / early next week. New haul constructed. Have begun placing intermediate capping on Cell 3B.

Environment Update November groundwater monitoring event completed. Update to the Landfill Operations Risk Assessment & Landfill Environmental Monitoring Plan. Conditional auditor approval. Environmental Audit commenced. New set of horizontals being installed in Cell 3B Wheel wash repairs completed. Surface emission monitoring underway.

Major Projects Update Major works scheduled in the next 12 months 12 m Litter Nets: Geotechincal works commencing once suitable permits have been issues for drilling (approval required from Department of Mining). Current expected completion July 2019. LFG Upgrades: Design of new LFG ring main going out to tender in December 2019. Construction design for new vertical extraction wells in Cell 2M also going out to tender early in 2019. Leachate Sumps: Will go to tender January 2019 for the development of Leachate Riser Construction Quality Assurance Plan and subsequent construction of new leachate risers.