Receiving Inspection on incoming goods

Slides:



Advertisements
Similar presentations
CENTRAL CONTRACTOR REGISTRATION (CAGE CODES) DFARS Case 2003-D040 DFARS Parts 204, 212, 213 and 252 are amended to remove policy on Central Contractor.
Advertisements

Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
Quality Assurance/Quality Control Policy
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Office of Risk Management Annual Conference Emergency Procurements Tammy Grant, CPPB State Purchasing Assistant Director
Mission-Critical Work in the Water/Wastewater Industry.
SHE Code 26: Safe use of Lifting Equipment and Lifting Accessories Safety, Health and Environment (SHE) Group.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
Control of Hazardous Energy Lockout/Tagout 29 CFR
From Research Prototype to Production
DISPLAY FIREWORKS SEMINAR PARIS LAS VEGAS HOTEL February 21,
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
PROFESSIONALISM OF THE INSULATION INDUSTRY. Content Introduction NIA Code of Professional Practice Code of Professional Index Membership Criteria & Complaints.
Introduction to Computers Lesson 12A. home Information System A mechanism that helps people collect, store, organize and use information.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
APA – Fundamentals of Payroll Chapter 2 – Payroll Systems March 10, 2012.
WIC CONFIDENTIAL INFORMATION SPRING 2014 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH WIC PROGRAM.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Start the program by pressing “enter”.
IUID and Government Furnished Property Basics
Strategy for conformity of non-standard cryogenic equipment
Administration of a FIDIC Contract - Project Control
Bell Work List 3 safety procedures that we have here at school-why we have them- and the purpose behind them. 6/30/2018.
Bidder’s conference – 21st May 2013
EP Experiments safety validation process Safety Permits
Documentation status in WP 5 Goal: To collect all documentation/know-how needed in a structured way for the ESS installation, commissioning, operation,
THE EMPLOYER Right, of access to the site.
First Article Inspection
Contractor management at Sasol Mining
Helen Boyer OHS group leader
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation Binder / IRR – an example
Mattias Skafar Head of Quality Division
Quality Regulation for Mechanical Equipment RESSQ – Mech
Workshop commissioning Installation Coordination at ESS
Contractor management at Sasol Mining
Progress on Standardization
PSS verification and validation
European Spallation Source ERIC Procurement
Rules for Mechanical Design and Pressure Testing for Detector vessel
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
Machine Protection PLC Based System Verification and Validation Plan
Controlled Substances
Licensing update ESHAC #7, October 2017
ESS Handbook on Radiation Protection Chapter 5 – Radioactive material
Atefeh Sadeghzadeh Control engineer – Target safety and control
Eltronic A/S Engineers 50 Engineers
Target Safety System Interfaces
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
ESHAC#7 General Q-progress CE marking
Presentation transcript:

Receiving Inspection on incoming goods Conny Wendt - Quality Inspection Technician www.europeanspallationsource.se 6 May, 2019

Receiving Inspection What is the purpose with the Receiving inspection? Act as a independent reviewer of incoming goods Secure that the requirements set by internal and external stakeholders are met. Capture important technical documentation. Don't see us as a burden, see us as a helping hand. our collective goal is to build and maintain ESS.

What to inspect? ESS-0102301, ESS procedure for receiving inspection Inspections will be performed with a graded approach focusing on high cost and risk. Selection will be done according to following criteria's: Safety SSC´s Quality Class according to: ESS rule for identification and classification of safety important components, ESS-0016468. ESS Rules for Quality Regulation - Mechanical Equipment, ESS-0047989. ESS rules for radiation safety classification of Electrical and I&C equipment including technical and quality requirements, ESS-0054158 ESS rules for radiation safety classification of civil structure including technical and quality requirements, ESS-008383 ESS rules for quality requirements applicable to HVAC systems and components, ESS0083831 ESS rules for radiation safety classification of lifting equipment including technical and quality requirements, ESS-0135186 The following are requirements for components purchased by ESS: Mechanical equipment; All components in quality class 1-4 Field instrumentation; All components Electrical equipment; All components in category A Equipment selected by WPM in collaboration with Quality Department. If the agreement with in-kind or other contractor’s states that they are responsible for delivery of the supplied material/components to site, a procedure shall be approved by ESS Quality Department on how to secure delivered goods. In-kind: This will also applies to procurement where the supplier installs and/or manage the operation for a time

Receiving Inspection What will we look at? Markings according to documentation Special pointer according to Technical Agreement Control plans According to Receiving Inspection Report (ESS-0118174)

Receiving Inspection. Receiving inspection will be performed in two parallel steps: Physical inspection Document control The result of the inspection is documented in the “Receiving Inspection Report(RIR)” and stored in CHESS.

Workflow – Receiving Inspection Start End Logistics ESS-0042154 To Projects Address control Content Control Damage Control Document Control Receiver Notification Goods Handover To Storage Security / Dangerous Goods ESS-0122078 Classification Dangerous Goods Control Security Control WPM / Goods Receiver Receiving Inspection N Item Control Y Dialog WPM/QI Corrective Action Quality ESS-0102301 Physical quality inspection N Approved Blocked Goods Contact WPM Issue NCR Receiving inspection approved Document Review Y Report issuing and filing

Thank You for your time!