Transmission Workstream 1st February 2007

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Advertisements

UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfer & Trades Special Transmission Workstream
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Transfers and Trades Transmission Workstream
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transmission Workstream 6 January 2011
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Transmission Planning Code
Transmission Workstream, 2nd March 06
Transmission Workstream, 6 August
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Entry Capacity - update
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
Annual Review - Methodology Statements
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Development of Entry Capacity Substitution
Transmission Planning Code Review
QSEC auction timetable
Entry Capacity Substitution
MOD Deemed applications – User pays initial thoughts.
Wales & West Utilities Mod 0671 User Commitment
Entry Capacity Transfer and Trade
Transmission Workstream – 6th July 2005
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Additional Gemini API’s UK Link - Class 3 Modification
Optimisation of Entry Capacity Modification Proposal
Review: Entry Capacity Transfer and Trade Methodology Statement
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream, 1 Mar 07
Entry Capacity Transfers - Constrained Period
Transmission Workstream 05 November 2009
OFFERING CAPACITY AT DONOR ASEP IN TRADES & TRANSFER PROCESS
Presentation transcript:

Transmission Workstream 1st February 2007 Capacity Transfers Transmission Workstream 1st February 2007

Scope of Inter-nodal Capacity Transfers / Trades Constrained Period Shipper led process Unconstrained NGG led process Entry Trades (sold capacity) Transfers (unsold capacity) Transfer of unsold capacity in response to User signals. Intent is to minimise NTS investment. Exit NB – Mod 116v would permit inter-zonal exit (flex) capacity trades

Capacity Release Methodology Statements Constrained Period Unconstrained Entry Entry Capacity Transfer Rate Methodology Statement Entry Capacity Trade Rate Methodology Statement Incremental Entry Capacity Release Methodology Statement (SC C15) Exit Exit Capacity Baseline Revision Methodology Statement Exit Capacity Release Methodology Statement (SC C18) * New statements required under the proposed licence