Infrastructure Interface – Power, cooling & building

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0647r1 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Advertisements

Doc.: IEEE /0647r0 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Web Services Architecture An interoperability architecture for the World Wide Service Network.
Beamformer implementations (Mike Jones, Kris Zarb Adami, David Sinclair, Chris Shenton) Starting with top level considerations for now, ie Not, which FPGA.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
Process ITV Model-based Analysis and Design of Embedded Software Techniques and methods for Critical Software Anders P. Ravn Aalborg University August.
Protocol Architecture The “Common Language”. Copyright by Jorg Liebeherr 98, 99 Need for Protocols Protocols are a set of rules and conventions. By enforcing.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
Level 1 - LRO Requirements ESMD-RLEP-0010
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF? Infra ICD Leads.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Heather Beam Thomas Bean Megan Chapman Steven Geiger Kimberly Keating.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Services in a Converged WAN Accessing the WAN – Chapter 1.
Provides an overview of the main components in the simulator. Shows the relation between functions, data and user-inputs. The design is broken up into.
Kicker generator and controls installation in ECA5? Etienne CARLIER
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Configuration Mapper Sonja Vrcic Socorro,
Scenarios for oneM2M and OIC Interworking
SKA Interface Workshop: AIV Interfaces – Summary and Wrap AIV consortium Manchester June 2013.
SKAO Power Update 2015 Engineering Meeting: Penticton Adriaan Schutte
Network Programming Chapter 1 Networking Concepts and Protocols.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Describing MCM Mission Package Software Interoperability with Architectural Descriptions.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Chapter 2 Network Models
1 AS-1C1, EO/IR Signal Sets The charter of the EOIRSS TG is to define, develop and formally standardize EO/IR sensor electrical and physical interfaces.
AADC - LFAA 12-Apr-161 Aperture Array Design & Construction Consortium Low Frequency Aperture Array (LFAA) LFAA System Requirements STFC (UK ATC) Prepared.
AADC - LFAA 10-May-161 Aperture Array Design & Construction Consortium Low Frequency Aperture Array (LFAA) Signal Processing and Commissioning Software.
SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
Low.CBF MC High-Level Architecture 4-6 July 2016 Edinburgh 1 Low.CBF M&C High-Level Architecture – Focusing on the LMC-CBF interface John Matthews Edinburgh.
M&CML: A Monitoring & Control Specification Modeling Language
Local Monitor And Control SADT.NMGR
Thermal Analysis of the SKA Electronics Cabinets
BIPV Atlantis Energy Systems Inc.
Maintain, Manage And Monitor Outdoor Systems Remotely
BIM EXECUTION PLANNING PROCESS
Equipment simplified model SMR UR safety
Concurrent Engineering Aspects of HXs
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Network Architecture Layered system with alternative abstractions available at a given layer.
Mini-RF Requirements Overview
Signalling Requirements for End-to-End IP QoS
FC facilitation of Installations
SKA Element Interface Management Workshop CSP Element
Correlator – Backend System Overview
Proposal on system description, reference model and draft outline
BIM EXECUTION PLANNING PROCESS
ITU-T Workshop on IP/Optical Chitose, 9-11 July 2002 Session 9 – Optical Network Management Kam Lam (Lucent) – SG15 Q14 Rapporteur & Nobuo Fuji (NTT)
LO/IF Switches Doug Scott
Systems Engineering Tool—applying tools to engineering systems
Baseline (Aiming for 4): Describe some
SADT Overall Summary Total ICD count is currently 37 system level ICDs across 6 Elements LFAA 3 ICDs DISHES 7 ICDs CSP 12 ICDs TM ? Unable to proceed.
Chapter 2. Protocols and Architecture
e-Invoicing – e-Ordering 20/11/2008
Use your Journal to Name the Transformations
SDP Interface Identification
SDP-lead Interfaces Summary
Safety Readiness Review (SRR) Thomas Hansson, ESH
Summary in pictures Overview of work processes of phytosanitary activities supported by Traces or national system Traces – what functionalities can be.
For More Details:
Overview of the TARGET Monolith Rough Vacuum
Types of Energy Chemical Solar.
Electronic : PH0 (former IH0)
Presentation transcript:

Infrastructure Interface – Power, cooling & building Description Building specification: # of racks, Power: total and rack level reticulation Cooling No data connection. Work on solar power @ antenna T0: Outline requirements description, initial ICD T0+12: Detailed ICD assuming architecture PDR: Confirmed architecture, so firm ICD . Leadership: LFAA element Other party: INFRA element LFAA WP: SKA.TEL.LFAA.LINFR.PWR Type: Direct Classes: Electrical, Mechanical, Building desc. physical i/face Thermal Safety aspects: yes I/face specs by class: International standards and National (Australian) standards

CSP – Data transfer Description Leadership: LFAA element Data transfer of beams to Correlator Time stamping and modes Protocol through switches T0: Baseline req’ts description, initial ICD T0+12: Detailed ICD , with further options assuming architecture PDR: Confirmed interface w/architecture, so firm ICD . Leadership: LFAA element Other party: CSPelement LFAA WP: SKA.TEL.LFAA.SP.ARC Type: Indirect Classes: Data exchange specifications Safety aspects: no I/face specs by class: International standards