MuonGeoModel: status and plans

Slides:



Advertisements
Similar presentations
E.K.Stefanides March 07, The Muon Spectrometer of the ATLAS detector: progress report on construction and physics studies at the University of Athens.
Advertisements

Giuseppe Roselli (CMS-RPC) Università degli Studi di Bari – INFN RPC Efficiency with Track Reconstruction Giuseppe Roselli.
N. Saoulidou Fermilab 1 Update on track reconstruction in the Near Detector N. Saoulidou, Fermilab
ACAT05 - DESY Zeuthen125/05/2005 Detector Description of the ATLAS Muon Spectrometer and H8 Muon Testbeam D. Pomarède CEA/DAPNIA/SEDI/LILAS - Saclay.
12/06/2008Muon Week - CERN1 Muon Detector Description status and plans summary of contributions from Laurent Chevalier, Andrea Dell’Acqua, Jean Francois.
MuonGeoModel Structure Clients Validation run-time Conditions EDM Raw geometry issues Available Tools Status Connection with the COOL Alignment (A-lines)
Slow Neutron Background Simulation " Long-lived neutrons created, diffuse around collision hall " They get captured by nuclei, emitting a photon " Compton.
Neutron Background Simulation R. Wilkinson. 2 Neutron Background Simulation Long-lived neutrons created, diffuse around collision hall They get captured.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
Framework for track reconstruction and it’s implementation for the CMS tracker A.Khanov,T.Todorov,P.Vanlaer.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
Alignment Strategy for ATLAS: Detector Description and Database Issues
1.Check Laser track of B=0 run and exclude some tracks in order to get precise GGV eff, which in turn is used when extract T1, T2 value by pos-B and neg-B.
28/05/2008Muon Combined Performance Meeting 1 Muon Detector Description and Simulation status and plans summary of contributions from Laurent Chevalier,
Manoj Kumar Jha INFN – Bologna On Behalf of ATLAS Muon Calibration Group 20 th October 2010/CHEP 2010, Taipei ATLAS Muon Calibration Framework.
1 Gabriella Cataldi (INFN Lecce) Michela Biglietti (Universita’ di Napoli-Federico II) and the HLT.
1 Michela Biglietti (Universita’ di Napoli-Federico II) Gabriella Cataldi (INFN Lecce) and the HLT.
19/07/20061 Nectarios Ch. Benekos 1, Rosy Nicolaidou 2, Stathes Paganis 3, Kirill Prokofiev 3 for the collaboration among: 1 Max-Planck-Institut für Physik,
A few issues about MuonGeoModel stefania spagnolo 2/7/08.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
Muon-raying the ATLAS Detector
14/11/2007CERN - Muon Week1 Detector Description status and plans Laurent Chevalier Dapnia – Saclay Stefania Spagnolo Univ. del Salento and INFN Lecce.
1 MuonGeoModel status report focus on issues relevant to , 20 Access to Condition DB with M. Verducci, R. Harrington MDT deformations with I. Logashenco.
Muon Reconstruction with Moore and MuonIdentification The Moore/MUID group Atlas Physics Workshop Athens, May 2003.
/MuID status report on behalf of the Moore/MuID group. Status in the releases ( Units Migrations DC1/G3 MuonGeoModel Migration DC2/G4) MuID updates Trig.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
S t a t u s a n d u pd a t e s Gabriella Cataldi (INFN Lecce) & the group Moore … in the H8 test-beam … in the HLT(Pesa environment) … work in progress.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
30/09/081 Muon Spectrometer Detector Description Outline: - Present situation - Dead Matter - Validation - GeoModel.. Laurent Chevalier, Andrea Dell’Acqua,
12/06/2008Muon Week - CERN1 Muon Detector Description status and plans summary of contributions from Laurent Chevalier, Andrea Dell’Acqua, Jean Francois.
L1 Global Muon Trigger Simulation Status URL of this presentation:
18/04/2007Muon Week - CERN1 Detector Description status report Laurent Chevalier Stefania Spagnolo.
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
Muon identification in ATLAS Peter Kluit (NIKHEF).
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
Pixel Offline Status Jianchun Wang Syracuse University 10/28/04, Pixel testbeam meeting.
LCLS Commissioning & Operations High Level Software
V4-18-Release P. Hristov 21/06/2010.
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
CALGO: Software Tasks cal software:
MC ’04-’05 objectives                                                       
Calibrating ALICE.
slicPandora: slic + pandoraPFANew
Progress with MUON reconstruction
Commissioning of the MUON Spectrometers in ATLAS and CMS
TPC status - Offline Q&A
Barrel RPC Conditions Database
LCLS Commissioning & Operations High Level Software
Muon Spectrometer Detector Description
ATLAS Muon Spectrometer and
DC monitoring - calibration - simulation - corrections
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
CSC Simulation Status Trigger very sensitive to wire timing!
MuonGeoModel status of progress on main items
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Update primary numbers active part
Search for coincidences and study of cosmic rays spectrum
MuonGeoModel – recent developments
Mdt example now: MdtReadoutElement = 1 multilayer
Agenda SICb Session Status of SICb software migration F.Ranjard
Implementation of Chamber Misalignments and Deformations in the
Moore LVL2 interface and Moore status
BesMUC Reconstruction Algorithm
Generics, Lambdas and Reflection
Presentation transcript:

MuonGeoModel: status and plans Simulation on slc4 64-bits platforms: Recent tests used to disable the Muon Spectrometer because of a crash in MuonGeoModel Fixed an instrinsic type mismatch in RpcReadoutElement (MuonGeoModel-00-02-79 collected for 12.5.0) Common tracking EDM: Duplication of RPC, TGC, CSC surfaces to separate eta and phi views, so that generic track-fitters can treat eta and phi measurements in the same way Changes to the code well defined; will go into 13.0.0 Deformations (B-lines parameters): not yet implemented but the strategy is defined (main contributor in the past T. Moore) Implementation limited to the readout geometry (layer used by reconstruction client, not by the simulation) All deformations (other than sagging) can be represented as displaced wire end-points for a rigid wire (some related calculation implemented in MdtChamberDeformationSvc) MuonGeoModel will hold B-line parameters in a new class, they will be updated run-time by some service querying cond DB on a IoV basis MuonGeoModel will use B-line parameters to correct tube positions and transforms with the methods provided in MdtChamberDeformationSvc Corrected geometry will be transparently available to tracking clients New contributors available in this field: Ivan Logachenco and others No time scale yet